ML20126M112

From kanterella
Revision as of 04:30, 11 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-400/85-23 on 850528-30.No Violations or Deviations Noted
ML20126M112
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/17/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20126M114 List:
References
NUDOCS 8506200239
Download: ML20126M112 (2)


See also: IR 05000400/1985023

Text

- - _ -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

< ? .. DU)

SAFEGUARDS INFORMATION'

JUN 171985

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

'

SUBJECT: REPORT NO. 50-400/85-23

On May 28-30, 1985, NRC inspected activities authorized by NRC Construction

Permit No. CPPR-158 for your Shearon Harris Nuclear facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

'.

,

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

,

G

2kN ! PDR

00 David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

i

Enclosure:

'

Inspection Report No. 50-400/85-23

(Safeguards Information)

cc w/ encl:

R. A. Watson, Vice President

Harris Nuclear Project

R. M. Parsons, Project General Manager

],

(

bec w/ encl: (See page 2) .

g cLosun C0Wf9 . tott

g

urogsrgoggollio.

SAFEGUARDS INFORMATION' ,

- _ . __ - - . - _ _ _ _ _ . _

- - - - - - - - - - - - - __ _

~

Carolina Power and Light Company 2

MN17 E ,

bec w/ enc 1:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of North Carolina

.

RII RII RI RII RII

AT dg DMGul/e r J AI din re son

06// 9 85 06/g3 /8'S 0

06/t*/ 85

/85 06// 85 06/([/85

.ms--gu

'y^,r ,, ,, og,

sAFEGOARDS gNFORgATION' ,,

,c

. . -

- ._. . -

- . -