Telecopy AO 75-66:on 751006,RCIC Inboard Steam Supply Isolation Valve MO-3-13-15 Failed to Close.Cause Under Investigation.Corrective Action to Be Determined After Investigation
ML20086H101
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/07/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H099 List:
References
AO-75-66, NUDOCS 8401130427
Download: ML20086H101 (1)


Text

- - -

,o

'I t

'e i

s..

j E

.~.

PHILADELPHIA ELECTRIC COMPANY

^

. Peach Botton Atomic Power Station Delta. Pennsylvani.a 1731h October 7, 1975

, Hr. James P.'

O'Reilly, Director

=

.Cfficu of Inspection and Enforcement

.4/.A4SL Region 1 United States Euclear Regulatory Cor_=insion hgk 631 Park Avenue.

-King of Prussia. Pennsylvania 19h06 s

,3 S_u bj e c t :

Ahnor=al occurrence '2 L -!! o u r Notification

~ Confirming R.

S.

Fleicch= ann.'s phone conversation with Mr. Walt Baunack..

Region 1 United Stntes nuclear Begulatory Concission on October 7, 1975

Reference:

License Hucher DPB-56 Technical Specification Referenca:

3.7.D

' Report No.:

50-278-75-66

. Report Date:

October 7, 1975 Occurrence Date:

Octouer 6, 1975.

i j

' Facility:

Peach Botton Atomic Power Station

[

R.

D.

1 Delte, Pennsylvania 17314-,

Ide'ntification of Ocourrence:

,s The RCIC Inboard Steas Supply Isolation valve (MO-3-13-15) failed to close.

t Conditions Prior to Occurrence:

}

575 power.

. Description of Occurrence:

j During the perfornance of a surveillance test, the valve failed to close from the control switch.

The valve vas closed by =anually actuating the elece contactor f.or the valve at the motor control s

center.

The vklve was,then successfully strokei frem the control switch.

The failure was not repeatchie.

Y

' Designation of Apparent Cause e.f Occurrenge:

Under investigation.

  • tAnalysis of Occurrence:

i The safety i=plications of this' occurrence are -ininal because the valve was closed by sanun,11y actuating the close contactor.

Becacce the valve was then succeccrully stroked from the control room, it van 8,

not ceclared incperable.Further, the ontboard isolation valve j

XO-3-13-16 was opernble to perfern an isolation, if required.

' Corrective Action:

To be deternined after. investigation.

I i

,iPailure Data:

Abnornal Occurrence Report 50-278-75-57 l

I 'Very truly s,

Mc /

l W.

T.

Ullrich, Superintendent l

' Peach Botten Atc=ie Power statica l