|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
'
Om WRd, . co em e~. .. "4- fe se' =
iWelding Procedure SpecificJtion No 0101AB138 o,,, 8-4-78
- Revisions 4 3-20-80 5 -
lwE LOING PROCESSIES) 1. Cas Tungsten Arc TYPE Manual
{ 2. Shielded Metal Arc TYPE _ Ma.n ual BASE METALS (OW 403) POSTWELD HE AT T RE ATMENT (OW-4071
- P No I Gr. No. I to P No, 1_ _ Gr. No 1 Type N/A Th.ckness Rar g, .187 thru 1. 812 IN. Temperature N/A *F Pepe Dia. Range Un l 4 *'t t e d Time Range N/A G AS (OW-4081 FILLE R METALS (OW 404) Stuelding Gal 1 Argon i F No.1. 6 2, 4 Percent Comp 100
$A No 1 1 2. I Shield.ng Gas Flow Rate 15 Min. CFH SFA Spec. No 1 5.18 2. 5.1 pu,ge Gas Arnon Flow Rat, E705-2 5 Min . CF H AWS Class No.1 2. E701R Trailing Shielding Gas Composii.on N/A Site of Elect ode 1. N/A 2 3/12,1/ R . 3 /16iN.
'.. Sue of Filler 1 3/32.1/8 2. M/A IN. ELECTRICAL CH AR ACTERISTICS (OW 409)
Electrode - rive Class N/A Current 1. DCSP DC?o 2.
Consumable insert N/A Amps Range 1 80-130 2.70-220 Volts Range 1. R-12 2. 70-10 Tungsten Elec. Sue / Type 1/ M"-1/ R" / M-i r r ? -
( POSITION (OW-105) T ECHNIQUE (OW-1101
'Weid.ng Pos. tion 6C 5,,inge, or Weave Dead 1. Stringer Stringer
_ 2.
Weld ng Progress;cn UDV3rd Bead Width 1 3/8 2. 5/8 lN. (Max.)
Orifice or Gas Cuo Sue 1._1/4-1/2 2. N/A IN
l PR EME AT (OW-406) Initial and Interpass cleaning. Welding surf aces snail De wire brushed
}Frenest Temp - 150
- F (M.n.) o, grounc .5,eo. sired to rer: ove itag. scale or other contam. nan:s.
Interpass . Temp. R aage 150-500 *F Matnod of back gouging N/A l Preheat Maint 150 *F
. Oscillation 1 N/A 2. N/A IN.
JOINT DESIGN (OW-4021 Contact Tube to work distance N/A IN.
'i Groove Des:gn Single U Multicle or Single Layer 1 Multitle Jcint Type OB Yes Cl N/A g5 N/A (p,, Side) 2. Multf"le Backing Matt Type N/A Muttiple or single electrodes Sincle Travel Speed (Rangel 1. 1-3 2. 2-8 IPV Peening Not AllcVed Sk etch /Comm ent s 8606040242 860527 PDR FOIA CARDE85-59 PDR 6A Land: 3/32"+0-1/32" Cap: 3/16"+0-1/16" Prepaied cv ADotowed by h/it.%s;w 5 h-5 L w e$ ' ! O CJ
, wE LDIN(a E NGh E RING DATE M ATER' ALS ENGINEERING DATE
VCH No
[. > t$rOWTKTHOCJE =sw~. m s l
W - 138 ups no.
Hte PROCEDURE QUAllFICATION RECORD 0101A3138 4 WE LDING PROCESS'(ES) 1._ _ Cas Tu .gs t en A-c TYPE ' " a l
- 2. Shielded & tal Arc TYPE Me" A l BASE MET ALS (OW 403) JO6N TS (OW-402)
Mati. Spec. SA- 333 To SA 333 c,oo,,
Type or Grade 6 6 Angle: N/A 7 7
--s .-s P No. 1 Gr. No. 1 To P No. 1 GrNo. 1 Land: 3/32" /- - - h, Coupon OD 8.625 O. D. R ange Qualified Thickness Unlicited
.906 IN. Root Opening: 3/16"
- y,/ /[f, dk
~~ ~ ~ ~
Deposited Weld Metal Thk.1. .125 2, .781 IN. B. S.
Total Thk Range Qualified .187 thru 1.812 IN. Matl.; N/A (Joint Design Used)
FILLE R MET ALS (OW--404) G AS (OW-4081 F . N o.1. 6 2, 4 Shielding Gas Argen A No.1. 1 2. 1 Flow Rate 15-20 CFH SF A Spec. No.1, 5.18 2. 5.1 Purge Gas Argon AWS Class. No.l. E705-2 2. E7018 Flow Rate 5-50 CFH Size of Electrode 1.Not Recorded 23 /3 2.1/ 8. 316N.
Size of Fiuer 1. 3/32.1/8 2, N/A IN. ELECTRICAL CHAR ACTERISTICS (OW-409)
Electrode - Flux Class. N/A Current 1. DCSP 2. DCFP N/A Amps Rangel 90-120 2.80-210 Consumable insert 1. Volts Rangel. 10-12 71-10 2
Trade Name WA Tungsten Elect. Sirefrype Nne Pece-Med POSITION (OW 405) TECHNIQUE (OW-410)
Welding Pcsition 6C Stringer or Weave Bead.1 Strincer 2, S t rinte r Welding Progression Upvard Bead Width 1. 3/8 Max. 2. 5/8 Max. IN Orifice or Gas Cup Size 1. 7/1661/2 2. N / A IN PR EHE AT TOW-406) Osci!!ation 1. N/A 2. N/A IN.
Preheat Temp. 150 *F Multi or Sing'le Layer 1. Muleiole le.terpass Temc. 150-500 *F (Per Sidel 2. N1riSIP g POSTWELD HE AT T RE ATMENT (CW-407)
N/A Multiple or Single Electrodes Sii e l
Type Travel Speed Range 1. 15* R 2,2 1-7 2 IPM Temperature N/A *p Peening Not Used Time Range N/A Backgcuging method N/A TENSILE TEST Specimen Dimensions (IN.) Ulumste Total Ulsknste Unis Charactri of Fa.twre No. F ag. No. Wootn Th.cii nus ^**U"2I Load Lb. Ssrem pai And Location 2 0W-462.1(b) .745 .716 .533 41.900 78.611 Base Metal
_1 QW-462.11b] .748 .725 .542 41.700 76.937 Base Meul GulOED SENO TESTS So.cim en Sp.cim.n
" I No. F eg N o. :Tvoe No. F,g. N o. Type 1 QW-462.2(a) S3 Satis f actory 3_ QW-462.2(a) SB Satisfactorv
,_1 OW-t&2m2(a) _
SB Satisfactory _
4 _QW-462.2(a) _SS Satis f a: torv Weider's Name Don L. R.1:a/ Martin Sopchak S.S. No. 450-04-7704, 456-40-9922 Laboratory Test No 78-162 Test Conducted by B&R Materials Engineering Lab. Address. 3100 Clinton Drive, Houston. Texas per __freorge E._Dawson Date July 31. 1978 We certif y that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of Section IX of the ASME Code.
Signed BROWN & ROOT. INC.
(Manuf acturer)
Date
} ' *20
/) /
a ( I M W,--
. . - - .. .n..... , - - -
I b HOUSTON, TEXAS 0101A3138 l
SUPPLEMENTAL TEST RESULT CHANGE NOTICE CURRENT REVISIONS ARE INOICATED BY CHANGE BARS.
REV. DATE ORIGINATOR 2-9-79 MP , OV6L'_,
1 J. Yen V W1.4,5, 2 4-3-79 J. Bronicki {d 4/ W .L;; u 3 6-20-79 J. Bronicki E V (Chqw 4 3-20-80 M C. L'ainwright
/-I'Odt.4sC -
REVISION NO. .
DESCRIBE THE CHANGE 1 Noted PQR revision.
2 Typed on new form.
3 Added testing labora tory, lab test no. and tes ting date.
4 This document has been reviewed for typographical and technical errors and corrected where necessary. The docu=ent at meets all require =ents of the code of record the date of qualification. Revisions of technical nature listed below are highlighted by change bar(s).
- REVISIONS MUST BE APPROVE 9 BY THE MANAGER OF MATER!ALS ENGINEERING OR HIS DESIG
e Houston. Te x As 0101AB138 SUPPLEMENTAL TEST RESULTS TOUC'rLNESS TEST Type: Charpy "V" Per: ASTM A370 Size: 10t=n x 10c=
Specimen Test Notch Identffication Temp Location Energy Ft-Lbs Mils Lat.Exn. Shear 1 0*F Base 82 .054 30 2 0*F Base 59 .037 30 3 0*F Base 98 .064 40 1 0*F Weld 119 .064 40 2 0*F Weld 117 .062 40 3 0*F Weld 47 .032 20 1 0*F EAZ 155 .065 50
. 2 0*F HAZ 137 .060 70
'3 0*F HAZ 121 .070 99 Radiographic Report of Procedure Qualification: Radiography was acco=plished in accordance with ASME Section V Article 2. The acceptance criteria of AS E Section III, Division I, Subsection NB was cet, v.:
Test conducted by B&R Materists Engineering Lab. Lab No.78-162 Address: 3100 Chnton Drive. Houston. Texas per George E. Dawson Date Julv '41 - 1C74 We certif y that the statements in this secord are correct and that the test welds were prepared, welded and tested in accordance with the above hsted POR and per requirements of the listed code /stendard(s).
Ggned Brown & Roct. Inc.
N
. Date --
By
. l l
3 i 1 MM .1 HOUSTON, TEXAS ~
WPS/POR NO l 0101A3138 CHANGE NOTICE PROCEDURE QUALIFICATION RECORD QUALIFYING WELDING PROCEDURE SPECIFICATION ESSENTIAL VARIABLES CANNOT BE CHANGED. CURRENT REVhSIONS ARE INDICATED BY CHANG WPS/POR REV. DATE ORIGINATOR JMP OV t. '
. POR 1 2-9-79 J. Yen b V. I gC POR 2 4- 3-79 J. Bronicki _ V.. h 02 f (a ._ ws VPS6POR 3 6-20-79 J. Bronicki W _ t # e J_f_( 4 s km e pn o 4 3-20-80 C. k'ainwright /_ / ' //%f s s.: se_3 i
WPS/POR. REVISION NO. DESCRIBE THE CH ANGE PQR I Changed " dashes" to "N/A". Added L7S n'.nber.
PQR 2 Retyped on new for=. Added the following information:
k?S number, joint sketch & dimensions 0.D. range qualified, thickness range qualified per precess, electrode size, electrode-flux class., censumable insert, velding progression, Pk'HT type & time range, purge flow rate, bead vidth, orifice or gas cup size. Changed " passes / side" to " multi or single layer", " number of ares" to "=ultiple or single electrode".
Deleted reference to " atmosphere trade nace", " backing",
and "who by virtue of these tests meets velder perfo:::ance require =ents." Changed coupon diameter from 8" (N.P.S.) to 8.625" (0.D.). Changed filler trade na=e to "N/A". Informa-tion previously indicated under " oscillation" is entered under " bead vidth" and added "N/A" under oscillation. Changed shielding gas & purge flow rate f rom 15CFH min & SCni =in to 15-20 & 5-50. Corrected SMA travel speed from 2.3-4.8 to 2.1-7.2.
k75 3 Deleted reference to supporting PQR and added peening, preheat maintenance and cup size range.
PQR 3 Changed " thickness range qualified" to " deposited veld metal thickness." Added joint dinension infor=ation ,
tungsten size and type, peening and back gouging.
,.73fpqg
, 4 This document has been revieved for typographical and technical errors and corrected where necessary. Tne document meets all requirements of the code of record at the date of qualification. Revisions of technical nature listed below are highlighted by change bar(s).
- MEVl5 TONS MUIT BE APPROVED BY THE WANAGER OF M ATERIALt ENGINEERING OR HIS DESIGNEE
_.