_
.
.
,-
.
.
AUG 2 91986
Docket / License:
50-213/DPR-61
Connecticut Yankee Atomic Power Company
ATTN:
Mr. J. F. Opeka
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut
06101
Gentlemen:
Subject:
Resident Inspection 50-213/86-20
This transmits the findings of the routine NRC inspection of the Haddam Neck Plant
on July 8 through August 14, 1986. These findings have been discussed with
Mr. R. Graves of your staff.
Based upon the results of this inspection, it appears that certain licensee acti-
vities were not conducted in full compliance with NRC requirements.
Please respond
to these matters in accordance with the enclosed Appendix A.
With regard to item 2 of Appendix A, we note that corrective action for the two
similar breaches of containment integrity cited in NRC Region I Inspection Reports
50-213/84-14 and 86-08 did not prevent this occurrence.
Therefore, in your reply,
please emphasize how the corrective actions taken for this item will prevent fur-
ther recurrence.
We are also concerned that inadequate interface between operators and maintenance
personnel may have resulted in plant operation with equipment not fully operational.
In one case (Report Detail 4.2), operation continued with only one of three emer-
gency boration paths operational because operators apparently failed to take timely
followup action in response to abnormal pump. indications.
In the second instance
(Report Detail 4.8), operators apparently failed to recognize that repairs to the
nuclear instrumentation system had changed system performance such that recalibra-
tion was required.
In your response to this letter, please include your assessment
of the cause of these events and identify your corrective actions.
l
Your cooperation with us is appreciated.
Sincerely, Original Signed Bya
g$
Edward C. Wenzinger, Chief
Projects Branch No. 3
Division of Reactor Projects
Enclosure:
NRC Region I Report 50-213/86-20
8609100090 860829
gDR
ADOCK 05000213
@[
- - _ _ _ _ _ - - -
.
.
- '
e.
-
-
I
~
Connecticut Yankee Atomic Power Company 2
AUG 2 91986
cc w/ encl:
R. Graves, Plant Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
E. J. Mroczka, Vice President, Nuclear Operations
Gerald Garfield, Esquire
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bcc w/ enc 1:
Region I Docket Room
,
DRP Section Chief
M. McBride, SRI, Pilgrim
J. Shedlosky, SRI, Millstone 1 & 2
T. Rebelowski, SRI, Millstone 3
F. Akstulewicz, LPM, NRR
J. Wiggins
j
,
RI:DJR
RI RP
. RI:DRP
)Swetland/meo
'V frt
,
McCabe
s Wenzinger
8/18/86
gltg
( 7s
0FFICIAL RECORD COPY