Telecopy AO 74-9:on 740918,defective Turbine Bearing Found. Cause Under Investigation.Corrective Action Not Determined
ML20086J459
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/19/1974
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086J448 List:
References
AO-74-9, NUDOCS 8401230700
Download: ML20086J459 (1)


Text

- _

J.) OFT CO.WOIA Pr- h Bottota Ato: sic Power Station Dalta, Psunsylven'm i

, 17314 b':S September 19, 1974 -

Mr. James P. O'Reilly, Director United States Atomic Energy Cocenission Directorate of Regulatory Operations , _ . ,

631 Park Avenue 1 King of Prussia, Pennsylvar ia 19406 Q[.  :

i,.cl p+, _l Subjec+: Abnortr.al Occurrence 24-Hour Notification .-

y . . . ... .

Confiruing W. T. Ullrich's phone conversation with Mr. Valt Baunack, A.E.C. y;; ' yj Region 1 Regulatory Operations Office on September 19, 1974. {gy t-

Reference:

License Number DPR-56 TY_ fy . c .

Technical Specification Reference 3.5.C f*Ph [

Report No.: 50-278-74-9 Report Date: Septe:nber 19, 1974 many_

Occurrence Date: September 18, 1974 Facility: Peach Bottom Atomic Power Station R.D. 1, Delta, Pennsylvania 17314 ..

Identification of Occurrence: ==gE Defective turbine bearing. A, '1 ? 5 -

4.g vg Conditions Prior to Occurrence:

Maintenance outage in progress. Reactor shutdown. .gg{f[

L P 3%

Description of Occurrence:

.h During a reactor shutdown operation, a small steam leak was noted coning from the 'rG rNf shaft seal of the HPCI turbine. During the investigation and repair of the shaft '

seal, the HPCI bearing was found to be defectivs. A score nark was also found '

on the shaft in the vicinity of the bearing.

Designation of Apparent Cause of Occurrence: -

Under investigation.

Analysis of Occurrence:

The HPCI system was sucessfully operated during the plant loss of power testing on 9/17/74. The defective bearing did not prevent the system from perforuing its design function. This occurrence, therefore, has minical safety significance.

Corrective Action:

Disassembly of the turbine is progressing. Final corrective action has not been datermined at thin time.

Failure Data.

None. 8401230700 740928 PDR S

ADOCK 05000278 PDR =

Very truly yours, f Nr8-.< '$