MONTHYEARML20211Q4981999-09-10010 September 1999 Proposed Tech Specs Clarifying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits & Adding Ref to Caldon TR for LEFM ML20211G3221999-08-26026 August 1999 Proposed Tech Specs 4.0.6 Re SG Surveillance Requirements ML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20210R7091999-08-13013 August 1999 Revised Proposed Tech Specs for LAR 98-010,proposing Rev to TS Table 3.3.1-1, Rt Sys Instrumentation & TS Table B 3.3.1-1, Rt Sys Setpoints ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20209E1861999-07-0909 July 1999 Proposed Tech Specs,Adding Reactor Core Safety Limit Figures to Section 5.6.5 of Ts,Clarifying That Overpower N-16 Setpoint Remains in TS & Reflecting NRC Approval of TRs Used to Determine Core Operating Limits Presented in COLR ML20212J4251999-06-23023 June 1999 Proposed Tech Specs,Revising EDG Start Be Emergency Start Instead of Normal Start Following Loss of Offsite Power ML20195E5401999-06-0404 June 1999 Proposed Tech Specs Pages 3.2-6,3.4-24,3.4-25,3.7-23,3.7-30, 3.8-25,3.9-9,3.9-10 & 4.0-2,provided as Addl Aditorial Changes Supplementing LAR 99-001 ML20195B6461999-05-27027 May 1999 Marked-up TS Pages Re LAR 99-004,changing Plant Battery Surveillance ML20195B6771999-05-24024 May 1999 Proposed Tech Specs Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner ML20206G7111999-05-0404 May 1999 Proposed Tech Specs Revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20207F3511999-02-25025 February 1999 Fire Endurance Test to Qualify Protective Envelope for Class IE Electrical Circuits ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20198J3171998-12-21021 December 1998 Proposed Tech Specs,Proposing Changes Administratively for Unit 1 & Increasing Licensed Power for Operation of Unit 2 to 3445 Mwt ML20198J2541998-12-18018 December 1998 Proposed Tech Specs Sections 1.0,3.1,3.3,3.4,3.6,3.7,3.9 & 5.0,converting to ITS ML20198J5211998-12-17017 December 1998 Corrected Tech Specs Pages for Section 3.8 to 971211 Submittal Re TS Conversion Application ML20197K0491998-12-11011 December 1998 Proposed Tech Specs Section 3.8, Electrical Power Systems, Converting to ITS ML20196C5361998-11-20020 November 1998 Proposed TS Converting to ITS Sections 4.0,3.4 & 3.6 ML20195F1751998-11-13013 November 1998 Proposed Tech Specs,Revising Administrative Controls Section to Include Configuration Risk Mgt Program Into CPSES TS ML20195F5291998-11-11011 November 1998 Proposed Tech Specs Revising Core Safety Limit Curves & Overtemperature N-16 Reactor Trip Setpoints for Unit 2 Cycle 5 ML20196B8811998-10-30030 October 1998 Proposed Tech Specs Section 3.3 Re Instrumentation ML20154R7861998-10-21021 October 1998 Proposed Tech Specs Section 3.7, Plant Systems ML20154S2901998-10-14014 October 1998 Proposed Tech Specs Sections 3.1,3.2,3.4,3.5 & 5.0 Re Reactivity Control Sys,Power Distribution Sys,Rcs,Eccs & Administrative Control,Respectively ML20154C9101998-10-0202 October 1998 Proposed Tech Specs 4.0.6, SG SR, Adding Definitions Required for F* Alternate Plugging Criterion & Identifies Portion of Tube Subject to Criteria ML20153E2661998-09-24024 September 1998 Proposed Improved Tech Specs Sections 3.4, RCS & 5.0, Administrative Controls ML20237E8461998-08-28028 August 1998 Proposed Tech Specs Pages Re Sections 1.0,2.0 & 3.0 of Proposed TS Changes in 980707 & s,In Response to NRC RAI ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20236J3131998-07-0101 July 1998 Revised Proposed Tech Specs Pages Re Safety Injection Signal & Blackout Signal ML20249C6101998-06-22022 June 1998 Proposed Tech Specs Section 3.6 Re Conversion Application ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20216E6291998-04-0909 April 1998 Marked-up TS Pages,Reflecting Proposed Changes in Amends to Licenses NPF-87 & NPF-89 ML20216B1471998-04-0606 April 1998 Proposed Tech Specs,Allowing Plant to Continue to Operate W/O Having to Perform Portions of SRs ML20217A3901998-03-18018 March 1998 Proposed Tech Specs Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power Re Enforcement Discretion ML20216H1361998-03-13013 March 1998 Proposed Tech Specs Re Electrical Systems Surveillance Requirements ML20248L3191998-03-12012 March 1998 Proposed Tech Specs TS 4.8.1.1.2f.4)b) & TS 4.8.1.1.2f.6)b) Re Request for Enforcement Discretion ML20216D6021998-03-0909 March 1998 Proposed Tech Specs Temporarily Removing Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of SRs 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a),for Unit 2 Only ML20203K8621998-02-27027 February 1998 Proposed Tech Specs,Increasing RWST low-low Level Setpoint ML20203J5211998-02-25025 February 1998 Proposed Tech Specs Page to Remove Requirement to Demonstrate Load Shedding Feature of MCC XEB4-3 as Part of Surveillance Requirements 4.8.1.1.2f.4(a) & 4.8.1.1.2f.7(a) Until Plant Startup Subsequent to Next Refueling Outage ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20202B1641998-02-0505 February 1998 Proposed Tech Specs Bases 3/4.7.1.5 Re Main Steam Line Isolation Valves ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212C3881997-10-24024 October 1997 Proposed Tech Specs Re Revised Core Safety Limit Curves & Revised Overtemperature N-16 Reactor Trip Setpoints 1999-09-10
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20212H0771999-08-20020 August 1999 Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820. Page 119 in Unit 1 ASME Section XI of Incoming Submittal Not Included ML20212G0821999-08-20020 August 1999 Rev 4 to Augmented Inservice Insp Plan for Cpses,Unit 1 ML20211M0041999-08-0505 August 1999 Rev 31 to Technical Requirements Manual ML20211G7401999-07-27027 July 1999 Revs 29 & 30 to Technical Requirements Manual (TRM) for Cpses,Units 1 & 2 ML20206Q0311999-04-16016 April 1999 Rev 28 to CPSES Technical Requirements Manual ML20205Q1681999-04-14014 April 1999 Rev 27 to CPSES Technical Requirements Manual ML20203B0011999-01-25025 January 1999 Rev 10 to Security Training & Qualification Plan ML20211C1071999-01-15015 January 1999 Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval ML20154C4511998-07-20020 July 1998 Interim Change Request ISI-1R5-01, Unit 1 ISI Plan,Rev 5 ML20236T9931998-07-20020 July 1998 1RF06 ISI Summary Rept First Interval,Third Period,First Outage for CPSES Unit 1, Commerical Operating Date 900830 ML20216B2811998-04-24024 April 1998 Rev 13 to Cpses,Units 1 & 2,IST Plan for Pumps & Valves First Interval ML20203J6151998-02-24024 February 1998 Rev 26 to Technical Requirements Manual ML20217P1531998-02-12012 February 1998 Rev 2 to ISI-2R2-01, Unit 2 ISI Plan ML20217P2961998-01-30030 January 1998 Rev 5 to Unit 1 ISI Program Plan ML20202E5981997-11-25025 November 1997 Rev 12 to CPSES Units 1 & 2 IST Testing Plan for Pumps & Valves,First Interval ML20212E9811997-10-0606 October 1997 Rev 11 to CPSES Units 1 & 2 IST Plan for Pumps & Valves First Interval ML20210S3911997-09-0303 September 1997 Rev 10 to CPSES Units 1 & 2 Inservice Testing Plan for Pumps & Valves in First Interval ML20151L1391997-07-31031 July 1997 5 to Technical Requirements Manual, for Plant ML20141E6201997-06-26026 June 1997 Rev 24 of CPSES Units 1 & 2 Technical Requirements Manual ML20141F8471997-06-26026 June 1997 Rev 9 to IST Plan for Pumps & Valves First Interval ML20136G4361997-03-13013 March 1997 Rev 23 to CPSES Units 1 & 2 Technical Requirements Manual ML20135A8241997-02-24024 February 1997 Rev 22 to CPSES Units 1 & 2 Technical Requirements Manual ML20134C6831997-01-31031 January 1997 Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20134M4371996-11-13013 November 1996 Self Assessment Guide Program Guidelines ML20129A5991996-10-16016 October 1996 Rev 7 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20128G7661996-10-0202 October 1996 CPSES Unit 1 & 2 Inservice Testing Plan for Pumps & Valves First Interval ML20138B5181996-10-0101 October 1996 Rev 14 to ODCM for TU Electric CPSES Units 1 & 2 ML20117C8461996-07-19019 July 1996 Glen Rose,Tx ASME Section XI ISI Program Plan,Unit 1 - 1st Interval Rev 4 ML20217M1691996-05-24024 May 1996 Rev 3 to STA-750, Check Valve Reliability Program ML20117C6181996-05-0303 May 1996 Rev 1 to Unit 2 ISI Plan ML20117C6141996-04-14014 April 1996 Rev 1 to Unit 2 ISI Plan ML20107J0941996-04-0202 April 1996 Rev 1 to Interim Change Request ISI-2, CPSES Unit 2 ASME Section XI ISI Program Plan ML20107E4471996-02-0909 February 1996 Rev 1 of CPSES ASME XI ISI Program Plan Unit 2 ML20100B9471996-01-24024 January 1996 Rev 21 of CPSES Units 1 & 2 Technical Requirements Manual ML20086C5491995-06-30030 June 1995 Rev 20 to Technical Requirements Manual ML20091L1941995-03-29029 March 1995 Interim Change Request ISI-IR3-003, Unit 1 ISI Plan ML20081F1131995-03-12012 March 1995 Interim Change Request ISI-1R3-02 to Rev 3 to Unit 1 ISI Plan ML20080Q3351995-02-24024 February 1995 Rev 17 to CPSES Technical Requirements Manual ML20078R6371995-02-15015 February 1995 Rev 5 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20078H8501994-11-30030 November 1994 CPSES Odmc Rev Change Sheet ML20073L6591994-10-0606 October 1994 Rev 4 to CPSES Unit 1 & 2 IST Plan for Pumps & Valves First Interval ML20072C7081994-07-24024 July 1994 Rev 16 to Simulator Operations/Maint Instruction - 010, Simulator Certification Testing ML20069E5171994-05-17017 May 1994 Interim Change Request ISI-2RO-001, Comanche Peak Ses Unit 2 ISI Program Plan ML20029D0711994-05-11011 May 1994 Rev 16 to Technical Requirements Manual. ML20065K1721994-04-15015 April 1994 Rev 15 to CPSES Units 1 & 2 Technical Requirements Manual ML20058E3841993-11-30030 November 1993 Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4 ML20058C4441993-11-23023 November 1993 IST Plan for Pumps & Valves First Interval, Rev 3 ML20058B5791993-11-19019 November 1993 Rev 14 to Comanche Peak Steam Electric Station Technical Requirements Manual ML20058J9711993-11-19019 November 1993 Interim Change Request ISI-1R2-005 to Rev 2 to Unit 1 ISI Plan ML20056D8161993-08-11011 August 1993 Salp,Directive 8.6 1999-08-05
[Table view] |
Text
.
' WELD PROCEDURE SPECIFICATION - INTERIM CHANGE NOTICE LATEST ICN flo. 3 to WPS 12010 Rev. 1 The following Interim Change Notice is.being submitted at this time in order to expedite Weld the revision Procedure of a non-essential variable in a Brown & Root, Inc.
Specification.
ICN No. 1 Changes / Additions: 1/12/82 Date !
-- On page 1 of 2 under Preheat (QW 406) add the following note: Preheat may be reduced to 60 F for jg gg P'E tacking only. ,,!,4 hog /fgh'Ya"h
'PQAM ()
W6% Nff2 ;
j' PDM and/,or P NSSS EM ICN No. 2 Changes / Additions:
11/8/82 Date
$1l DEA
'" U Delete ICN No. 1 G.12.Pa Y118 {&lh
~PQAM (l(j ~(
bb N/fd2 PDM and/or P NSSS DM ICN No. 3 Changes / Additions: ~
8-25-83 Date On pages 1 & 2 under base metal thickness range, add reference to note 9.
P'E O A On page 1 of 2 in the Remarks block, delete the re-ference to ASME Code Case N-71-9 and 1644. g, - M/
On pace 2 of 2, add the following note: 9. For base materials that do not require Charpy Impact Test the - ~8 D the thickness rance shall be 3/16" - 4.0". P M and/ r P NSSS DM ICN No. Changes / Additions:
Date PWE PQAM B606040252 860527
[. WELDING TECHNIQUE SHEET CEGIM MOCEDunE NC P NO. N/A*Gnoup N/A TO P NO. *N/A gnopp N/A 1 THK. RANGE 5/8-4.0 IN. pAGE 2 os 2 TvPiCAL joint otssGNs PERurTTED 83ase Type A388 Gr. A nooT OPENING o.a 1/16-3/16 m.
sJ.3/8-ll' m.
VA k M LA\\\\%%\W43 E ////I M bhM%\\WAWN '
WELol=G PARAMETERS
- SINGLE VALUES ARE MINIMUM PILLER METAL GAS E LECTRICAL DATA #**
TRAVEL
.',, LA m PROCESS O
. SIZE ONJ AW5CLASE TYPE Plow RATdc7Ha SMIE PuMGE TYPU POLAR.
AMPERAGE RANGE VOLTS RANGE SPEED WI WfoT nu,)
All SMA 3/32 E7018 N/A N/A N/A DCRP 85-110 18-25 g/A 3/g All SMA 1/8 E7018 N/A N/A N/A DCRP 90-160 18-25 N/A 1/2 All SMA 5/32 E7018 N/A N/A N/A DCRP 110-195' 18-25 N/A 5/8 MAXIMUM THIC) NESS FOR ANY SINGLE PASS SHAIL NOI EXCEID 1/2".
p PEENING Not Allowed PREHE AT TEMP. (8) *F Wj Grinding, Chipping MTEM ASE TEMP. W 4 SACK GOUGING METHOD N/A N CONTACT TuSE To WCRE DisT. m PREHE AT M AmT.
N/A oRipect OR Cup size N/A u --- TuMGsTEN ELECT.sizt a TYPE m. WEto:NG progression 3G: Upvard
,y' Ewin .
insTRucTess
- 1. Interpass temperatures above 1500T shall be checked using temperature indicating crayons.
- 2. Tack welds shall employ the parameters for the root pass.
- 3. Tack weld shall be complete fusion. The starts and stops shall be tapered by grinding so that the initial pass consumes the tack.
4 All velds shall utilize stringer beads.
- 5. Preheat maintenance shall be maintained during velding only. The co=pleted weld shall be cooled in still air.
- 6. Variations in the joint geometry shown above is permitted provided the joint is single or double velded and the root spacing is maintained within the specified tolerances.
- 7. Maximum thickness of any single deposit shall not exceed 1/2".
- 8. A preheat cf 150 F is required for material thicknesses up to and including 1 1/2" and a preheat of 250 Fisrequiredasaminimumforthicknessesover11/2".
The interpass temperature range shall be 150 -500 for thicknesses up to and including 1 1/2" andshall be 250 -500 F for thicknesses over 1 1/2".
J
- g. e p
- wt .,,3r-. . , , - - - .-e . - - - - - - - - - - - -- ,- e *-
r ,
. . u. . 1 'p.,
a f 9 ,:.--
i s CPPA-9234 TEXAS UTILITIES SERVICES INC. i'
,, go O F FIC E. M E M O R A N D U M T. D. C. Frankum 'Cim Rose, Texas March 27. 1981 ,
subject ' COMANCHE PEAR STFAM FIFCTRIC STATION
. .a Approval of Valding Procedure Specifications ..
i
~
.. Ref: 1)BRF-10500
- 2) BRF-10502 , , ,
. , s The following Welding Procedure specifications, tr'ansmittedlby the referericed ';
letters. are hereby. " Approved for arrangement only ', proceed with fabrication, ,/
subject to compliance with all contract requirements. drawings and specifica-
^
ti ons'.' . <
WPS-12010; 'Rev;31 -
+
WPS-15011, Rev. O i
These were' approved by R. C. Barb,er of Gibbs & Hill. See attached Gibbs &
Hill letter dated 3/27/81.
- .1 ..
s M. R. McBay 3
Engineering Mana[ger Y -
MRM/DHW/MWS/
i .---cc - ARMS $ pm .
/ g y .# j J. T. Merritt
- W. E. Baler c /08 4A
- 9 ,'3 q
8, b
b I
1 s
FO!A-85-59
&ow
1
'. .,:, .~
' . 'w.-.
g 2. '- iv
.. L..
1 '}<. -
Gibbs 8 Hill,Inc. '
. e,.c.I,u .., oe,,e.... .m~ .. , m
, .. u m . .,...........
March 27, 1981 Te <as Utilities Services, Inc.
P.O. Rox 1002 G1 en Rose,, Texas 76043 .,
At tention: Mr. J . T. Merritt Deir Mr. Merritti , , .-
Sc3 ject: Brown & Root Welding Procedute -
Specifications WPS-12010, Rev. I and WPS-15'11, 0 Rev. 0
Reference:
(1) BRF-10500 (2) BRF-10502 b T.6a subject welding procedure specifications meet the rehuirements of the applicable codes anq specifications and are approved for use at CPSES.
Very truly yours, GIBBS & HILL , INC.
'~$$' -? d. c. .-
R. C. Barberi Quality Contirol Supervisor
- 4. I
(_R.G j pa b '
cc: W. E. Baker B& R Welding Engr.
CPSES s
I i
i' I
I
.s.,; ,....... !
o .u. 3 no. ; ...e
~ . . - ~ . -
Brown & Root. Inc. MlYl8 W Materials Engineering - Document Transmmal hcn INDEXED' Mechanical Engineering Department DArg, To: D.C. FRANKUM (% tion SITE 3 p.,,. 8-20-7/
From: Weiding Engmoeting Memo No.:
Project. CPSES Job No.: CR-01'72 Enclosed is/are I copy / copies of the following:
() Vendor Procedures with Review Comments
() Materials Engineering Specification
() Materials Engineering Construction Procedure
() Welding Construction Procedures (X ) Welding Procedure Specification .
() Welding Engmeering Report (X ) Other SUDPORTING POR Remarks:
Attached WPS's being transmitted for Gibbs & Hill review and approval.
Upon receipt of Gibbs & Hill approval, please forward to DCC for issuance
- s Document No Title Status tZ.oto if' d I '093 g to.s a 13 5 few.O pe( 1,5,7,8 cc: Projeet File N A Doc. Trans. File M(ding Enginee,rjng Extension: 8370 Location SW/Y '
W. Baker W/0 Status Designations
- 1. W. E. Approved 8. Aporoved for Use With
- 2. W. E. Approved With Comments CMP 6.9 (No Need to Resubmit) 9. Approved for
- 3. Revise & Resubmit Protect 4 Review / Comment By (OATE) 10. Make Required Copies and
- 5. For Project Approval Return Original
- 6. For O. A. Approval
- 7. For Chent Approval
e e MousTom.Ttx As _
gv o 1 PACf 1 OF 7 WELDING CODF
- ] SUPPORTING PQR(St ASME B & PV 1212BB133 Rev.0 SECTION lx WELDING PROCEDURE SPECIFICATIO A .%
WELDING PROCESS (ES) 1. SMAk' TYPE Manum 1
- 2. N/A TYPE N/A
~
BASE METALS (QW-403) POSTWELD HEAT TREATMihT (Q '
P No.M Gr. No. 51.A_to P No..*.5/.AGr. No. N/A Type N/A i Thickness Reny 5/8-4.0 IN. Temperature N/A ,
Pipe Die. Rony Unifmfred IN. Time Rey N/A Range for Fillet. Thk, Unli-f?etia Un14*rieed IN.
- A588 Cr. A G AS (OW-4081 ,
FILLER METALS (OW-404) Shielding Gas 1 M/A f_
F No.1. ' N/A N/A
- 2. _ percent Comp. 'f
. A No.1. 1 2. N/A Shielding Gas Flow Rate N/A CFH (min.)
'it jk SFA Spec. No.1, 5.1 E7018
- 2. N/A N/A Pury Gas N/A Flow Rate.5/.A.CFH (min.)
$. AWS Ctess. No.1. 2. , Trailing Shielding Gas Composition N/A Site of Electrode 1.3/32 - 5/32 2. N/A IN.
'j )0 Size of Filler 1. N/A 1 N/A IN. E LECT RICAL CHAR ACTE R ISTICS (OW-4091
,h N/A 3
- Electrode - Flux Class Current 1 DCRP 2 M/A 4 Consumsbie insert N/A Amps Range 1.85-195 2. N/A
,y Volts Renp 1. 18-25 2. N/A Tungsten Elec. Sire / Type N/A
~,
3 POSITION (QW405) TECHNIQUE (CW-410)
. Welding Position All Stringer or Weave Beed 1.Strin!* ? 2. M/A Welding Progression 3C: Upward Beed Width:
] See Page 2
, . Orifice or Gas Cup Sire M /A IN.
- P R EHE AT (QW-406) initial and laterpass efeening
- Welding surfaces shall be wire brushec Prehest Temp. (8) ,E (Mi"I or ground as required to remove slag. scale or other contaminants.
_~ Interpess . Temp. M any (8) *F Method of back gouging Crinding. Chiseine y< Prehest Maint. (8) *F 2 Oscillation 1. N/A 2, N/A IN.
3 JOINT DESIGN (OW-402) Contact Tube to work distance N/A IN.
1, \ Groove Design Da"kla t' Multiple or Single Lever 1. _.lipitiele j
J
\ Joint Type OB . Yes Cl N/A 35 Ye5 (per 3;de) 2. Multiple i
B acking Matt Type Sir::ilar to Base Metal Multipte or single electrodes Sinnie Travel Speed (Rangt) 1. N/A 2. N/A IPM Peening- Not Allowed REMARKS This procedurc meetc the requirec:ents of ASME Code Case N-71-9 and 1644.
J PREP TION,APPRpAM-j DATE
_ /wi /e#.uA J-20 A Fab. Codes: ANSI B31.1:AS?E Section III r Wpid% En incerdg ,
/ M r amb . Y .20 .?/ Project: CPSES Materials pnginejeri 4
/ [] . ~ & . j-M 11 Job No. CR-0172 Cuality Assuranc/ [T i