Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
Ewa.OsmnMDMMMWIMMR' ENC'EJ:52%KmAG.sW- me'w.- w;.x m - .hMd2." T,'[
g, .. ,
-e wet.omo moctoGRa NC.
= f*T'
~
'BrownffRootelnc. _._ (EED pass 1 es 2 SUPPORT!NG PCR(S)
, WELDING CODE g 4 y CP-0812AA401 RC AWES &PV SECTION lx e i T)ON nicMFFME IIRE ;M'l' N., o . s e _ _. . . .
Gas Tunastan ae" TYPg Manua1 - ;
WELDING PROCESS (ES3 1 N/A TYPE N/A --
2.
BASE METALS (QW-403) POSTWELD MEAT TREATMENT (QW-.407) l as P No ft'. No-Type N/A P No. 8 Gr. No_
Thickness Rang, Un11mited i1) IN. Tm N/A *F Un1imited (2) IN. ' Tsne Reg, N/A pi ,,
, y p;in, _ ' ni imi tecDieun1imitea IN.
gj
- E276hp'304) 0 \ / GAS (QW-.408)
Shielding Gas 1. AP"O" 4 FILLER METAL 5 (QW 404)
N F No.1. 6 2. N/A Pement Como. 100%
8 s N/A Shielding Gas Flow Rate 15 CFH (min.)
3 A No.1.
SF A Soec. No.1. 69 2. N/A Pwyn Gas N/a Flour Rate N / A CFH (min.)
$ ED 308 2. N/A Troiling Shie4 ding Gas Componroon N/A AWS Class. Pfo.1.
Sise of Electrode 1, 3 / ' ? " - 1/ "i N/A IN" Sise of Pillet 1. N/A 2. N/A IN. ELECTRICAL CHARACTERIST)CS (CW-4001 N/A Current 1 OCSD (3I 1 N/A Electrode - Flus C: ass N/A
'; Cono4maWe insert N/A Amos Rage 1. 50-150 2-Volts Range 1. 8-14 2. N/A Tunyten Elec.Sas/ Type 1/16"-1/8" EWTh-1or2
^
3.,
h TECHNIQUE (QW -410)
POSITION (QW-.406) N/A Weiding Position AII Stringer or Woore Bead 1. B o t h 2.
E-Weiding "; ,2 3 F Ilowa ed - Seed Widm* See Page 2 lit Orifice or Gas Cup Siae I/A,-I/2, IN.
Q Initisi and Interpass clearung Weiding surfaces sheit be wire lunashec
[/ PREHEAT (CW-406)
Prehest Temp. U TW i
or yound as toouired to remoes dag, scale or other contaminants.
p Interpees . Temo. Range 60-350 *F Memed of lid gouging N/ A -
Prehest Mamt. N/A 'F u Cecilletaan 1. N / A 1 N/A IN.
I Contact Tutte to work distance N/A IN.
.CINT DESIGN JOW 4021-Fi11et Mu1ti01e
[ Groove Design N/A M/A N/A Multiple or Single Layer 1.
i N/A
.loint Type 08 - Cl BS (Per Side)
[ N/a
-, Backing yn,.. Mat.t, Tpi 4 - -,-..m,. -- ,..i Multiple or single e4ectrod,es,, ,S i "" l *y,a e.
,,,,,,,,,,,,,, 2 ,, y retainers not allowed. Peening- Na. 3 1 1 n w o ,4 REMARKS (1) Maximum thickness of any single deposited layer shall not exceed 1/2".
3 $
(2). This Procedure is qualified for non'-pressure retaining Q t N L welds only.
o (3) Pulsea current not allowed.
o W
,, PREPARATION APPyCVAL DATE n -. i ' w_ wr- ///// n P Cooss: AsME sec 4on tx N NM -4e hs.B Project Wel.Mng Enfineer
/ N-97 Pro,ect: cpsEs oag .loe No. 35-1195
$@o
, %.S " -n
____&ws.,= .n-- .n--
y.x w w.m am?n vaz-=2ns M y-_:=^i.G;;_a_m .;-
, . ~ _ _ . .n . : .
3 ,
j ,
't ' + CELDING TECHNIQUE SHEET P NO. 8 GROUP 1 TO P NO. GROUP ""0" O THK. RANGE U"Iimi**d R esos 2 or 2
,1, 1 TYPsacJowT osmans PanurTTso nooT opsnma o.s_ N/A =,
e.g N/A ,y,
(+ *A276 Tp 304 All Fillet Welds .
l
(
O \
). ,
%1 4
wetoiwo Panaustans asmots values ans miniuvu j =^x -
9 Piann usTAL ans atacTacAunaTA .TnAvst 4 ~,si "' '8'"8 Plow nATdcrus Yvrst Ampanaos volts *sEo wTi x m oos38 sirs Im> ""8 " " roban. namos namos 88
9
';! All GTAW 3/32 ER 308 Argor 15 N/A DCSP 50-150 8-14 2"-6" 3/8"
.(
or GTAW 1/8 ER 308 Argor 15 N/A DCSP 50-150 8-14 2"-6" 3/8" n
E m
~.
I h k 73 f[i ! PssNms Not allowed h pasMsAT TsMP. 60 *P esenJ SAct ocuGews usTwoo N/A h mTanPAss TsuP. 60-MO *P N / .i gu, N'A m m m To w ons cesT:' 1/4 1/2" f Pnsus AT MART.
Tumastam sLacT.aza a Typs 1/16, - 1/ 8,,
m Pcs on cup sors
- m. wsLoews pnoomassioN 3F
- Uoward
.w, 7 .
1 or 2
,,- swTn.
% fu msTnucTeons
- ) (1)- Maximum thickness of any single deposited layer shall 4" not exceed 1/2".
vi.' *(2) This Procedure is qualified for non-pressure retaining 4 fillet welds only.
- 3 (3) Pulsed current not allowed. -
1
?l
- s 4.,
i
)
4 1
t
$ ,.F j."% , > ,_
d
.t je ' k g K 4., Jap 49,6'{-
, [MMgge d h [e Mu 4 [, ', ,
r- - ~ ~ , ,,. ,, , ,
' ~~-""- - c. _ .,
,y d *j Brown & Root,Inc. east ottice sox ,00,. aien sose, Texas 7eo4a
(. ,
Why~ #
BRF #11285 November 1, 1983- -
Mr. J.T. Merritt, Jr. .. Y' -
Texas Utilities Services, Inc. '
P.O. Box 1002 67$
Glen Rose, Texas 76043 Texas Utilities Services, Inc. 50 Comanche Peak Steam Electric Station Approval of Welding Procedure Specification
Dear Mr. Merritt:
CP-81221, Rev.
I,; Attached iis a copy of Welding Procedure Specificatio for review and approval by Texas Utilities Services, Inc.
This Welding Procedure Specification is to be used in conjunction with the following Brown & Root Specifications:
. CP-CPM 6.9 WES-031 Please review / approve subject procedure at you'r earliest convenience.
g
- G Very truly yours, g, ,\E s\bs *M.w.
gsw
c q hd D.C. Frankum Project Manager h/A APPROVED:
DCF/ WEB /JEH/ tin Attachment cc:
- J.T. Merritt ARMS (0)
- [7//M H. Smith g.i. Merritt, Jr. / Date Engr. & Const. Mgr.
1 90 %-85-59 m'Dff ' g[ E ,% .}
b M Nb d g *"ya
- h p y, Oh a g as
n.nmer wr fam cmpygemwriec.c.;atc;s;z .mzuz sy;w.a.w:.:.q3:z;- ; mum .s r r . o t; BrownCrRoot.inc.
(
INTEROFFICE MEM0 .
IM - 26370 November 1, 1983 . _.
TO: G.R. Purdy FROM: W.E. Baker -
1
SUBJECT:
Approval of Welding Procedure J
1
.2 .
6 _ ,
Attached is a copy of Welding Procedure Specification WPS CP-81221, Rev. 0 1 for your review and appraval.
L 1 This Welding Procedure Specification is to be used in conjunction with the 3 following Brown & Root Specifications:
A
+ CP-CPM 6.9 t WES-031 i Please review / approve subject procedure at your earliest convenience.
.d s
-3 0 -
4v 1)
.a b
W.E.Balty b
p Sr. Pro;ect Welding Engineer
+
5
- ~
8 APPROVED:
l',l
=
WEB /J / tin N Y d.7 cc: Project QA Manager v Da te '
File g 4g._ f, , ,p3 h
t v
b 4
4" 4
a .
+ <& 'YO- EE
&Y944? te oYe4 % id il'b5%$ A 5d!' $ e