MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
. . . . ... ....
. g ;"
WEl.0 PROCEDURE SPECIFICATICN - INTERIM CHANGE NOTICE LATEST ICN No. I to WPS 11032 Rev. 11 The following Interim Change Notice is being submitted at this time in order
, to expedice the revision of a non-essential variable in a Brovu & Root, Inc.
Weld Procedure Specification.
- ICN No. 1 Changes /Mditions: 4/13/84 Date On page 2 of 2 add the following to Note 1 under f the ANSI B31.1 thickness range: ,
(d[v,f f/f//25.
.0625" thru 1.50" - Structural welds (Oces not FA[
g /.
pressure parts or attachments to pressure PQAM
((
{ & Vk6/hG y and/or P NSSS DM ICN No. Changes / Additions:
Date PWE PQAM PDM and/or P NSSS DM ICN No. Changes / Additions:
- y Date 73 PQAM PDM and/or P NSSS DM ICN No. Changes / Additions:
Date PWE PQLM PDR 4 860527 PDM and/or P NSSS DM GARDE 85-59 pg -
~
ng =-
a_ ___ .-. . __ ._ _ _ - , .
.s wan Jaen,enuctovntpeo.
MOUSTON. TEXAS EV 43N Il PAGE I OF 2 WELDING CODE M ^# I SUPPORTING POR(S)
ASME 3 & PV *0101AB138 Rev.4 SECTION lx WELDING PROCEDURE SPECIFICATION *0101AB212 Rev.3
- 0112B8101 Rev.4 011288112 Rev.0 WELDING PROCESS (ES) 1. Shieldad Metal Arc TYPE Ma '"f a l ev.0
- 2. N/A TYPE N/A l l
BASE METALS (QW-403) POSTWELD HEAT TREATMENT (QW-407)
P No.1** Gr. No.112 so P No I f:r. No.182 Type N/A l Thickness Rany .0625" thru 2.00" (1) IN. Tempereture N/A ep l
Pipe Ola. Rany Unlimited IN. ' Time Rany N/A Range for Fillet. Thk I1) Die Un1imited IN.
- A570 Grc 0 or A120 to Pl-Fillets only G AS (QW-408)
FILLER METALS (QW-404) Shielding Gas 1. N/A F No.1. 4 2. N/A Percent Comp. N/A i A No.1. I 2. N/A Shielding Gas FI Rate N/A 5.1 CFH (min.)
SF A Spec. No.1 2, N/A purg, o,, N/ pi, ,g ,g, N/A CFM (min.)
AWS Class. No.1. E7018 2. N/A Trailing Shielding Gas Composition N/A Siae of Electrode 1. 3/32 - 5/32 2. N/ A INl Size of Filler 1. N/A g N/A IN. ELECTRICAL CHARACTERISTICS (QW409)
Electrode - Flux Class N/A Current 1. DCRP 2 N/A Coneamable insert N/A Amos Range 1. 70 - 195 N/A 2
Voits Rany 1.18 - 27 2 N/A Tungsten Elec. Size / Type N/A POSITION (QW-405) TECHNIQUE (QW-410) y Weiding Position All Stringer or Weeve 8ead 1. Strincer 2. N/A Welding Progression Unward Beed Width: See Page 2 Orifies or Gas Cup size N/A IN.
PREHEAT (QW406) initial and Interpass cisaning: Weiding surfaces shall be wire brushed Prehest Temp. 60 (2) ,P tuin.)
' = ground as wired to rerne 4 e or eer ==im Intemess . Temp. Many 60 - 500 (2)(3)(8)F Method of back gouging Air carbon are and/or Prehest Maint. N/A 'F orinder Osclilation 1. N/A g N/A IN JOINT DESIGN (CW-402) Contact Tube to work distance N/A IN' Groove Design Sinale V or U. F1are Bevel Multiple or Single Layer 1. Multiole JointType 08 Ye5 Cl N/A BS Yes (Per Side) 2. N/A Backing Metl Typ Similar to base material Multiple or single electrodes 3inaj e g
Travel Soegd (Range) 1. 2.6 - 7.2 2 N/A gpy Peening- Not A11cwed REMARKS
- This PQR includes Supplemental Test Results FOR Bffa. %}D PR ARATION A OVAL DATE r m HRg; E 00
%,.w &> a 27 93 F ec. Codes: ASME Section III. ANSE B31.1
/ 9-M-c4 Preset: CPSES Efoi e iReidihg d Engineer d . .V m A-
')l2'))$ ,) ,;,s no. CR-0172 OuM Assurance
~
-. . .y.. . __
- :-- WELDING TECHNIQUE SHEET
~~~ ~ ~
Tifeim a-u et so.
^~
P NO.M GROUP IU TO P NO. 1 GROUP IA2 - a msaou 1 THK. RANGE .0625" thru 2.00" (1) m- Pact 2 or ? -
YPcAL.cawT cEsacus PEnwrrrto 3.
/---//, xA s i noor e guma os 1/16-3/16 m
- p. , k C8 I!.8-1/4 m 6
~
~~-
wan - J 0-3,/16" t
4 /& N2hD'# 88tLt?wfLS Typical VELDING P ARAMrTERS +38NGLE VALUES ARE utNtuvw PILLER METAL GAS E LEcTRICAL DATA "^**
TMAVEL WELDWG m S,,t:E *-= eu= FLOW RATdcFMI AMPERAGE VOLTS SPEED g
,,,,m ,,,,, , ou TYPE./
, P ocm ~a tv E -
.A,,o E .A,.o E ,,,,
11 SMA or 3/32 E7018 N/A N/A N/A DCRP 70-120 18-27 2.6-7.2 3/8 V
SMA or SMA or 1/8 5/32 E7018 E7018 N/A N/A N/A N/A N/A N/A DCRP DCRP 90-160 110-195 18-27 2.6-7.2 18-27 2.6-7.2 1/2 5/8
)
Maximum thickness of any single depc sited layer shall not exceed 1/2".
PEENING NOt AllOWod 9tEHE AT TEMf. 60 (2)' ., %
aAcx GovGmG uETwoo Air carbon are: crindino NTERPAESTEMP.60-500 (2) (3) (8) .,
cowTAct TusE To wcmc oig7, N/A ,,
mEHEATWMNT. N/A ORIFICE om Cup 31ZE N/A g TUNGSTEN ELECT.83ZE & TYPE N/A ,- Ucward wtLo m G raoCatssieu g wy ,. . N/A wrnucTious
- 1. Qualified thickness range:
ASME III .0625" thru 1.50" - Full penetration buttwelds.
.0625" thru 2.00" - Partial penetration with depth of preparation 3/4" or less All thickness - Fillet welds with maximum throat of 3/4".
ANSI B31.1.0625" thru .750" - Full cenetration buttwelds.
.0625" thru 2.00" - Partial penetration attachments with depth of orecaration
, 1/2" or less.
All thickness - Fillet welds with throat thickness 1/2" or less.
- 2. Preheat Temocratures:
200 F min. - P1 material over 1.250 thickness.
150*F min. - A588 material.
250*F min. - 588 material over 1 1/2" thickness.
175"F min. - For B31.1 when attaching non-pressure parts to pressure parts over 3/4" in thickness.
- 3. Preheat and interpass temperature (above 150*F) shall be checked using temperature indicating crayons or an approved equal. ,
- 4. Tack welds shall employ the parameters for the root pass. 1
- 5. Tack welds shall be complete fusion; the starts and stops shall be tapered by grinding so that the initial pass can properly consume the tack. ]
- 5. F_ull penetration welds not utilizino a backing strio shall be back couced and/or orcund l to sound metal before weldino the second side usino the weldino carmtars shown._
- 7. Variation in joint geometrics shcun above is permitted provided the specified root opening is maintained.
- 3. Maximum interpass temperature for concrete embeded base plates shall be 250 F when under 3/4" thickness and 350 F for thickness 3/4" and over.
's. A588 Gr. A or B or A570 Gr. O or A120 to P1 also qualified. A570 Gr. D and A120 to be welded using only fillet welds.
...,,s.~,...
Brown & Root,Inc. Post office sox 1001, cien nose, Texas 7eo4a
,,o , w n
,/
September 27, 1983 BRF #11281 acu4l Mr. J.T. Merritt, Jr.
Texas Utilities Services, Inc. ~]
p P.O. Box 1002 Glen Rose Texas 76043 Texas Utilities Services, Inc.
Comanche Peak Steam Electric Station Approval of Welding Procedure Specification
Dear Mr. Merritt:
> E $I Attached is a copy of Welding Procedure Specification WPS 11032, Rev.11 for review and approval by Texas Utilities Services, Inc.
This Welding Procedure Specification is to be used in conjunction with the folicwing Brown & Root Specifications:
CP-CPM 6.9 WES-031 Please review / approve subject procedure at your earliest convenience.
(
i'* ^ Very truly yours, BROWN & ROOT, INC.
.&.; h)&p%d
/7D.C.Frankum Project Manager DCF/ WEB /Jh/ tin APPROVED:
Attachment CC:
J.T. Merritt ARMS (0)
M. Smith
& IT#$=uirrje .
J T. Merritt, Jr. Date ngr, & Const. Mgr.
r Al A A g #" A TU!ftOV-DO
$//D.
E EirownCrRoot.inc.
(
INTEROFFICE MEMO IM - 26235 September 27, 1983 TO: G.R. Purdy FROM: W.E. Baker
SUBJECT:
Approval of Welding Procedure
- ". . Attached is a copy of Welding Procedure. Specification WPS 11032 Rev.11 for your review and approval.
' This Welding Procedure Specification is to be used in conjunction with the following Brown & Root Specifications:
CP-CPM 6.9 WES-031
( Please review / approve subject procedure at your earliest convenience..
w h/ N J W.E. Baker c.
Sr. Project Welding Engineer APPROVED:
WEB /Jk/ tin N- d 9fE cc: Project QA Manager' Date File
,.g.. %_ , , , , . . , ,
'W h = w e * * * % * - oso en - _, ,.e - . , ee ..
, 4* *e g e nw w . & %
HOUSTON. TEXAS -
11032 Page 1 of 2 WELDING PROCEDURE SPECIFICATION CHANGE NOTICE CURRENT REVislONS ARE INDICATED BY CHANGE BARS.
REV. DATE ORIGINATOR A OV ' f 1 6- 8-77 E. J. Hocko f_ vJc.n_
2 8-26-77 E. J. Hotko P M L I/i%
. 3 9-27-78 J. F. Bronicki // Ph2di.4., R 4 12-12-78 J. F. Bronicki F / //n l L u t 5 3-30-79 J. F. Bronicki fd # d2t//.t._im 6 8-22-79 J. F. Bronicki M #//o ll_AC
. 7 3-20-80 /4/c. W i.vrhhe f V dx.Lt 44 4.O 8 2-2342 W.E. Baker ///A/ ~>C ls 9 5-19-82 W.E. Baker //f/*4M'd-Af-10 2-23-83 Jimmy Hite WW /4Ah/
REVISION NO. DESCRIBE THE CHANGE 1 Added PQR 0101BB113 REV.2 to increase minimum thickness range qualified. Added additional joint details, a
2 Deleted PQR 0101EB113 and revised mini =um thickness qualified.
3 Deleted PQR 0101AB119 and added PQRs 0101AB137, 0101AB138 and 0101AB140 to allow impact velding on Group 2 materials.
- . Revised preheat requirements. Increased voltage range.
Added joint details.
4 Deleted reference to travel speed and double bevel joint detail. Revised voltage range.
5 Retyped on new form. Added the following information:
fillet veld thickness and diameter, electrode - flux classification, preheat maintenance, joint description, trailing shielding gas, tungsten size and type, bead type, initial and interpass cleaning, back gouging method, oscillation and root spacing. Noted PQR revision and deleted PQRs 0101AB137 and 0101AB140 and added PQR 0101AB212, Rev. 1. Revised amperage and voltage ranges.
6 Noted PQR revisions. Added preheat maintenance, peening, root spacing, notes 7, 8 and9 ~ and layer thickness limitation.
Added joint details. Revised fillet range thicknesses.
7 This document has --: reviewed for typographical a=d technical errors c.. ce rected where necessary. Se document meets all requirements of the code of record at the date of qualification. Revisions of technical nature listed below are highlighted by change bar(s).
REVislONS MUST BE APPROVED BY THE MANAGER OF MATERIALS ENGINEERING OR HIS DESIGNEE m,- - --- -m-. - . _ _ . ,. , ,7
WPS/PQR NO HOUSTON, TEXAS 11032 Page 2 of 2 WPS/POR REVISION NO. DESCRIBE THE CHANGE
- 8. Add travel speed. Add partial penetration Flare bevel configuration. Delete preheat maintainence requirement.
Reduced thickness qualified for ASE Section III. Add embeded plate interpass restrictions.
- 9. Add PQR Oll2BB101 to allow use of additional base metals.
- 10. Added PQR 011288112 to allow use of ASTM A570 Gr. O material.
Lowered thickness range. Incorporated ICN's. Revised notes to clarify thickness range and preheat temperature. Add note 9.
- 11. '
Added PQR CP-0112BB301 Rev.0 to allow use of ASTM A120 material.
Added notation that A570 Gr. D. and A12C to be welded using only fillet welds. -
t i
l I
l
- REVislONS MUST BE APPROVED BY THE MANAGER OF MATERIALS ENGINEERING OR His DESIGNEE