ML20073E770

From kanterella
Revision as of 16:39, 27 April 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1983
ML20073E770
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 03/02/1983
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20073E756 List:
References
NUDOCS 8304150311
Download: ML20073E770 (3)


Text

  • 7, .

/N OPERATING DATA REPORT DOCKET NO. 50-364 DATE 3/02/83 COMPLETED BY W.G.llairston.III TELEPilONE (203)S99-5156 OPERATING STATUS Joseph M. Farley - Unft 2 N"

1. Unis Name:
2. Regwnting Period: February, 1983 1) Cumulative data since
3. Licenwd Thermal Power (MWt): 2.652 7/30/81, date of
4. Nameptese Rating (Grow MWe): 860 commercial operation.
5. Design Electrical Rating (Net MWe): 829
6. Masimum Dependable Capacity (Gross MWe): 854.7
7. Masiman Dependable Capacity (Net MWe): 813 7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A (Net MWe): N/A

9. Power Lesel To Which Restricted.if N Any/A
10. Reawns For Restrictions.lf Any:

/

This Month Yr..to.Date Cumulatise

11. Ilours In Reporting Period 672 1,416 13,897
12. Number Of flours Reactor Was Critical 672 1,416 12,200.5
13. Reactor Resene Shutdown flours 0 0 138.4
14. Ilours Generator On.Line 672 1,416 12,018.4
15. Unit Rewne Shutdown llours 0 0 0
16. Grms Thermal Energy Generated (MWil) 1.778.710 3.745.905 29.167.719 17 Gross Electrical Energy Generated (MWil) 569.916 1,201,652 9.874,886
18. Net Electrical Energy Generated (MWil) 542,812 1,144,366 9,360,416
19. Unit Senice Factor 100.0 100.0 86.5
20. Unit Asailability Factor 100.0 100.0 86.5
21. Unit Capacity Factor IUsing MDC Net) 99.3 99.3 82.8
22. Unit Capacity Factor (Using DER Net) 97.4 97.5 81.2
23. Unit forced Outage Rate 0.0 0.0 6.8
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date,and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed p INITIAL CRITICALITY 5/06/81 5/08/81

\ INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIA L OPER ATION 8/01/81 7/30/81 f304150311 830311 gnf773 PDR ADOCK 05000364 R PDR

1. v. .. , . - s

)

DOC):L ' 50-364 I UNIT 2 DATI 3/02/83 W. G. Hairston, III COMPLETED BY

! IILEPl!ONE (205) 899-5156 i

1 l FEBRUARY SIONT11 i DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe Net) (SIWE Net) 801 810

,_ g7 809 gg 810 2

810 39 796 3

812 806 4 79 810 21 805 3

1 6 803 22 805 812 808

] 7 3 g 813 24 809

! 9 ,

813 25- 810 10 810 26 797 11 798 27 809 12 812 ;3 807 13 811 29 14 811 30 p 15 812 33 16 809 .

INSTRUCIlONS On this fonnst. list the avenge daily umt power levelin MWe Net for each d:y in the reporting inunth. Compute to

, the nesse:t whole nc;2 wait.

)

4 (9(77) 4 O

i 1

- e n,

.. . . . . ~ -- + . a w. , , __ . , _ ,

~

r). ,

x._/ N. y/

UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 ."

UNIT NAhlE .1.M. Farlev-Unit 2 DATE 3/02/83 CO51PLETED UY W.G.Hairston,III ,

REPORT Af 0NDI FEBRUARY TELEPilONE (205)899-5156 c re 3 -

3 sa : - Ba

-. .2 e 8 ysM Licensee c r. c. Cause 1 Corrective No. Date g 3g  ;; ,3 g 5 Event n? E.3 Action to

$. 5 jig Repor # _

NC ' Prevent Recurrence d

There were no unit shutdowns or sig 11fican ; power reduct; ons iri the clonth of February. ,

i 2 3 4 F: Forced Reason: hiethod: Exhibit G - Instructions s S: Ssheduled A-Equipment Failure (Explain) 14tanual for Preparation of Data B4taintenance of Test 24f anual Scram. Entry Sheets for Licensee C.Refuelmg 3 Autunutic Scram. Event ReporI (1.ER) File INUREG-D.Regulatosy Restriction l 4 Other (Explain) 0161)

E-Operator Training & license Examination F Administrative 5 G Opeutional Leror (Explain) Eslobit I - Same Sonice (9/77) 11 Othes (lixplain)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _