Telecopy AO 75-65:on 751015,setpoint on Reactor High Pressure Scram Switches Found to Be Less Conservative than Specified by Tech Specs.Caused by Instrument Setpoint Shift. Channel D Switch Recalibr,Tested & Returned to Svc
ML20086F970
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/16/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086F969 List:
References
AO-75-65, NUDOCS 8401090737
Download: ML20086F970 (1)


Text

_

g I

9 w.

f

=

g PHILADELPHIA ELECTRIC COMPANY!

Peach Botton Atocic Power Station

' Delta, Pennsylvania 17314 october 16. 1975 fr. James P.

O'Ecilly, Director

.ffice of Inspection and Enforcement A

'egion 1 jnited States Nucletar Regulatory Commission hg d44/)M.

31 Park Avenue fing of Prun nJ a, Penns91vania 19406 j J b.* e c t :

Abnor=al Occurrence PL-Hour Nr;ti fi c at ion-

on f $ r=ing h*.
7. Ullrich's phone ecuverectdon with Id?. Walt Dennack,

'egion 1 United States Nuclear Regulatory Commission on October 15, 1975.

'oference:

License Nunber*DPR-kh Technical Specification

Reference:

_T a b_l e_.,3.1.1.

8 e P o r t. N e.. :

30-tY?-YS-65

'~

S eport Dhle:

vc.ouer 16, 1977

ecurrence'Date:

Octater 15, 1975 iscility:

Peach Bottom At omic PoiEr ' Station R.D.

1, Delta, Pennsylvania 1731h

!dentification of Occurrence:

Setpoints on the reactor high pressure scram switches were.fo.und to be less ec'nservative than that specified by the Technical Specifications (PS-2-2-3-55 D,C and D).

.onditions Prior to Occurrence:

j Unit 2 at 56% pcuer.

.escription of Occurrence:

During routine instru=ent surveillance testing the "D"

reactor high i

pressurc sertz svitch setpoint was found to be 9 PSIG greater than that specified by the Technical Specifications.

Subsequent testing of the other three switches revealed that channel "B" vas 4 PSIG high, Channel "C" was 2 PSIG high, and channel "A" was within specifications.

esignation of Apparent Cause of Occurrence

4 The reason for the apparent' setpoint shift is still under investigation.

(

fnalysis of Occurrence:

Since the,setpoint shift vac slight (maximum shift of 9 PSIG at a setpoint l

of 1055 PSIG) 'and all svitches menitoring the reactor pressure were verified to be operational, this occurrence has minimal safety implientions..

orrective Action

The channel "D" switch was im=ediately recalibrated, tested and returned to' service.

The testing of the re=aining channels of high precsure scran logic vas initiated, at which time, the other out of speci fication switches were discovered.

These switches were then recalibrated, tested, and l

returned to service.

r railure Data.

One previous failure of this type reported in September 1973.

~ery truly yours, 1

,5575')0?dW.L.EC U.

T.

Ullrich, Superintendent Peach Bott'n Atocie Power Station o

8401090737 751024 DR ADOCK 050002 4