Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, RT Sys Instrumentation & TS Table B 3.3.1-1, RT Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
_,
7-________n j
g 3
t, 1
wamgo,fgvas ~c.
)
((
1 3
m,.
O 3
.w mrvmies
. ;d d
escusTow. Texas
.... 1..
2 t
FOR OFFICE AND w."
CP 1212AA401.Rev0 ASWE a & PV h
' ~
Manual Gas Tungsten Arc
__ TYPE WELDING PROCESS (ES 1
d 2.
N/A TYPE N/A i
s POSTWELD MEAT TREATMF
~
SASE METALS (Cw-.so33 N/A P No Gr. No.
I to P No *N/A m, g, N/A 7y,,
O N/A uni 1mfteo Fiiiets R
Tm
,~.
Thekness Reng, N/A un1imited Fi11ets IN ' T'eneRegs h
Pipe Dia. Rwige
'ml4m4**d Die ' m' 4 *i * *'i IN.
C Range for Filw h
(* A276 To. 316%
W GAS (CW408) ii Af00" f
FILLER METALS (CW-.404)
Shiokisag Gas 1.
1004 di F No.1.
6 2.
N/A Pweent Como.
b A No.1.
8 s
N/A Sheeldng Gas FW Rae 20 C7H (min.)
N/A p % g N/A CPH (min.1 y
SF A Sess. No.1.
69
- 2. N/A Purge Gas N/3 E
AWB Class. No.1.
FQ316
- 2. N/A Troling hiekhng Gas Comoseseen
[
Sise of Elesause 1.
1/U 9 N/A IN' Sies of Piller 1.
3/12 R
El.8CTRICAL CHARACTERISTICS (QW 4001 N/A N/A Current 1.
OCSP e
10 Elessass - Flum Class N/A
[
Canenname insert N/A Amos Range 1.
60 - 120 2_
4 h
voets Range 1.
8 - 12 s
Tungreen Eles. Size / Type 3/32 PCSIT1QN (CW-405)
TSCHNIQUE (CW-J101 80th 1
N/A All Swingst er Weave seed 1 gig welding Posinen lN weksing n,,_ --
SF Ueward Beed Width-See Page 2 I/A - 1/2 IN.
Crifles er Gas C.se Sias h
PREHEAT (CW-dca)
'" '"8 3"''''****' **""8 '0'f***' 'h*si to wies brunnee
- ]
60 TW or ground as roupared to remove stas, assie or other contaminents.
{
hoheet Teno.
60 - 350
inmenses Tane. Reng, N/A
{
Oss58enon1-N/A
- 2.
N/A IN.
fj JOINT DESIGN (QW-402)
Contest Tube in M distanos N/A IN.
et muid ele 7
Groove Design M
w N/A BS N/A
>w i
N/A N/A Cl JointType 08 N/A
- ggnj, Basidag Med Type g
Traves Sooed (Rangel 1.
1-5 2.
N/A iPM hening-not alloweo L
REMARK 3 This Procedure is qualified for non-pressure retaining fill _et welds only.
v ReferenceCodeCaseN-71-9forP8(A194Gr.EM) material.
IfL j'
B606040230 960527 PDR FOIA
{
CARDE85-59 PDR
..I.
('
PREPARATICN APPROVAL DATE Foo. Cooss:
ASME Sec*fon !X. XI O
t li Wecing Eny~neenne, /
CPSES "W- -
hs we /
Ji-n%,=.p m.
Proje/c* W3 ding. Engineer
//_< 4 t
- ,, u,,
1 1
35-1195 r.
p
-(
QLsity Assurenca' '
k l
u WS ff}W W M_ M W M M C M*yg.g3 g,g,
, _(y qqty; y,-
e w --,. a m -.o :,av ~ :-e~-
- nwx w:w..~ : n r:.. e y:-.-n.-gamw--m we~.
. : :~ ~:- -
-,.a E
e w
j' y, 3
!.m]7f"' " l j
WELDING TECMNICUE 3HEET
' A i
17
[
7 w.
9 cacup 1 O ? M.
GRCt.F E8d
*~9
"c 2 2
OS E I'
('-- u. =WX. MANGE wann. =
a m,,- e, h
l A 276 Tp. 316 Fille: Weias only f
i 1,
l.
y l
i 4
A
}S k
A k
d wsLan=G PAAAurTens
-s:= cts VAtues Ans uimauvu e/
PILLamurTAL aAs
}
n sc mc2L m^7^
Tmayat saAo'
,t watm=2 Pt= w m A Tsl=puil & J Amtmacs vogTs s'sso e
Laim siza PmoCass (mj aus M M
s,,tL,. M;,C,;
m3,
,,,,gg mi tmJ
,j 4
3 All GTA 3/32 ER316 Argon 20 N/A DCSP 60-120 8-10 2.5-5 3/8 3
E l
}
M.-&
..oc aiicwec c.i pggn,uo O
PasusATTsue.
gg,
serfampass Tsu,*
60 -
.0
- P 3f4 co= Tact Tues To woes nest.
in.
>ta.
a
.i P"8"8AT "A*T-omspecs on cup siza 1/4 - 1/2 w*
TumasTam etacT.mz's a Two 1/16,. - 1/8 m.
wetomopmoonsamou 5 F Ucward g.;
1 0" ?
swtn.
< T.
s
!=
instmuctions 8
Maximuni' thickness of any single deposited layer shall not exceed 1/4"
'df
'Ag
' ?.JN av
-QJ
iN
,k a
i.
i
~
a t
f
$.n Y
mew &WHn%TfEB%1tMtinL;;~& A:<..,ie.u ra uwJ,,.na y w, ~ ZX;g
..;u..QW
w.mr 'wwwwm ~ --
~m~-'
- *m J mwrm~mnw"?=w:=
y y
Page 1 of 2 m.
l M
g een ue.
a.
2 ab musteN. ruxas ws CP 1212AA401 0
st W8W WPSNo.
(
~
{
PROCEDURE QUALIFICATION RECORD
' -- ~
CP 1212AA401 0
WELDING PROCESS IES) 1.
reat Tunoston Arc 7ype Manual i
2.
N/A Typs N/A i
BASE METAt.S (Gwa03)
JOINTS (CW-402) 276 To SA A 194 Mad. Soec. SA-g,,,,,
Tyos or Grede 316 8M N/A j
Angi :
P No. R Gr. No.
I To P No.
N/A GrNo.
N/A Lano:
N/A l'
~
a Coupon CD N/A Thicknen 3/4 stua in, g,,,
1 O. D. Range Quaafted unlimited coening: N/A l
J Deposited Weld Metal Thk.1.
1/R 2.
IN. B. S.
N Total Thk. Range Cualified unlimitad Fillets IN.
Matf.:
N/A Moint Design Usecl q.
I M
PILLER METALS (CW 404)
GAS (CWacS)
M on 2
F. N o.1.
6 2.
N/A sar,sogn, g,,
5 A No.1.
2 2,
N/A Flow Rate 20 CFH{I SFA Scoc. No l' 5.9 7
N/A purg, c,
N/A b
'AWS C! ass. No.1.
M14 2-N/A Flow Rate N/A CFM!
d Sias of Electrode 1.
1/19 9 N/A IN.
E Size of-FUler 1.
3/32 9_
N/A IN, ELECTRICAI, RACTERISTICS (CW409)
N/A Electroce.- Fluz C: ass.
N/A Current 1.
u 2.
ii Consumacie insert 1.
N/A Amos Rangel M - 100 2.
W Trade Narne N/A Volts Rangel-in
?
Tungsten Elect. Size / Type 3/32 t W 6 ri -4 se POSITION (CW 4C5)
TECHNICUE (CW-410)
Stringer oc Weeve Seed 1.
BOD d
Welding Positson 2I 2.
g}
Weiding Progression N/A 8eed Width 1.
3/8 9
N/A 33, 3
Orifice or Gas Cao Size 1.
3/8" 2_
N/A is,.
PREHEAT (CW-406)
Oscillation 1.
N/A 2.
IN.
g[)'
Prenest Temo.
60 oF Multi or Single Layer 1.
mult1 die Interoass Temo.
350
N/A IJ PCSTWELO NEAT TREATMENT (QW-407)
Muitiede or Single Electrodes sinale N/A Trevei Sosed Range 1.
2.5 2,
N/A Tyos gpy d
Temoorsture - N/A sp p,,nin,
M/A ch Time Range N/A gackcougmg metnod N/A TENSIL2 TEST 1
Seessmen l
04memeens (IN j Ulenes remi Ultances Unis Cheresier of Solure I
^'** { lN.2]
Lees La.
Str*88 eel Ana Lasetton l
.,j se. 6 s 4. n o.
. i w.en i rn
.h N/A l
N/A I
o N/A l
GulOEO SENO T1573 d
Secomen l
Seesenen l
D No. i sw. s e, iTaei so. I sw. s 6roei ce s'
l N/A l
1 N/A i
N/A l
l a
Wecer's Name Harold Porter s,s. No, 455-80-9661 Laceratory Test No.
CP 001 Test Corcucted by 3&rl Accress:
CPSE5 11/19/82 Jimy Hite e,1,
(
We certify tnat tna statements in this recere are correct and tnat tne test weics were recarea. neiceo acc testec :n accorcance mth the recuirements of Sect:en IX of tne ASME Coce.
Signed BROWN & 2CCT. tNC.
(Manutseturer!
j
& Nl O s:,
ll*! A 10 gy i m.u o
o u.
c MRtW7MMGhx.eix2uy.se+n.xc? ids %w mw,6 ix>menuw.:.6casTwan,.ru c.w a.:a ".s.T.G.% :M.W l
~.w.n.5yrmgcm ~~*=:72%=n = ::hvv!;i.i:: ~;ind.?1Lir...J.LT K 2 C L5 5 ll W 7::
a M
MoustoN TEXAS 1212AA401
(
SUPPLEMENTAL TESTS g
2 2
TOUGHNESS TEST TYPE N/A PER N/A
~
SIZE __ N/A PER N/A
. u..
MACR 0 TEST -
A total of four (4) test speciments were prepared in accordance t
with ASME Section IX, QW 462.4 (d) and examined in accordance with the requirements of QW-183 for Macro Examination.
All specimens showed complete fusion and revealed no unacceptable 3,
indications.
-t
?
p 3
4 3
O
~
x
.J 1
.t.
en
.y
.I
~. !
We certify that the statements in this record are correct and that the tests were conducted in secortf ance *ith PQR No. ' CP 1212AA401 and the requirements of ASME section IX 1
Signed 8?rawn & Ocot o.te 11/19/92 By
-. dr t >d
/
N44N i'MyE * '#Mf. % % % W,.*
, (-jp _.j ;pp fg f=< pnPgg'g
,,3 y pe
. g,, 6 p.,
yw e s
9
.. ~
M M
.,5.
j pg i
~
Brownf.rRoct.!rc
.s INTEROFFICE MEMO IM# 24566 November 19, 1982 _
TO:
G.R. Purdy
.I FROM:
W.E. Baker
$WM /
i
SUBJECT:
Approval of Welding Procedures 56
- j Attached are copies of Welding Procedure Specifications listed below for your review and approval.
(IPS-12n?n Oo'L n]
WPb-oe026, Rev. 2 These Welding Procedure Specifications are to be used in conjunction with the following Brown & Root Specifications:
3}
CP-CPM 6.9 WES-031 C
0 Please review / approve subject procedures at your earliest convenience.
's
't.
~
(l G~d50 f
ggg v c\\k c **k p 'b yd Y
\\
AWkb/
W.E. Baker
~
/
Sr. Project Welding Engineer
(
APPROVED:
J2,< Ge& &9 9*.w
]../
tin 9-s u J
lt ' Project JA Manager
(
Date f
.n WEB /JEN/ tin s
cc:
Fi1e b
+
l k
~. x n.c. a. a ~
- , u :y:
n._c e a c a n ::r:r m m nz+ w -
zm-2n, n.
n.: v-=;
.,. =,
~
Y i
Brown &Rootlnc. east office ecx,co,, aren sese, Texas 7co4a
~
f f.E November 19,'198.2_.
BRF# 11121 Mr. J.T. Merritt, Jr.
Texas Utilities Services, Inc.
P.O. Box 1002 Glen Rose, Texas 76043
~
I Texas Utilities Services, Inc.
Conanche Peak Steam Electric Station Approval of Welding Procedure Specification
- e..
Dear Mr. Merritt:
1 Z
Attached are copies of Welding Procedure Specifications for review and g
approval by Gibbs & Hill, Inc.
3 WPS-12020, Rev. 0 WPS-88026, Rev. 2
.9 These Welding Procedure Specifications are to be used in conjunction with
'i O
the roiio ias Bro a a aoot saecificatioas:
CP-CPM 6.9 A
Il WES-031 5
Please review / approve subject procedures at your earliest convenience.
Y Very truly yours, BROWN & ROOT,tijC
/
{.'G. Sd+
l O.C. Frankum Project Manager 7
APPROVED:
M CCF/WE3/JE tin Attachment cc:
See CPPA-25,046 J.T. Perritt J.T. Merritt. Jr.
Cate A"
Engr. & Const. Mgr.
M I
.,._g m d V'E r tt w rrr. m :gr: m
. x.eAl e m.,.m 3 3,3.,,g.,
r_.
..;. ' q; p a_uu, rxcurr ::n_= '
~z=" " : M L = n_, L ew <.-. _. =
s, s
O
.h CPPA-25,046
,lovember 19, 1982
{
1 Texas Utilities Services Inc.
P.O. Box 1002 J
Geln Rose, Texas 76043
-v-Attention: Mr. J.T. Merritt, Jr.
9
Subject:
B&R Welding Procedure Specifications
Reference:
8KF-11121 1
Dear Mr. Merritt:
.A The following welding procedure specifications are " Approved for arrangement,
t only, proceed with fabrication subject to ecmpliance with all contract
- }
requirements, drawings, and specifications."
1 5
WPS-12020. Rev. O WPS-88026 Rev. 2
~
l'5..
e Very truly yours, 7t di GIBBS & HILL INC.
itt 11 WA$ - $.*~--
f
?.{
.a R.C. Earber
.Wnior Welding Engineer c
9 RCB/tn N'
cc:
R.E. Ballard-G&H N.Y.
-Mark Smith-TUSI W.E. Baker-B&R
- n:
ARMS
.2 7
e
'.N
~!,
.y q;
-i 9
.m t
Y
& 1 S**
Ui M I* N S C $'
I M E* Q -af74J.$ g [ Q g icg,, g g gg.;
.,j
. ;g.
-