ML20086F874
| ML20086F874 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/18/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086F878 | List: |
| References | |
| AO-75-75, NUDOCS 8401090618 | |
| Download: ML20086F874 (1) | |
Text
i O
Peach AtomicPoy~9[a Bottom Station l
Delta, Pennsylve -
i s
1731h November 18, 1975 g
Olu>I.b Mr. Jam'es P.
O'Reilly, Director Office of Inspection and Enforcement Region 1 United States Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19h06 o
Subject:
Abnormal Occurrence 2h-Hour Notification Confirming R.
S.
Fleischmann's verbal conversation with Mr. Walt Baunack, Region 1, United States Nuclear Regulatory Commission on November 18,1975
Reference:
License Number DPR-hh Technical Specification
Reference:
4.ll.D.1 R'eport No.:
50-277-75-75 Report Date:
November 18, 1975 Occurrence Date:
Novenber 17, 1975 Facility:
Peach Botton Atomic Power Station R.D.
1, Delta, Pennsylvania 17314 Identification of Occurrence:
Inoperable hydraulic snubbers.
Conditions Prior to Occurrence:
Reactor shutdown.
DescripLion of Occurrenec:
A routine inspection of Unit 2 outside dryvell snubbers identified the following snubbers to have empty reservoirs:
10-GB-S-55 RER Discharge,to Torus 23-DEN-S-h HPCI Steam Line Designation of Apparent Cause of Occurrence:
Under investigation.
1 Analysis of Occurrence:
Preliminary inspection indicated no damage of piping or supports.
Safety implications are, therefore, minimal.
Corrective Action:
i To be determined after investigation.
Failure Data:
50-277-75-70, 50-277-75-46, 50-277-74 h5, 50-278-Th-34, 50-278-74-16 and 50-278-74-8.
8 Very truly yours,
/$0/5
=
W.
T.
Ullrich, Superintendent Peach Botton Atomic Power Station arr 8401090618 751126 I
s
{DRADOCK 05000277
' f,7-('50 PDR j
.