Rev 0 to Procedure CP-CPM-18.1, Const-Maintained QA Records
ML20198K450
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 04/27/1981
From:
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To:
Shared Package
ML20197J316 List: ... further results
References
FOIA-85-59 CP-CPM-18.1, NUDOCS 8606040032
Download: ML20198K450 (3)


Text

.

a r-.

'1l 6 &

I!!DEXto SROWN & ROOT, INC. PROCECURE ;Dec, WVE i CPSES NUMBER RE7ISION DATE ME JOB 35-1195 C P-C PM-18.1 0 4/27/81 1 of 3 TITLE: ORIGINATOR: . ~%~ M Y-29-81 CONSTRUCTION-R REVIEWED BY:/ na4/ L j[T[ b CAIE d-g #/

p QA/GL CAi-APPROVED SY: WJ & Newd:4? M'WF/

u C0t4STRUCTI0t4 PROJECT MApA)ER GATE o.1 TABLE OF CONTENTS

1.0 REFERENCES

2.0 INTRODUCTION

J.1 2.1 PURPOSE 2.2 SCCPE y 3.0 PROCEDURE =3' "

3.1 DOCUMENT CHECKLIST 3.1.1 Occument Control 3.1.2 Furenasing 3.1.3 Calibration .

3.1.4 Weiding

1.0 REFERENCES

1.1 ANSI fl45.2.9, "Recuirements for Collection, Storage and Main-tenance of Quality Assurance Records for Nuclear Power Plant".

1.2 ASME Section III, paragraph 4930, " Retention of Records".

2.0 INTRODUCTION

2.1 PURPOSE The purpose of this procedure is to identify QA Records wnich dre maintained by construction.

F 2.2 SCOPE This procedure a::alies to those records that are generated fcr construction and are specified as being Quality Assurance re-cords. Excluded from the scope of this procedure are Pose records that are of a verification nature and are currently stored by the QA Department.

l 8606040032 060527 PDR FOIA GARDE 85-59 PDR e

-g d'- /22 ,

7:

PROCEDURE i i EFFECTIVE BROWN & RCOT, INC. NL'MSER I REVISION l DATE l PAGE es CPSES I .

JOB 35-1195 i CP-CPM-18.1 j 0 l 4/27/81 l 2 of 3 NOTE: For records generated prior to commercial operation, the retention pericd begins on the date of commercial ocera-tion.

record retention periods have been cmitted.

r records cited herein shall be maintained through-out construction. Prior to commencement of commercial operation, these records shall be submitted to the Per-manent Plant Records Vault Supervisor who shall be re-sponsible for the assignment of retention periods in accordance with references 1.1 and 1.2.

' 3.0 PROCEDURE 3.1 DOCUMENT CHECKLIST The following is a checklist of records, segregated by responsi-ble department, that shall be maintained by Construction.

3.1.1 Document Control

1. All construction procedures.
2. Welding Procedures.
3. Storage and maintenance requirements.
4. Design and construction drawings including:
a. BRH's
b. Hanger Location Drawings
c. BRP's
d. Field Sketches
1. Civil
2. El ectrical
3. Instrumentation
4. Mechanical
e. Vendor Drawings
f. Gibbs & Hill, Inc. Design Drawings
1. Architectural
2. El ectrical
3. Mechanfcal
g. Miscellanecus Steel Drawings '
x. h. Rebar Drawings
i. Concrete Isemetric Drawings e

~ ' .V PROCEDUR:- F:ECTIVE BROWN & RCOT, INC. NUMBER REVISION DATE PAGE b CPSES l

l  !

JOB 35-1195 a CP-CPM-18.1 0 l 4/27/81 3 of 3 l l

j. Lighting Drawings
5. Design Records
a. Design Change Requests
1. DCRP - Design Change Request to Procedure
2. FPAR , Field Problem Action Request
3. FICR - Field Interpretation Clarification Request
4. FDCR - Field Design Change Request
b. Design Changes / Deviations
1. CMC - Component Modification Card
2. DCA - Design Change Authorization
3. DECD - Design Engineering Change Documentation
4. DCDD - Design Change Deviation Document
5. DCDDA - Design Change Design Deviation Authorization
6. Vendor Manuals - Includes design, installation, maintenance "

and/or operation manuals.

7. Design Specifications, including revisions and addendums.

3.1.2 Purchasing

1. Procurement Specifications
2. Purchase Orders, including amendments
3. Pre-Bid Eviluation Form
4. Final Biddei s List 3.1.3
1. IEI Series - Manual of Instrument Engineering Instructions For Calibration Of Measuring And Test Equipment.
2. Personn ification and Training Record
a. Brown & Root Calibration Report
b. Deficient M&TE Evaluation Report
c. Calibration Master Irtdex h]senhwessuruu4rs3lip h dhlvb -[ad 3.1.4 Welding
1. Welder Qualification Matrix e '

_