Text
'
.
p Efo UNITED STATES
/j ug'o NUCLEAR REGULATORY COMMISSION
[\\
/g/,
R EGION 11 j
101 MARIETTA STREET, N.W.
g*'
s AT L ANTA, GEORGI A 30323
...../
JUN 171986 Report No. 50-400/85-23 Licensee: Carolina Power and Light Company 411 Fayetteville Street Raleight, NC 27602 Docket No. 50-400 License No. CPPR-158 Facility Name: Shearon Harris Nuclear Power Plant Inspection Date:
May 28-30, 1985 Inspector:
NON ff4/)
b//
<FrE A.Ti}lm],'PhysicalSe'curityInspector Wte S'igned I M lo ' ll.17 Approved by b
.
.
' g.R.McGuire, Chief,QhysicalSecuritySection DateSi6ned
' Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:
This announced pre-operational inspection involved 12 inspector-hours on site inspecting:
Physical Security Plan Implementing Procedures; Security Organization; Physical Barriers - Protected Area; Physical Barriers - Vital Areas; Security System Power Supply; and Detection Aids - Protected Area.
Results:
The construction, installation and implementation of security facilities, equipment, and operational activities in the areas in which review could be accomplished, appeared to be progressing in accordance with the
%
provisions, and commitments of the proposed physical security, contingency, and training and qualifications plans.
g6200243050617 G
ADOCK 05000400 PDR ENCLOSURE CONTAINS*"
- * * * * " " " ' * *
3ApEGUARDS INFORMATION'
" "* " * NTROLLED.
PAGE IS DEc0