Forwards Insp Rept 50-213/86-20 on 860708-0814 & Notice of Violation.Concern Indicated Re Inadequate Interface Between Operators & Maint Personnel,Possibly Resulting in Plant Operation W/Equipment Not Fully Operational
ML20214L326
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 08/29/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20214L329 List:
References
NUDOCS 8609100090
Download: ML20214L326 (2)


See also: IR 05000213/1986020

Text

_ .

.

-.

.

,-

.

AUG 2 91986

Docket / License: 50-213/DPR-61

Connecticut Yankee Atomic Power Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Resident Inspection 50-213/86-20

This transmits the findings of the routine NRC inspection of the Haddam Neck Plant

on July 8 through August 14, 1986. These findings have been discussed with

Mr. R. Graves of your staff.

Based upon the results of this inspection, it appears that certain licensee acti-

vities were not conducted in full compliance with NRC requirements. Please respond

to these matters in accordance with the enclosed Appendix A.

With regard to item 2 of Appendix A, we note that corrective action for the two

similar breaches of containment integrity cited in NRC Region I Inspection Reports

50-213/84-14 and 86-08 did not prevent this occurrence. Therefore, in your reply,

please emphasize how the corrective actions taken for this item will prevent fur-

ther recurrence.

We are also concerned that inadequate interface between operators and maintenance

personnel may have resulted in plant operation with equipment not fully operational.

In one case (Report Detail 4.2), operation continued with only one of three emer-

gency boration paths operational because operators apparently failed to take timely

followup action in response to abnormal pump. indications. In the second instance

(Report Detail 4.8), operators apparently failed to recognize that repairs to the

nuclear instrumentation system had changed system performance such that recalibra-

tion was required. In your response to this letter, please include your assessment

of the cause of these events and identify your corrective actions.

l Your cooperation with us is appreciated.

Sincerely, Original Signed Bya

g$

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: NRC Region I Report 50-213/86-20

8609100090 860829

gDR ADOCK 05000213

PDR @[

- - _ _ _ _ _ - - -

. .

  • '

-

e. -

~

I

Connecticut Yankee Atomic Power Company 2

AUG 2 91986

cc w/ encl:

R. Graves, Plant Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

E. J. Mroczka, Vice President, Nuclear Operations

Gerald Garfield, Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc w/ enc 1:

, Region I Docket Room

DRP Section Chief

M. McBride, SRI, Pilgrim

J. Shedlosky, SRI, Millstone 1 & 2

T. Rebelowski, SRI, Millstone 3

F. Akstulewicz, LPM, NRR

J. Wiggins

j

,

RI:DJR

RI RP . RI:DRP

,

'V frt

)Swetland/meo McCabe

s Wenzinger

8/18/86 gltg ( 7s

0FFICIAL RECORD COPY

l

l