Ack Receipt of 850527 Request for Amend to License NPF-33 Re Electrical & Instrumentation & Control as-built Drawing Program.Request Will Be Considered Prior to Issuance of Full Power License
ML20127J855
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/18/1985
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jens W
DETROIT EDISON CO.
References
NUDOCS 8506270150
Download: ML20127J855 (1)


Text

. _ . . . . . .

G e

JUN 18 3935 Docket No. 50-341 The Detroit Edison Company ATTN: Dr. Wayne H. Jens Vice President Nuclear Operations 6400 North Dixie Highway Newport, MI 48166 Gentlemen:

Thank you for your letter (NE-85-0713) dated May 27, 1985 requesting a revision to Fermi 2 Operating License NPF-33, Attachment 1, Paragraph B.3.a..

We will consider your request prior to the issuance of the Fermi 2 full power license.

If you have any questions regarding our review of this matter, please contact Mr. C. C. Williams (312/790-5598) of my staff.

5*'

R. L. Spessard, Director Division of Reactor Safety cc: L. P. Bregni, Licensing Engineer P. A. Marquardt, Corporate Legal Department cc w/ltr dtd 05/27/85:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII M. D. Lynch, LPM, NRR J. M. Taylor, IE Ronald Callen, Michigan Public Service Coninission Harry H. Voight, Esq.

Nuclear Facilities and Environmental Monitoring Section RIII n RIII Will[.)7 RIII R W pff ag , f/jk C issotimos H ison Spe'ssard 06/I'4'/85 4

-Sf y,y C./g 8506270150 850618 1 DR ADOCK050%3 vg/

." DESIGMTED ORIGINAL LETIER .

m,"C'.ons Nxea. ome x

-P Detroit n

,,,,a Edison w=u n..,.... - g-May.27, 1985 '

h; -

NE-85-0713 -

Mr. James G. Keppler Regional Administrator .

Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reference:

(1) Fermi 2

?

NRC Docket No. 50-341 ..

I (2) Fermi 2 Facility Operating ~ License, ['

l License No. NPF-33

Subject:

Fermi 2 Facility Operating License Condition for Electrical and I&C As-built Drawina Procram The purpose of this letter is to request the assistance of NRC, Region III, in acquiring a clarification to the Fermi 2 Facility Operating License. Detroit Edison is addressing this request to Region III because it is related to the Electrical and I&C As-built Program which is under the purview of the Region.

The license, Attachment 1, paragraph B.3.a, states:

" Correct all remaining drawing deviations (not completed prior to fuel load or addressed in Item 2.a above) identified during walkdowns associated with the resolution of 10CFR50.55(e),

Item No.143, " Deviations of As-built Plant f rom Design Documents". Demonstrate that all design documents reflect the as-built configuration of the plant."

To assure this requirement is understood to apply to the nuclear safety-related electrical and I&C plant configura-tion and that some flexibility is allowed in the manner of final engineering disposition.of Category C deviations, the revised paragraph below is proposed for incorporation into the Fermi 2 full power license: ,

gg 311985 o,n - - Jnnan f' J {~~J ( i

lfiylyfs..

kdY

Ei<.

Mr. James G. Keppler

. May 27, 1985 NE-85-0713 Page 2

" Correct all remaining drawing deviations (not completed prior to fuel load or addressed in Item 2.a above) identified during walkdowns associated with the resolution of 10CFR50.55(e),

Item No. 143, "Deviat' ions of As-built Plant from Design Documents". Demonstrate that all design documentstrelated to the subject 50.55(e) Item No. 143 are reconciled tolthe as-built configur-ation of the plant."

The flexibility referred to above for Category C engineering dispositions includes, as an example, the acceptability of the drawing configuration shown below: i~

~ ~

Terminal Terminal '

Strip Strip r 1 a 1 3 3

, 3

. T a GT 4 ,

T T

Field , Drawing Minor pictorial differences as shown above which are electrically and functionally equivalent, may be acceptable as-is and so documented without requiring a revision to a drawing.

Please direct any questions to Mr. Lewis Bregni at (313)586-5083.

Sincerely, in f ,o cc: Mr . P. M . Byron Mr. N. J. Chrissotimos Mr. M. D. Lynch Mr. J. M. Taylor Mr. C. C. Wi]Iiams USNRC Document Contro3 Desk Washington, D.C. 20555