MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:UTILITY
MONTHYEARIR 05000369/19900201990-11-0707 November 1990 Insp Repts 50-369/90-20 & 50-370/90-20 on 901001-05 & 1101. No Violations or Deviations Noted.Major Areas Inspected: Design Changes & Mod & Engineering Support Activities IR 05000369/19900191990-10-0404 October 1990 Insp Repts 50-369/90-19 & 50-370/90-19 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of NDE Procedures, Observations of in-progress NDE Exams & Insp Plan IR 05000369/19900171990-09-11011 September 1990 Insp Repts 50-369/90-17 & 50-370/90-17 on 900726-0828. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities & Facility Mods IR 05000369/19900151990-09-10010 September 1990 Insp Repts 50-369/90-15 & 50-370/90-15 on 900813-17. Violations Noted But Not Cited.Major Areas Inspected:Annual Emergency Exercise ML20056A5861990-07-24024 July 1990 Insp Repts 50-369/90-11 & 50-370/90-11 on 900522-0625. Violations Noted.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities, Facility Mods & Follow Up of Events Repts ML20055H4841990-07-13013 July 1990 Insp Repts 50-369/90-14 & 50-370/90-14 on 900626-0705. Violations Noted.Major Areas inspected:licensee-identified Issues Re Unit 1 Diesel Generator Inoperability for Approx 26 H on 900625-26 IR 05000369/19890301989-09-20020 September 1989 Insp Repts 50-369/89-30 & 50-370/89-30 on 890821-24.Noncited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000369/19890151989-09-0707 September 1989 Insp Repts 50-369/89-15 & 50-370/89-15 on 890605-09,19-23 & 0728.No Violations or Deviations Noted.Major Areas Inspected:Maint Program & Program Implementation IR 05000369/19890291989-08-31031 August 1989 Insp Repts 50-369/89-29 & 50-370/89-29 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected: Portions of Inservice Insp Program,Unit 2 Insp Plan for Outage,Review of NDE Procedures & Exam Verifications IR 05000369/19890261989-08-30030 August 1989 Insp Repts 50-369/89-26 & 50-370/89-26 on 890807-11.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry,Previously Identified Items & Status of Steam Generator Blowdown Recycle Sys IR 05000369/19890221989-08-17017 August 1989 Insp Repts 50-369/89-22 & 50-370/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Unit 2 Steam Generator Tubing & Previous Open Item IR 05000369/19890211989-08-16016 August 1989 Insp Repts 50-369/89-21 & 50-370/89-21 on 890707-18. Violations Noted.Major Areas Inspected:Operation of Unit 1 Following Improperly Performed Heat Balance & Concomitant Nonconservative Calibr of Power Range Nuclear Instruments IR 05000369/19890201989-08-16016 August 1989 Insp Repts 50-369/89-20 & 50-370/89-20 on 890717-21.No Violations Noted.Major Areas Inspected:Containment Local Leak Rate Testing & Verification of Containment Integrity IR 05000369/19890181989-08-0909 August 1989 Insp Repts 50-369/89-18 & 50-370/89-18 on 890629-0728.No Violations or Deviations Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities,Followup of LER & Followup on Previous Findings IR 05000369/19890161989-08-0808 August 1989 Insp Repts 50-369/89-16 & 50-370/89-16 on 890622-28.One Violation & One Deviation Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on LER & Previous Insp Findings IR 05000369/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-369/89-23 & 50-370/89-23 on 890727 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Security Event Logs IR 05000369/19890191989-07-19019 July 1989 Insp Repts 50-369/89-19 & 50-370/89-19 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Program & Unit 2 Insp Plan for Outage,Nde procedures,in-progress NDE Exams & NDE Equipment Calibr ML20236E6471989-07-13013 July 1989 Insp Repts 50-369/89-14 & 50-370/89-14 on 890422-0601. Violation Noted.Major Areas Inspected:Operation Safety Verification,Surveillance Testing,Maint activities,10CFR21 Reviews,Followup on Previous Insp Findings & LERs IR 05000369/19890171989-07-10010 July 1989 Insp Repts 50-369/89-17 & 50-370/89-17 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected: Responses to Previous Insp Findings,Including Followup on NRC Bulletins 88-001 & 88-003 & on 10CFR21 Rept on Breakers ML20244E5881989-06-0505 June 1989 Insp Repts 50-369/89-11 & 50-370/89-11 on 890330-0421. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890131989-06-0101 June 1989 Partially Withheld Insp Repts 50-369/89-13 & 50-370/89-13 on 890501-05 (Ref 10CFR2.790 & 73.21).Two Noncited Violations Noted Re Failure to Conduct Psychological Exam.Major Areas Inspected:Mgt Support,Record & Repts & Lighting ML20247M5801989-05-15015 May 1989 Insp Repts 50-369/89-10 & 50-370/89-10 on 890404-07.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Requirements & Practices Implemented During Licensee Response to Steam Generator B Tube Rupture IR 05000369/19890021989-04-25025 April 1989 Operational Safety Team Insp Repts 50-369/89-02 & 50-370/89-02 on 890213-17 & 0227-0322.Violations Noted.Major Areas Inspected:Operations,Maint Support of Operations,Mgt Controls & Emergency Operating Procedures ML20245G9781989-04-20020 April 1989 Insp Repts 50-369/89-05 & 50-370/89-05 on 890228-0329. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890071989-04-17017 April 1989 Insp Repts 50-369/89-07 & 50-370/89-07 on 890320-24.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of Procedures,Observation of Work Activities & Evaluation of Eddy Current Testing IR 05000369/19890061989-04-10010 April 1989 Insp Repts 50-369/89-06 & 50-370/89-06 on 890308-11.Major Areas Inspected:Events Re 890307 Steam Generator B Tube Failure.Procedures Found to Have Weaknesses Which Could Result in Release of Radioactivity to Environ IR 05000369/19890081989-04-0606 April 1989 Insp Repts 50-369/89-08 & 50-370/89-08 on 890327-31.No Violations Noted.Major Areas Inspected:Steam Generator Tubing Eddy Current Exam & Activities Associated W/Unit 1 Steam Generator B Ruptured Tube IR 05000369/19890091989-03-30030 March 1989 Partially Withheld Insp Repts 50-369/89-09 & 50-370/89-09 on 890220-24 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Security Program Audit,Records & Repts & Compensatory Measures IR 05000369/19890031989-03-30030 March 1989 Insp Repts 50-369/89-03 & 50-370/89-03 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Triennial post-fire Safe Shutdown Capability Reverification & Assessment (Module 64150) ML20244A8831989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures IR 05000369/19890011989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures ML20235P5621989-02-0707 February 1989 Insp Repts 50-369/88-33 & 50-370/88-33 on 881122-890119. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint activities,10CFR21 Insp,Startup from Refueling & Followup on Previous Insp IR 05000369/19880301988-11-0404 November 1988 Insp Repts 50-369/88-30 & 50-370/88-30 on 880924-1020. Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880271988-10-28028 October 1988 Insp Repts 50-369/88-27 & 50-370/88-27 on 880913-16.No Violations or Deviations Noted.Weakness Noted.Major Areas Inspected:Annual Radiological Emergency Response Exercise IR 05000369/19880281988-10-14014 October 1988 Partially Withheld Insp Repts 50-369/88-28 & 50-370/88-28 on 880912-16 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Maint Barriers,Assessment Aids,Access Controls,Alarm Stations & Training & Contingencies IR 05000369/19880261988-10-12012 October 1988 Insp Repts 50-369/88-26 & 50-370/88-26 on 880820-0923. Violation Noted:Inadequate Fire Barrier Penetrations.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Findings IR 05000369/19880241988-10-0606 October 1988 Insp Repts 50-369/88-24 & 50-370/88-24 on 880801-0916. Violations & Unresolved Item Noted.Major Areas Inspected: Past & Current Operability of Hydrogen Skimmer Sys IR 05000369/19880291988-09-23023 September 1988 Insp Repts 50-369/88-29 & 50-370/88-29 on 880829-0909. Violations Noted.Major Areas Inspected:Inoperability of Safety Sys Due to Inadequate post-mod Testing ML20205S0711988-09-13013 September 1988 Insp Repts 50-369/88-25 & 50-370/88-25 on 880816-18.No Violations or Deviations Identified.Major Areas Inspected: Resolution of Findings from NRC Diagnostic Evaluation Team Rept & Status of Licensee Written Response to Rept ML20154F9911988-09-0606 September 1988 Insp Repts 50-369/88-23 & 50-370/88-23 on 880723-0819.One Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings ML20151Z8821988-08-19019 August 1988 Insp Repts 50-369/88-20 & 50-370/88-20 on 880625-0722. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880221988-08-11011 August 1988 Partially Withheld Insp Repts 50-369/88-22 & 50-370/88-22 on 880718-22 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Procedures & Operations of SNM IR 05000369/19880161988-07-26026 July 1988 Insp Repts 50-369/88-16 & 50-370/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages IR 05000369/19880191988-07-21021 July 1988 Insp Repts 50-369/88-19 & 50-370/88-19 on 880627-0701.No Violations or Deviations Noted.Major Areas Inspected:Nde Activities Re Resistance Temp Detector Sys Mods & Inservice Insp & Preservice Insp Being Accomplished During Outage IR 05000369/19880171988-07-15015 July 1988 Insp Repts 50-369/88-17 & 50-370/88-17 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluents IR 05000369/19880181988-07-12012 July 1988 Partially Withheld Insp Repts 50-369/88-18 & 50-370/88-18 on 880620-24 (Ref 10CFR2.790 & 73.21).One Licensee Identified Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security Program & Records & Repts ML20151E6081988-07-0808 July 1988 Insp Repts 50-369/88-14 & 50-370/88-14 on 880521-0624. Violations Noted:Continued Weakness in Procedural Compliance.Major Areas Inspected:Safety Verification, Surveillance Testing & Refueling Outage Activities IR 05000369/19880151988-06-30030 June 1988 Insp Repts 50-369/88-15 & 50-370/88-15 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nde Procedures Review,Observation & Review of in-process NDE Exam & Review of Inservice Insp Exam Data ML20195C8611988-06-0707 June 1988 Insp Repts 50-369/88-13 & 50-370/88-13 on 880502-06.One Violation & Two Unresolved Items Noted.Major Areas Inspected:Nrc Diagnostic Evaluation Team Rept Findings & Action on Previous Insp Findings ML20155J3411988-05-31031 May 1988 Insp Repts 50-369/88-12 & 50-370/88-12 on 880423-0520. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings 1990-09-11
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19993011999-03-18018 March 1999 NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205.Five SRO & Six RO Candidates Received Written Exams & Operating Tests IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20154C4131998-09-21021 September 1998 Notice of Violation from Insp on 980712-0822.Violation Noted:On or Before 971217,operations Personnel Failed to Designate Appropriate Vent Valves for Venting to Properly Return Sys to Svc as Required by Omp 7-1 IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20237B1561998-08-0707 August 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:Licensee Failed to Establish Procedural Guidance for Abnormal Vent Path Used for Degassing Unit 1 Volume Control Tank to Environ IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-030, on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event1998-06-0404 June 1998 PNO-II-98-030:on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event ML20249A2451998-06-0404 June 1998 Notice of Violation from Insp on 980413-24.Violation Noted: Procedure Investigation Processes 2-M96-1440 & 0-M97-1933 Were Not Initiated within 24 H After Realization That Procedure Investigation Process Should Have Been Written IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6051998-04-0606 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Licensee Failed to Adequately Establish or Adhere to Procedural Guidance for Repair of Two safety-related Containment Isolation Valves as Evidenced ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security ML20203F5921998-02-23023 February 1998 Notice of Violation from Insp on 980105-08.Violations Noted: Licensee Failed to Follow Procedures for Security Badge & Access Control IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys IR 07100102/20120131998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Inadequate Measures Were Provided for Verification or Checking Adequacy of Design Documents ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1571998-01-0505 January 1998 Notice of Violation from Insp on 971205-06.Violation Noted: an Event Occurred on 971202 in Which Person or Persons Made Credible Threat to Commit or Cause Significant Physical Damage to Power Reactor & Not Reported within One Hour ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg ML20203M4471998-01-0505 January 1998 Errata to Notice of Violation for Insp Repts 50-369/97-19 & 50-370/97-19.Statement in Nov,Page 2, Under Authority of Section 182 of Act.42USC 2232,this Response Shall Be Submitted Under Oath or Affirmation, Was Incorrect IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N4701997-10-20020 October 1997 Notice of Violation from Insp on 970810-0920.Violation Noted:On 960420,ET Guidelines,Apps C & E Were Not Implemented as Evidenced By;Resolution Analyst Revised & Overruled Reexam Request for SG 2A Tube R7C60 ML20212A0361997-10-0808 October 1997 Notice of Violation from Insp on 970712-0827.Violation Noted:As of 970717,10 of 48 Ice Condenser Inlet Doors on Unit 2 Required Initial Opening Torque in Ixcess of 675 inch-pound Operability Limit ML20211K9431997-09-26026 September 1997 Notice of Violation from Insp on 970721-26.Violation Noted: Licensee Failed to Follow Procedures for Security Badges & Access Control of Facility IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19973001997-08-29029 August 1997 NRC Operator Licensing Exam Repts 50-369/97-300 & 50-370/97-300 (Including Completed & Graded Tests) for Test Administered on 970728-31.Exam Results:Five SRO & One RO Passed Exam & One SRO Failed Exam IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20217R1161997-08-18018 August 1997 EN-97-076:on 970818,order Prohibiting Involvement in NRC- Licensed Activities for a Period of One Year Will Be Issued. Action Based on Investigation Conducted by Oi,Which Determined Falsification of QA Document PNO-II-97-051, on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened1997-08-0909 August 1997 PNO-II-97-051:on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149L5701997-07-28028 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:Procedure IP/0/A/3250/12B Inadequate to Provide Sufficient Guidance to Properly Test Emergency Diesel Generator Sequencer Logic Circuitry ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149G6771997-06-16016 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:Procedure PT/1/A/4600/014D Was Inadequate in Providing Sufficient Guidance to Bypass Properly RPS Functions of an Inoperable N-41 Channel to Permit Testing of Channel N-42 IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148B9621997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Prior to 961130,activities Affecting Quality,Not Accomplished in Accordance W/Instructions,Procedures or Drawings IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support 1999-08-26
[Table view] |
See also: IR 05000369/1985021
Text
. .
o UNITED STATES
[csR Ric '
NUCLEAR REGULATORY COMMISSION
? \ REgloN 11
hI
,
' s
101 MARIET Y A STREET. N.W.
ATL ANTA, GEORGI A 30323
s, m /
+...+
.
Report Nos.: 50-369/85-21 and 50-370/85-22
Licensee: Duke Power Company
422 South Church Street
Charlotte, NC 28242
Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17
Facility Name: McGuire 1 and 2
Inspection Conducted: M y 21 - June 20, 1985
Inspectors: _
,_ _ _ _ _
_j[_h
W. T. Orders deni Reside 4 nspector te Si ned
-R. C. Pief so M ' ntUinsp
Re _./.cjgF- %
-
Ah.g ed
at
Approved by: b
C. Danc ,
de-<a.-.-.
ection Cnief
_7M T
ate igned
Division of Reactor Projects
SUMMARY
Scope: This routine, unannounced inspection entailed 300 inspection hours on
site in the areas of operations, safety verification, surveillance testing,
maintenance activities and refueling activities.
Results: Of the 5 areas inspected, no violations or deviations were identified
in 2 areas; I apparent violation was identified in each of the areas of opera-
tions, surveillance and refueling.
1) Failure to follow procedures and inadequate procedure resulting in valve
misidentification, failure to reposition interlock, and failure to complete
shift turnover.
2) Failure to perform surveillance on unlocked /open fire doors.
3) Breach of containment integrity.
8500140422 050002
PDR ADOCK 05000369
o PDR
- __
4
. .
'
,
REPORT DETAILS
1. Persons Contacted
1
Licensee Employees
T. McConnell, Plant Manager
- G. Cage, Superintendent of Operations
- D. Rains, Superintendent of Maintenance
B. Hamilton, Superintendent of Technical Services
- L. Weaver, Superintendent of Administration
- B. Travis, Superintendent of Integrated Scheduling
E. McCraw, License and Compliance Engineer
- *D. Mendezoff, License and Compliance Engineer
'
- W. McDowell, Technical Specialist-Licensing
- G. Gilbert, Operations Engineer
- R. Phillips, Operations Engineer
- R. Michael, Station Chemist
P. Huntley, Health Physicist
- K. Carney, Shift Supervisor
- R. Johansen, Performance Engineer
4
- D. Motes, Maintenance Engineer
Other licensee employees contacted included construction craftsmen,
technicians, operators, mechanics, security force members, and office
personnel.
2. Exit Interview
The inspection scope and findings were summarized on June 25, 1985, with
those persons indicated in paragraph 1 above. The licensee acknowledged
understanding of the issues discussed and offered no substantive related
discussion. The licensee did not identify as proprietary any of the
mate. rials provided to or reviewed by the inspectors during this inspection.
l
3. Licensee Action on Previous Enforcement Matters
No licensee action on previous enforcement items is discussed.
4. Unresolved Items *
Unresolved items were not identified in this inspection.
5. Plant Operations
The inspection staff reviewed plant operations during the report period,
t
May 21 - June 20, 1985, to verify conformance with applicable regulatory
requirements. Control room logs, shift supervisors logs, shift turnover
! *An Unresolved Item is a matter about which more information is required to
determine whether it is acceptable or may involve a violation or deviation.
!
i
i __
_ _ _ _ _ _ _ _ _ _
-
. -
'
2
records and equipment removal and restoration records were routinely
perused. Interviews were conducted with plant operations, maintenance,
chemistry, health physics, and performance personnel.
Activities within the control rooms were monitored during shif ts and at
shift changes. Actions and/or activities observed were conducted as
prescribed in applicable station administrative directives. The complement
of licensed personnel on each shif t met or exceeded the minimum required by
technical specifications.
Plant tours were taken during the reporting period on a systematic basis.
The areas toured included but were not limited to the following: Turbine
Buildings, Auxiliary Buildings, Units 1 and 2, Electrical Equipment Rooms,
Units 1 and 2, Cable Spreading Rooms, Station Yard Zone within the protected
area, and Unit 1 Reactor Building. During the plant tours, ongoing
activities, housekeeping, security, equipment status and radiation control
practices were observed.
McGuire Unit 1 began the reporting period in Mode 6 in its second refueling
outage with core reload in progress. Fuel loading was completed at 6:29 a.m.
on Sunday May 26, 1985. The unit entered Mode 5 at 11:45 p.m. on June 5,
1985 where it remained until 9:48 a.m. on June 19, when the unit entered
Mode 4. The unit remained in Mode 4 recovering from a refueling outage for
the duration of the reporting period.
McGuire Unit 2 began the reporting period in Mode 1 operating at 100%
reactor power and remained at or about 100% power until 9:19 a.m. June 1,
1985 when the unit tripped from a turbine trip. This reactor trip is
discussed in paragraph 6. All systems responded normally following the
trip. The unit was restarted and entered Mode 2 on June 2,1985. The
reactor was critical at 5:29 a.m. and entered Mode 1 at 7:25 a.m. At
3:40 a.m. on June 3, the reactor reached 100% reactor power and remained at
or about 100% throughout the duration of the reporting period.
6. Reactor Trip
On June 2,1985, at 9:19 a.m. Unit 2 experienced a reactor trip from 100%
power. The reactor trip resulted from a feedwater isolation induced feed
pump trip and turbine trip. Subsequent evaluation determined that the i
feedwater isolation resulted from a dc ground in the exterior " doghouse" {
(mechanical penetration room) water level instrumentation. This water level
sensor, designed to isolate the feedwater system in the event of a feedwater
pipe rupture, has three level sensors providing an input to a relay which
subsequently initiates the feedwater isolation signal. One level sensor
provides alarm indication upon reaching 6" with hi-hi level at 12" from two
out of three sensors initiating the feedwater isolation. The ground appeared
on the wiring between the sensor and the relay which caused the hi-hi level
isolation signal to be initiated without a hi level alarm indication.
Following a determination of the cause of the trip the reactor was restarted
l
l
l
--a
_
. .
3
with the unit reaching criticality at 5:29 a.m. on June 2,1985 and 100%
power at 3:40 a.m. on June 3, 1985.
7. Safety Injection Procedures
On June 5,1985 at 2:10 p.m. during a routine procedure required / actual
position equipment verification, the inspector detected that on page 1 of 8
of the valve lineup checklist, of procedure OP-2-A-6200-06 Safety Injection
System that valve 2 NI-162 was listed as the NI pump min flow valve. In
actuality valve 2 NI-162 is the safety injection discharge cold leg isola-
tion valve.
A review of the master file copy of the procedure revealed that the procedure
deficiency dates back to at least December 1983.
The above event constitutes an example of an inadequate procedure. This
example, in conjunction with events detailed in paragraphs 8 and 9 consti-
tutes a violation (370/85-22-01).
8. Personnel Airlock Integrity
On March 20, 1985, at approximately 11:00 a.m. , while Unit I was at 65%
power, two Performance Technicians discovered an interlock keyswitch inside
the Unit 1 lower personnel airlock in the " bypass" position. With the
keyswitch in this position, it was possible to open both the Reactor side
airlock door and the Auxiliary side airlock door, thus losing containment
integrity. With the keyswitch in the " bypass" position, the interlock
function is inoperable and consequently the containment airlock is techni-
cally inoperable.
The containment airlock is required by Technical Specifications (TS) and is
verified operable by TS 4.6.1.3c surveillance performed at least once per
six months. The discovery was made while performing section 12.8 of
PT/1/A/4200/01F, Lower Containment Personnel Lock Leak Rate Test, which is
performed pursuant to TS 4.6.1.3c. The technicians immediately ensured both
doors were closed and sealed and informed Control Room personnel of the
discovery. Containment integrity was not lost.
There is no record of both lower airlock doors being opened simultaneously
af ter 1:00 p.m. on 0?cember 18, 1984. Unit 1 entered Mode 4, at 2:12 a.m.
on December 19, 1984, af ter containment integrity was verified. This
included having at least one airlock door closed at all times.
Operations personnel sometimes white tag both doors open on the upper and
lower personnel airlocks if the associated unit is to be in Mode 5 or 6
(with containment integrity not required) for an extended time. Opening and
closing both doors is performed using OP/0/A/6700/06, Personnel Airlock
Operations, which was revised and reissued in August 1984 with all sign-off
lines deleted. With no sign-offs required, the possibility of not fully
implementing the procedure was increased. Further there were no steps in f
I
the unit start-up procedure to verify the airlock interlocks were properly
positioned prior to entering a mode in which they were required.
. _ _ _ _ _ _
-
. .
.
4
Performance personnel found the interlock inside the lower airlock in the
" bypass" position. Since there is no documentation reflecting the posi-
tioning of the interlock keyswitch, no determination can be made as to when
the interlock failed to cet changed to the " active" position. It is highly
probable that the failure to reposition the keyswitch occurred when the
airlock was returned to service prior to the unit entering Mode 4 in
December 1984.
TS 6.8.1.a requires that current written approved procedures be established,
implemented and maintained for safety related activities. Implicit in that
stipulation is the requirement that procedure guidance be specific enough to
facilitate the successful accomplishment of the task.
The interlock keyswitch inside the personnel airlock as specified in procedure
OP/0/A/6700/06 was not returned to the active position in December 1984
prior to the unit entering mode 4. Further complicating and perhaps leading
to this event is the fact that operations procedure CP/0/A/6700/06, Personnel
Airlock Operations, does not require a sign-off step to verify tnat the
interlock key switches are in the " active" position when returning the
airlock to service. Further Units 1 and 2 operating procedures OP/1/A/6700/01
and OP/2/A/6100/01, Controlling Procedures for Unit Start-up, do not verify
the airlock interlock pcsition prior to entering Mode 4. The failure to
return the airlock inter'ock to normal is an example of a failure to follow
procedure. This in conjtnction with items discussed in paragraphs 7 and 9
constitutes a violation (369/85-21-01).
9. Shift Relief
On June 12 at 9 : 10 a .m. , while reviewing the current Shift Supervisor
Turnover Checklist, the inspector noted that the checklist had not been
completed. The inspector brought this matter to the attention of the Senior
Reactor Operator who then completed the form.
Station Directives 3.1.9, Relief at Duties of Plant Operation, specifies
procedures to promote continuity of safety and efficiency during the process
of relief of persons at duties of plant operation. Included in this shift
relief process is the compl-etion of the Shift Supervisor Turnover Checklist.
Secticn 4 of Station Directive 3.1.9 requires that the shif t supervisors
fill out and follow the "Snift Supervisor Turnover Checklist", during shift ,
turnover. The oncoming Shift Supervisor must determine the required minimum '
shift composition for h15. shift, and identify the individuals that will man
the positions.
TS 6.8.1.a requires that current written approved procedures be established,
implemented and maintained covering shift relief and turnover.
Contrary to those requirements, on June 12, the Shift Supervisors Turnover
Checklist was not completed and followed during shift turnover, in that page
3 of 4 was not completed identifying shift crew composition. This in I
conjunction with the items discussed in paragraphs 7 and 8 constitutes a
violation (369/85-21-01, 370/85-22-01).
.
.
. .
5
r
10. Fire Door Inspections
On April 14, 1985, during a routine QA audit of completed copies of procedure
PT/0/A/4250/12, Fire Door Inspections, the licensee noticed that PD-1 and
PD-2, fire doors for the Units I and 2 ETB switchgear rooms respectively,
were found unlocked on each weekly surveillance since February 14, 1985. It
was determined that no daily surveillance was being performed on these two
unlocked doors as required by TS 4.7.11.2a. On April 18 and 25,1985,
Health Physics personnel again listed fire doors PD-1 and PD-2 as unlocked
during weekly surveillance. Again no daily surveillance was performed on
these docrs by any group.
Evaluation of the missed surveillances revealed that the security organiza-
tion for McGuire was initially given the responsibility for the daily and
weekly fire door inspections. TS 3.7.11 weekly and daily fire door inspections
were performed under PT/0/A/4250/11, Fire Door Inspections.
In August of 1984, a meeting was held between the Security Compliance
officer, a Security Specialist, the Mechanical Maintenance Technical
Specialist (MMTS) responsible for fire door repairs and the Station Health
Physicist to discuss fire door responsibilities in the Radiation Control
Area (RCA). Since Security personnel must contact Health Physics personnel
for access to the twelve fire doors located in the RCA, Health Physics
agreed to perform the weekly inspections on those doors. Procedure
PT/0/A/4250/12 (Fire Door Inspections) was written for Health Physics to use
for the inspections.
Health Physics personnel performed the weekly :urveillance of the twelve
fire doors from September 6, 1984 until April 30, 1985. From February 14,
to April 11, 1985, Health Physics personnel listed fire doors PD-1 and PD-2
as unlocked during the weekly surveillance.
Tersely stated there was a great deal of confusion as to which group was
responsible for the twelve fire doors in question following the August 1984
meeting. As a result no action was taken when PO-1 and PD-2 were found
unlocked. The matter was complicated further by the unclear delineation of
respensibiltty in PT/0/A/4250/11 and PT/0/A/4250/12. In both procedures,
Maintenance was identified as responsible for the review of completed
'
procedures. Both Security and Health Physics assumed this review would
ensure that appropriate action was taken on fire doors if needed.
The net result is that fire doors PD-1 and PD-2, which are normally locked
closed, were unlocked from February 14, 1985 to April 14, 1985 during the
Unit 2 refueling outage. The doors were . then locked by operations but
l- subsequently were unlocked and remained unlocked, even though this problem
was identified by a QA audit conducted on April 14, 1985. The problem was
corrected on April 30, 1985 when daily inspections of the unlocked doors
commenced. As previously stated, the doors are normally verified closed on
a weekly basis ir, accordance with PT/0/A/4250/12 (Fire Dcor Inspections) and
TS 4.7.11.2c. While unlocked, the doors were not verified closed daily as
required by TS 4.7.11.2a.
m
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
-
. .
6
10 CFR 50, Appendix B, Criterion XVI as implemented by Duke Power Company
(DPC) Topical Report, Quality Assurance Program Duke-1-A, Amendment 7,
Section 17.2.16 requires that conditions adverse to quality be promptly
identified and corrected. In as much as this condition was identified by
Quality Assurance two weeks before corrective action was implemented, the i
intent of Criterion XVI was not met.
In summary, the requirements of 10 CFR 50, Appendix B, Criterion XVI,
corrective action was not taken until April 30, 1985 to verify fire doors
PD-1 and PD-2 were closed daily following identification of this problem by
a routine QA audit conducted on April 14, 1985. As a result the require-
ments of TS 4.7.11.2a, fire doors PD-1 and PD-2 were not verified closed
daily during the time April 14 - 30, 1985 while these fire doors were
unlocked. This is a violation (369/85-21-02, 370/85-22-02).
11. Containment Integrity
On May 25,1985 at 8:05 p.m., Unit I was in mode 6 actively reloading the
core, when the licensee detected that valve 1 RV-429, a containment ventila-
tion cooling water vent valve outside containment, was found open during the
performance of a containment integrity verification procedure PT-1-A-4200-02C.
This valve being open in conjunction with valve 1 RV-365, a vent valve on the
same line inside containment being open, resulted in a breach of containment
integrity. Valve 1 RV-429 was immediately closed and locked as required.
Valve 1 RV-429 had been verified closed during be performance of
PT-1-A-4200-02C which had been run during the period spanning May 17 and
May 19, 1985. Sometime during the period between May 19 and May 25, 1985,
valve 1RV-429, a valve which is required by procedure to be locked closed,
was unlocked and misaligned. No documentation can be found either authoriz-
ing or documenting the realignment. Apparently a personnel error during the
above period resulted in mispositioning of this valve.
Procedure OP-0-A-6400-09, Containment Ventilation Cooling Water System,
specifies the inboard and outboard vent valves to be closed and locked
during operation. This procedure is specified for completion before unit
startup and placing the ventilation cooling water in service.
TS 3.9.4, Containment Building Penetrations, requires during core altera-
tions that each penetration providing direct access from the containment to
the outside atmosphere, shall either be closed by an isolation valve, blind
flange, manual valve or be exhausting through operable reactor building
containment purge exhaust system HEPA filters and charcoal absorbers.
Contrary to those requirements, penetration M 385, Containment Ventilation
Cooling Water In, was not isolated or exhausting through an operable filter
during the period May 19 - May 25,1985 when core alterations were in
progress. This is a Violation (369/85-21-03). Licensee Event Report
370/85-06 also described a containment integrity problem during core
alterations involving maintenace/ surveillance activities.
_ _ _ _ _ _ ~
. .
'
.
7
12. Surveillance Testing
The surveillance tests categorized below were analyzed and/or witnessed by
the inspector to ascertain procedural and performance adequacy.
The completed test procedures examined were analyzed for embodiment of the
necessary test prerequisites, preparations, instructions, acceptance criteria,
and sufficiency to technical content.
The selected tests witnessed were examined to ascertain that current written
approved procedures were available and in use, that test equipment in use
was calibrated, that test prerequisites were met, system restoration completed
and test results were adequate.
The selected procedures persued attested conformance with applicable TS and
procedural requirements, they appeared to have received the required adminis-
trative review and they apparently were performed within the surveillance
frequency specified.
PT/2/A/4252/02 M/D CA Pump 2A Performance Test
PT/2/A/4209/01A NV Pump 2A Performance Test
PT/1/A/4252/02P CA Valve Stroke Timing Quarterly
PT/1/A/4204/018 RHR Pump 1B Performance Test
PT/0/A/4250/04G Turbine Trip Reactor Trip Functional Test
PT/1/A/4208/02 Containment Spray Stroke Timing Test
PT/1/A/4209/01B Centrifugal Charging Pump Performance Test
PT/1/A/4204/018 Residual Heat Removal Pump Performance Test
13. Maintenance Observations
The maintenance activities categorizej below were analyzed and/or witnessed
by the resident inspection staff to ascertain procedural and performance
adequacy.
The completed procedures examined were analyzed for embodiment of the
necessary prerequisites, preparation, instructions, acceptance criteria and
sufficiency of technical detail.
The selected activities witnessed were examined to ascertain that where
applicable, current written approved procedures were available and in use,
that prerequisites were met. Equipment restoration completed and maintenance
results were adequate.
The selected work requests / maintenance packages persued attested conformance
with applicable TS and procedural requirements and appeared to have received
the required administrative review.
-
. .
.
8
WORK REQUEST EQUIPMENT
113095 Repair INC-18
106134 Repair / Plug Leak on 1NV-239
950479 1 CA-22 Check Valve Installation and Hydro
036677 PM/PT on Limitorque Operator
14. Licensee Event Reports
The following licensee event reports (LER) were reviewed inorder to deter-
mine the adequacy of corrective actions the implications as they pertain to
safety of operations, the applicable reporting requirements, and licensee
review of the event.
Based on the results of this review, the items are closed.
Unit 1, LER's
83-03 83-42 83-62 83-71
83-04 83-45 83-63 84-05
83-26 83-49 83-64 84-04
83-28 83-52 83-66 84-20
83-33 83-59 83-68 84-21
83-40 83-60 83-69 84-24
83-41 83-61 83-70
Unit 2, LER 85-15
,