g PHILADELPHIA ELECTRIC COMPANY!
Peach Botton Atocic Power Station
' Delta, Pennsylvania 17314 october 16. 1975 fr. James P.
O'Ecilly, Director
.ffice of Inspection and Enforcement A
'egion 1 jnited States Nucletar Regulatory Commission hg d44/)M.
- 31 Park Avenue fing of Prun nJ a, Penns91vania 19406 j J b.* e c t :
Abnor=al Occurrence PL-Hour Nr;ti fi c at ion-
- on f $ r=ing h*.
- 7. Ullrich's phone ecuverectdon with Id?. Walt Dennack,
'egion 1 United States Nuclear Regulatory Commission on October 15, 1975.
'oference:
License Nunber*DPR-kh Technical Specification
Reference:
_T a b_l e_.,3.1.1.
8 e P o r t. N e.. :
30-tY?-YS-65
'~
S eport Dhle:
vc.ouer 16, 1977
- ecurrence'Date:
Octater 15, 1975 iscility:
Peach Bottom At omic PoiEr ' Station R.D.
1, Delta, Pennsylvania 1731h
!dentification of Occurrence:
Setpoints on the reactor high pressure scram switches were.fo.und to be less ec'nservative than that specified by the Technical Specifications (PS-2-2-3-55 D,C and D).
.onditions Prior to Occurrence:
j Unit 2 at 56% pcuer.
.escription of Occurrence:
During routine instru=ent surveillance testing the "D"
reactor high i
pressurc sertz svitch setpoint was found to be 9 PSIG greater than that specified by the Technical Specifications.
Subsequent testing of the other three switches revealed that channel "B" vas 4 PSIG high, Channel "C" was 2 PSIG high, and channel "A" was within specifications.
- esignation of Apparent Cause of Occurrence
4 The reason for the apparent' setpoint shift is still under investigation.
(
fnalysis of Occurrence:
Since the,setpoint shift vac slight (maximum shift of 9 PSIG at a setpoint l
of 1055 PSIG) 'and all svitches menitoring the reactor pressure were verified to be operational, this occurrence has minimal safety implientions..
- orrective Action
The channel "D" switch was im=ediately recalibrated, tested and returned to' service.
The testing of the re=aining channels of high precsure scran logic vas initiated, at which time, the other out of speci fication switches were discovered.
These switches were then recalibrated, tested, and l
returned to service.
r railure Data.
One previous failure of this type reported in September 1973.
~ery truly yours, 1
,5575')0?dW.L.EC U.
T.
Ullrich, Superintendent Peach Bott'n Atocie Power Station o