Forwards Safety Insp Rept 50-341/85-52 on 851202-860313. Decision Re Enforcement Action Based on Insp Findings Will Be Sent by Separate Correspondence
ML20202F041
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/08/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
Shared Package
ML20202F045 List:
References
NUDOCS 8604140093
Download: ML20202F041 (2)


See also: IR 05000341/1985052

Text

.

'

.

.

APR 8 1986

Docket No. 50-341

The Detroit Edison Company

ATTN: Mr. Frank E. Agosti

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the special safety inspection conducted by Mr. P. D. Kaufman

and others of this office on December 2-5, 17, 1985, and January 13-16, 21-23,

February 4-6, and March 13, 1986, of activities at Fermi Nuclear Power Plant,

Unit 2, authorized by Facility Operating License No. NPF-43 and to the

discussion of our findings with Mr. J. Conen at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination.of procedures and representative records, observations, and

interviews with personnel.

We are releasing this report at this time for your information. You will be

notified by separate correspondence of our decision regarding enforcement

action based on the findings of this inspection. No written response is

required until you are notified of the proposed enforcement action.

In accordance with 10 CFR 2.790 of the Comissicn's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection. s

'

Sincerely,

e609140043 860408

M

PDR ADOCK 05000341 -C. . ..; .,J.I

'

  • ,.._3.., . .........

.. -. ,G,' .u......I 1 ,

O PDR

J. J. Harrison, Chief

Engineering Branch

Enclosure: Inspection Report  ;

No.50-341/85052(DRS) l

i

S_ee_A_ttached Distribution

So

RIII R I RIII RIII RJ

R111 R) I

G .d,tl., <

-

e .

Oc 33,N

Kaufman/lc 4pker Muff t son

j

WI1 i Harrison Pa er ello

4/ T/86 gel, 4 Ji (9  % ]g/gL

1 50/lh

__

.

.

.

The Detroit Edison Company 2 APR8 1986

cc w/ enclosure:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

fluclear Facilities and

Environmental Monitoring

Section

Monroe County Office of

Civil Preparedness