ML20073E770
| ML20073E770 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 03/02/1983 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20073E756 | List: |
| References | |
| NUDOCS 8304150311 | |
| Download: ML20073E770 (3) | |
Text
7,
/N OPERATING DATA REPORT 50-364 DOCKET NO.
DATE 3/02/83 COMPLETED BY W.G.llairston.III TELEPilONE (203)S99-5156 OPERATING STATUS N"
- 1. Unis Name:
Joseph M. Farley - Unft 2
- 2. Regwnting Period:
February, 1983
- 1) Cumulative data since
- 3. Licenwd Thermal Power (MWt):
2.652 7/30/81, date of 860 commercial operation.
- 4. Nameptese Rating (Grow MWe):
829
- 5. Design Electrical Rating (Net MWe):
854.7
- 6. Masimum Dependable Capacity (Gross MWe):
- 7. Masiman Dependable Capacity (Net MWe):
813 7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A (Net MWe):
N/A
- 9. Power Lesel To Which Restricted.if Any/A N
- 10. Reawns For Restrictions.lf Any:
/
This Month Yr..to.Date Cumulatise 672 1,416 13,897
- 11. Ilours In Reporting Period
- 12. Number Of flours Reactor Was Critical 672 1,416 12,200.5
- 13. Reactor Resene Shutdown flours 0
0 138.4
- 14. Ilours Generator On.Line 672 1,416 12,018.4
- 15. Unit Rewne Shutdown llours 0
0 0
- 16. Grms Thermal Energy Generated (MWil) 1.778.710 3.745.905 29.167.719 17 Gross Electrical Energy Generated (MWil) 569.916 1,201,652 9.874,886
- 18. Net Electrical Energy Generated (MWil) 542,812 1,144,366 9,360,416
- 19. Unit Senice Factor 100.0 100.0 86.5
- 20. Unit Asailability Factor 100.0 100.0 86.5
- 21. Unit Capacity Factor IUsing MDC Net) 99.3 99.3 82.8
- 22. Unit Capacity Factor (Using DER Net) 97.4 97.5 81.2
- 23. Unit forced Outage Rate 0.0 0.0 6.8
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date,and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed p
INITIAL CRITICALITY 5/06/81 5/08/81
\\
INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIA L OPER ATION 8/01/81 7/30/81 f304150311 830311 gnf773 PDR ADOCK 05000364 R
s
- 1. v...,
)
DOC):L '
50-364 I
UNIT 2
3/02/83 DATI COMPLETED BY W. G. Hairston, III IILEPl!ONE (205) 899-5156 i
1 l
FEBRUARY SIONT11 i
DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (MWe Net)
(SIWE Net) 801 810 g7 2
809 gg 810 796 3
810 39 812 806 4
79 805 810 21 3
1 805 6
803 22 812 808
]
7 3
809 813 24 g
9 813 25-810 10 810 26 797 11 798 27 809 807 12 812
- 3 13 811 29 14 811 30 p
15 812 33 16 809 INSTRUCIlONS On this fonnst. list the avenge daily umt power levelin MWe Net for each d:y in the reporting inunth. Compute to
, the nesse:t whole nc;2 wait.
)
(9(77) 4 O
4 i
1
~
-- +. a w.,
e n,
r).
~
x._/
N.
y/
UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAhlE
.1.M. Farlev-Unit 2 DATE 3/02/83 REPORT Af 0NDI FEBRUARY CO51PLETED UY W.G.Hairston,III TELEPilONE (205)899-5156 3
c re 3 sa :
B
.2 e 8
ysM Licensee c r.
c.
Cause 1 Corrective a
E.3 Action to No.
Date g
3g
,3 g 5 Event n?
5 jig Repor #
NC Prevent Recurrence d
There were no unit shutdowns or sig 11fican ; power reduct; ons iri the clonth of February.
i 2
3 4
F: Forced Reason:
hiethod:
Exhibit G - Instructions s
S: Ssheduled A-Equipment Failure (Explain) 14tanual for Preparation of Data B4taintenance of Test 24f anual Scram.
Entry Sheets for Licensee C.Refuelmg 3 Autunutic Scram.
Event ReporI (1.ER) File INUREG-l D.Regulatosy Restriction 4 Other (Explain) 0161)
E-Operator Training & license Examination F Administrative 5
G Opeutional Leror (Explain)
Eslobit I - Same Sonice (9/77) 11 Othes (lixplain)