ML20155H772

From kanterella
Jump to navigation Jump to search
Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13
ML20155H772
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/12/1998
From: Carmody J, Giancatarino A, Tusar J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20155H770 List:
References
PECO-COLR-P2C13, PECO-COLR-P2C13-R01, PECO-COLR-P2C13-R1, NUDOCS 9811100278
Download: ML20155H772 (21)


Text

. -

4

'.. PECO Energy Fuel and Sennees Division PECO-COLR-P2C13

. l P2013 Core Operating Urnits Report Page 1, Rev.1 1

I l

CORE OPERATING LIMITS REPORT FOR l l

PEACH BOTTOM ATOMIC POWER STATION UNIT 2 RELOAD 12, CYCLE 13 REVISION 1

.]

l Prepared By:

" ~

do-o ate: # - [' 7 /

A.p/. Giancatarino Engineer Reviewed By: y Date: /o -n-f r

! Engineer Approved B 'k M Date: 'MzMr J. M. Carmodk Manager Nuclear Design Branch 9811100278 DR 981105 ~

ADOCK 05000277 PDR

9

.. . MCO Energy Fueland Services DMelon PECO-COG-P2C13 l P2013 Core Operating Umits Report Page 2, Rev.1 1

LIST OF EFFECTIVE PAGES 1

1 Page(s) Revision  ;

1 l 1 - 21 1

l l ' .. . PECO Energy FuelandServloes DMelon

! PECO COLR P2C13 l P2013CoreOperatngUmitsReport Page 3, Rev.1 f

I INTRODUCTION AND

SUMMARY

This report provides the following cycle-specific parameter limits for Peach Bottom Atomic Power Station Unit 2 Cycle 13 (Reload 12): )

e Maximum Average Planar Linear Heat Generation Rate (MAPLHGR)

ARTS MAPLHGR thermallimit multipliers Single Loop Operation (SLO) MAPLHGR multipliers l Minimum Critical Power Ratio (MCPR)

ARTS MCPR thermal limit adjustments and multipliers Single Loop Operation (SLO) MCPR adjustment Rod Block Monitor (RBM) Analytical Limits, Allowable Values and MCPR Limits I Linear Heat Generation Rate (LHGR) l

. Turbine Bypass Valve Parameters Thrse values have been determined using NRC-approved methodology and are established such that all applicable limits of the plant safety analysis are met.

This report provides the means for calculating the Operating Limit MCPR and MAPLHGR thermallimits for th3 following conditions:

All points in the operating region of the power / flow map including Maximum Extended Load Line Limit (MELLL) down to 81% of rated core flow during full power (3458 MWt) operation

. Increased Core Flow (ICF), up to 110% of rated core flow End-of-Cycle Power Coastdown to a minimum power level of 40%

Feedwater Heaters Out of Service (FWHOOS) to 55 F temperature reduction Final Feedwater Temperature Reduction (FWTR) between End-of-Rated (EOR) and End-of-Cycle (EOC) to 90* F temperature reduction The Allowable Values, documented in Reference 17, for feedwater temperature as a function of thermal p:wer for both FWHOOS and FWTR are specified in the appropriate Peach Bottom procedures.

N:te that the term " EOR" refers to the cycle exposure at which operation at " rated conditions"is no longer possible (i.e., the cycle exposure at which cycle extension begins) based on the EOR point as documented in the current revision of the Cycle Management Report.

l Preparation of this report was performed in accordance with PECO Energy Fuel and Services Division Pracedure FM 300, " Reload Core Licensing". This report is submitted in accordance with Technical

!' Sp cification 5.6.5 of Reference (1) and contains all thermallimit parameters related to the implementation of tha ARTS Improvement Program and Maximum Extended Load Line Limit Analyses (ARTS /MELLLA) for Peach Bottom Unit 2 Cycle 13.

. , PECO Energy Fuel and Services DMsion PECO-COLR-P2013 l P2C13 Core Operating umits Report Page 4, Rev.1 MAPLHGR LIMITS The bounding MAPLHGR limits (kW/ft) for each fuel type are provided in Figures 1 through 5. The bounding MAPLHGR limits are the lowest kW/ft limits of the fuel lattices (excluding natural uranium) which comprise a given fuel type as a function of average planar exposure. The MAPLHGR figures are used when hand calculations are required as specified in Reference (4). All MAPLHGR values for each fuel type as a functior.

of axiallocation and average planar exposure shall be less than or equal to the applicable MAPLHGR limits for the respective fuel and lattice types to be in compliance with Technical Specification 3.2.1. These MAPLHGR limits are specified in References (2), (3), (15) and (16) and the process computer databank. The ARTS-based MAPLHGR power-dependent multipliers (MAPFAC(P)) are provided in Figures 6 and 7. Figure 6 is valid for seven or more (of nine) Turbine Bypass Valves (TBVs) In-Service and Recirculation Pump Trip (RPT) in-Service with a maximum temperature reduction of 90' F for FWTR operation. Figure 7 is valid for three or more (of nine) TBVs Out-of-Service (OOS) or RPTOOS with a maximum FWTR of 90' F. The flow-dependent multipliers (MAPFAC(F)) are provided in Figures 8 and 9 as a function of the number of recirculation loops in operation only. The SLO MAPLHGR multiplier (0.87) is applied through MAPFAC(F) as shown in Figure 9. MAPFAC(F)is clamped at 0.87 starting at 54.55% of rated core flow to ensure peak clad temperatures are maintained within the limits of the cycle-specific LOCA analysis for single recirculation loop operation. The power- and flow-dependent MAPLHGR multipliers were obtained from References (5), (11),

(17) and (18).

MCPR LIMITS The Operating Limit MCPR (OLMCPR) for use in Technical Specification 3.2.2 for each fuel type is provided in Table 1. These values are determined by the cycle-specific fuel reload analyses in Reference (2). The OLMCPR is increased by 0.02 when operating in SLO (due to the safety limit increase). The Safety Limit MCPRs are documented in Section 2.1.1.2 of Reference (1).

Control rod scram time verification is required as per Technical Specification 3.1.4, " Control Rod Scram Times". Tau, a measure of scram time performance to notch position 36 throughout the cycle, is determined based on the cumulative scram time test results. The calculation of Tau shall be performed in accordance with site procedures. Linear interpolation shall be used to calculate the OLMCPR value if Tau is between 0.0 (Tau Option B) and 1.0 (Tau Option A).

Separate MCPR values are presented herein (Table 1) for the following domains:

TBVs In Service (seven or more in-service) and RPT In-Service, maximum FWTa of 90 F

. TBVs Out-of-Service (three or more out-of-service) and RPT In-Service, maximum FWTR of 90 F TBVs In-Service (seven or more in-service) and RPT Out-of-Service, maximum FWTR of 90 F The OLMCPR values are documented in References (2) for the GE11 and GE13 fuel designs.

The ARTS-based power-dependent MCPR limits, OLMCPR(P), for use in Technical Specification 3.2.2 are provided in Figure 10. Figure 10 is valid for all operating conditions. The flow-dependent MCPR limits, OLMCPR(F), are provided in Figure 11. Figure 11 is valid for all operating conditions. The OLMCPR(P) values below the turbine scram bypass power are documented in Reference (17). OLMCPR(P, F) curves were obtained from References (5), (11), (17) and (18).

OVERALL GOVERNING MCPR AND MAPLHGR LIMITS ARTS provides for power- and flow-dependent thermal limit adjustments and multipliers which allow for a more reliable administration of the MCPR and MAPLHGR thermallimits. At any given power / flow (P/F) state.

l

(

.. . PECO Energy Fuel and Servlees DMelon PECO-COLR-P2C13 l P2C13CoreOperaungumnsReport Page 5, Rev.1 all four limits are to be determined: MAPFAC(P), MAPFAC(F), OLMCPR(P), and OLMCPR(F) from Figures 6 throogh 11, inclusive. The most limiting MCPR and the most limiting MAPLHGR [ maximum of OLMCPR(P) and OLMCPR(F) and minimum of MAPLHGR(P) and MAPLHGR(F)] for a given (P,F) condition will be the governing limits. The OLMCPR for each fuel type is determined by the cycle-specific fuel reload analyses in Reference (2). Rated MAPLHGR values are a composite of results obtained from bundle-specific thermal-m@chanical and emergency core cooling system analyses. Supporting documentation for the ARTS-based limits is provided in References (5), (10), (11), (14), (17), and (18).

ROD BLOCK MONITOR SETPOINTS l The RBM power-biased Analytical Limits, Allowable Values and MCPR Limits for use in Technical '

Specification 3.3.2.1 are provided in Table 2 per Reference (5) with supporting documentation in References (2), (11), (12) and (13). '

LINEAR HEAT GENERATION RATES The beginning of life (maximum) LHGR values for each fuel type for use in Technical Specification 3.2.3 are provided in Table 3. The LHGR values as a function of fuel exposure are provided in Reference (3). The bases for the LHGR values are documented in Reference (4).

STEAM BYPASS SYSTEM OPERABILITY The operability requirements for the steam bypass system are govemed by Technical Specification 3.7.6. If the requirements cannot be met, the appropriate power dependent limits for Turbine Bypass Valves Out-of-Service (TBVOOS) must be used (Table 1 with Figure 7). - The minimum number of bypass valves to maintain system operability is seven as per References (6; and (9) and Table 4. Table 4 also includes other Turbine Bypass Valve parameters.

EOC RECIRCULATION PUMP THIP ( EOC-RPT) OPERABILITY If the EOC-RPT is inoperable, then the OLMCPR (Table 1) and MAPFAC(P) limits (Figure 7) for EOC Recirculation Pump Trip Out-of-Service (RPTOOS), must be used.

The measured EOC-RPT response time as defined in Section 1.1 of the Technical Specifications shall be :

s 0.145 seconds for TGV Fast Closure Trip (i.e. Generator Load Rejection) s 0.155 seconds for TSV Fast Closure Trip ( i.e. Turbine Trip )

A total RPT response time of 0.175 seconds is assumed in the safety analysis for both trips and is defined as the time from the turbine valves (TCV or TSV) start to close until complete arc suppression of the EOC-RPT circuit breakers. Reference (19) provides the basis for the RPT response time.

I CONCURRENTTBVOOS AND RPTOOS Cycle 13 is not licensed for TBVOOS and RPTOOS to occur concurrently. Therefore, concurrent TBVOOS and RPTOOS is an unanalyzed condition.

l l

[

i

. . . =_.

' ..l PEC0EnergyFuelandServicesDMalon P2C13 Cors OperatigIJmits Report PECO cot.R-P2013 Page 6, Rev.1 REFERENCES

1) " Technical Specifications for Peach Bottom Atomic Power Station Unit 2", Docket No. 50-277, Appendix A to License No. DPR-44
2) " Supplemental Reload Licensing Report for Peach Bottom Atomic Power Station Unit 2, Reload 12, Cycle 13", GE Nuclear Energy Document No. J11-03306SRLR, Rev. O, August 1998
3) " Lattice Dependent MAPLHGR Report for Peach Bottom Atomic Power Station Unit 2 Reload 12 Cycle 13", J11-03306 MAPL, Revision 0, August,1998
4) " General Electric Standard Application for Reactor Fuel", NEDE-24011-P-A-13, August 1996; and NEDE-24011-P-A 13-US, August 1996
5) " Maximum Extended Load Line Limit and ARTS Improvement Program Analyses for Peach Bottom Atomic Power Station Unit 2 and 3", NEDC-32162P, Revision 2 March 1995
6) "Lovel 8 Analytical Limit increase Engineering Report for Peach Bottom 2 and 3", NEDC-32231P, August 1993
7) Letter, G. V. Kumar to H. J. Ryan, " Justification for Reduction of Rod. Block Monitor System Downscale Trip Setpoint For Peach Bottom Atomic Power Station", May 23,1994
8) " Letter from R. M. Butrovich to H. J. Diamond, " Peach Bottom-2 Cycle 12 Turbine Bypass Valve Capacity Variation from Design Basis", January 9,1995
9) Letter from G. V. Kumar to G. C. Storey, "PBAPS Evaluation of Turbine Bypass Surveillance Requirements", January 19,1995
10) Letter, G. V. Kumar to A. M. Olson, "PECO Rerate Project, ARTS Thermal Limits", June 27,1995
11) Peach Bottom Atomic Power Station Unit 2 Cycle 13 ARTS Thermal Limits Analyses, GE Nuclear Energy, Rev. O, August 1998
12) PECO Energy Calc. PM-0875, "GE NSSS Setpoints Required to Support Power Rerate"
13) Letter from M. G. Wiwel to A. S. Hegedus and R. C. Stott, " Rod Block Monitor Downscale Settings for ITS", March 14,1995
14) " Peach Bottom Atomic Power Station Unit 2 Cycle 12 ARTS Thermal Limits Analyses", NEDC-32706P, Revision 0, April 1997
15) " Lattice Dependent MAPLHGR Report for Peach Bottom Atomic Power Station Unit 2 Reload 10 Cycle 11",24A5154AA, Revision 0, September,1994
16) " Lattice Dependent MAPLHGR Report for Peach Bottom Atomic Power Station Unit 2 Reload 11 Cycle 12",24A5366AA, Revision 0, September,1996

! 17) " Peach Bottom Atomic Power Station Evaluation for Extended Final Feedwater Temperature Reduction of 90* F", NEDC-32707P, Supplement 1, May 20,1998

18) " ARTS Flow-Dependent Limits with TBVOOS for Peach Bottom Atomic Power Station and Limerick Generating Station", NEDC-32847P, June 1998
19) PECO Calculation PE-0173, " Determination of Total Time Required to Initiate the trip Signal to the EOC-RPT Circuit Breaker"

.. . PEC6 Energy Fuel and Services DMelon PECO-C0lR-P2013 l P2C13 Core Operating Umits Report Page 7, Rev.1 j FIGURE 1 MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) VERSUS l AVERAGE PLANAR EXPOSURE FUEL TYPE P9 HUB 387-12GZ3 (GE11) 14.00 THIS FIGURE IS REFERRED TO BY 12.00 -- TECHNICAL SPECIFICATION 3.2.1 10.00 - -

n ,

$ 5 8.00 --

3 N

h 6.00 --

t 2 '

4.00 - ,

O+ ,

2.00 -- '

ja 0.00 0.0 10.0 20.0 30.0 40.0 50.0 60.0 Average Planar Exposure, GWd/ST Avg Plan Avg Plan Avg Plan Exposure MAPLHGR Exposure MAPLHGR Exposure MAPLHGR (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) 0.0 11.13 7.0 12.15 25.0 11.01 0.2 11.18 8.0 12.30 30.0 10.29 1.0 11.28 9.0 12.44 35.0 9.59 2.0 11.42 10.0 12.58 40.0 8.90 3.0 11.56 12.5 12.66 45.0 8.22 4.0 11.70 15.0 12.42 50.0 7.54 5.0 11.86 17.5 12.10 55.0 6.85 6.0 12.01 20.0 11.74 57.85 6.45

.. . PEC6 Energy Fueland Services DMalon PECO COLR-P2C13 l P2013 Core Operating Umits Report Page 8, Rev.1 FIGURE 2 MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) VERSUS AVERAGE PLANAR EXPOSURE FUEL TYPE P9DTB397-13GZ (GE13) 14.00 12.00 -- THIS FIGURE IS REFERRED TO BY TECHNICAL SPECIFICATION 3.2.1 10.00 --

E g 8.00 - ^ x 5 6.00 -- "

=

4.00 --

2.00 -

0.00

  • 0.0 10.0 20.0 30.0 40.0 50.0 60.0 Average Planar Exposure, GWd/ST Avg Plan Avg Plan Avg Plan Exposure MAPLHGR Exposure MAPLHGR Exposure MAPLHGR (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) 0.0 10.89 7.0 12.10 25.0 11.17 0.2 10.91 8.0 12.23 30.0 10.44 1.0 10.99 9.0 12.37 35.0 9.73 2.0 11.12 10.0 12.52 40.0 9.03 .

3.0 11.29 12.5 12.61 45.0 8.34 4.0 11.47 15.0 12.51 50.0 7.65 5.0 11.67 17.5 12.24 55.0 6.95 6.0 11.89 20.0 11.90 58.22 6.49

.. . PEdoErstgyFuelandSeMoesDMsion PECO COL.R-P2013 l P2013 Core Operating Umits Report Page 9, Rev.1 FIGURE 3 MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) VERSUS AVERAGE PLANAR EXPOSURE FUEL TYPE P9DTB39215GZ (GE13) 14.00 THIS FIGURE IS REFERRED TO BY 12.00 --

~

4 34 TECHNICAL SPECIFICATION 3.2.1 l

l 10.00 --

  1. {

l

.d 8.00 -

5 .

5 S oo --

2 4.00 --

2.00 -

0.00 '

l 0.0 10.0 20.0 30.0 40.0 50.0 60.0 Average Planar Exposure, GWd/ST Avg Plan Avg Plan Avg Plan Exposure MAPLHGR Exposure MAPLHGR Exposure MAPLHGR (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) 0.0 10.64 7.0 11.69 25.0 11.06 0.2 10.69 8.0 11.86 30.0 10.34 1.0 10.80 9.0 12.03 35.0 9.64 2.0 10.93 10.0 12.21 40.0 8.94 3.0 11.07 12.5 12.33 45.0 8.26 4.0 11.22 15.0 12.33 50.0 7.57 5.0 11.37 17.5 12.11 55.0 6.88 6.0 11.53 20.0 11.78 57.88 6.48

.. . PECO Energy Fuel and Services DMalon I PECO-COLR-P2C13 l P2013 Core Operating Umits Report Page 10, Rev.1 l l

FIGURE 4 l

MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) VERSUS AVERAGE PLANAR EXPOSURE FUEL TYPE P9DTB406-12GZ (GE13) l 14 00 l THIS FIGURE IS REFERRED TO BY I 12.00 -- -

TECHNICAL SPECIFICATION 3.2.1 l 10.00 -- '

E

i 8.00 --

b 5

3 c.

6.00 --

l l 2.00 -

0.00  :  : ,

OO 10.0 20.0 30.0 40.0 50.0 60.0 l Average Planar Exposure, GWd/ST l Avg Plan Avg Plan Avg Plan Exposure MAPLHGR Exposure MAPLHGR Exposure MAPLHGR (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) 0.0 10.67 7.0 11.72 25.0 10.89 O.2 10.72 8.0 11.83 30.0 10.28 1.0 10.82 9.0 11.92 35.0 9.67 2.0 10.96 10.0 12.01 40.0 9.06 3.0 11.11 12.5 11.95 45.0 8.42 4.0 11.27 15.0 11.86 50.0 7.75

,' 5.0 11.43 17.5 11.74 55.0 7.05 6.0 11.60 20.0 11.50 57.58 6.67

4

. . PECO Energy Fuel and Servl0es DMalon PECO-COLR P2013 l P2013CoreOperetngumitsReport Page 11, Rev.1 FIGURE 5 MAXIMUM AVERAGE PLANAR LINEAR HEAT GENERATION RATE (MAPLHGR) VERSUS AVERAGE PLANAR EXPOSURE FUEL TYP:E P9DTB409-13GZ (GE13) 14.00 I

s c:) p;-

THIS FIGURE IS REFERRED TO BY 12.00 - s Ni TECHNICAL SPECIFICATION 3.2.1 ji s:x .-

O

'0 00 ~

l l

F \% l

! dj.; * '

g B.00 -- ,

+

5 5 6.00 --

g <

2 '

4.00 -

l l

2.00 -

0.00 Y ' '

O.0 10.0 20.0 30.0 40.0 50.0 60.0 Average Planar Exposure, GW&ST Avg Plan Avg Plan Avg Plan Exposure MAPLHGR Exposure MAPLHGR Exposure MAPLHGR (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) (GWd/ST) (kW/ft) 0.0 10.38 7.0 11.16 25.0 10.78 l 0.2 10.42 8.0 11.34 30.0 10.21 1.0 10.48 9.0 11.54 35.0 9.62 2.0 10.57 10.0 11.73 40.0 9.01 3.0 10.67 12.5 11.80 45.0 8.37 4.0 10.77 15.0 11.80 50.0 7.69 5.0 10.88 17.5 11.63 55.0 6.96 6.0 11.00 20.0 11.35 56.99 6.67

l i

. Pedo Ermy Fueland Servloes DMelon I PECO. Col.R-P2013 l P2013CoreOperetngUmitsReport Page 12, Flev. I l

l FIGURE 6  ;

1 POWER DEPENDENT MAPLHGR MULTIPLIER, MAPFAC(P)

THIS FIGURE IS REFERRED TO BY TECHNICAL SPECIFICATION 3.2.1 VALID FOR 7 OR MORE TBVs IN-SERVICE, RPT IN-SERVICE AND MAX 90 F FWTR 1.1 0.989 1.00 1.0 --

gi 0.9 - -

0.8 -- 0.817 l

l 0.7 -- l l

s 60% Flow  :

, 0.6 -- l E

0 l

l 4 .

k 0.5 --

O.511 g -

l 0.451l l 0.418 0.4 --

0.388 l MAPLHGR(P) - MAPF AC(P)

0.3 - - No Thermal Limits Monitoring Required

> 60% Flow {  ! No Limits Specified l l l For 25% s P< 30% MAPFAC(P) - 0.511 + 0.012(P 30%)

,,, ,,  ;  ; For s 60% Core Flow l l MAPFAC(P) = 0.418 + 0.006(P 30%)

j j For > 60% Core Flow j { For 30% s P < 65%: M APF AC(P) - 0.989 + 0.004914(P 65%)

0.1 -- l l For 65% s P < 95%: MAPFAC(P) = 1.00 + 0.000367(P 95%)

{ j For 95% s P: MAPFAC(P) = 1.00 0.0 0 10 20 30 40 50 60 70 80 90 100 Power (% Rated)

. PEUO EnergyFueland Serviss DMelon PECO cot.R-P2013 l P2013 Core Operating 1.imits Report Page 13, Rev.1 FIGURE 7 POWER DEPENDENT MAPLHGR MULTIPLIER, MAPFAC(P)

THIS FIGURE IS REFERRED TO BY TECHNICAL SPECIFICATION 3.2.1 VALID FOR 3 OR MORE TBVOOS OR F. dOOS AND MAX 90 F FWTR 1.1 -

J 1.0 -- 1.00 3

1.00 L

0.954 0.9 --

0.8 -- 0.778 l

l 0.7 -- l l

$ SO% Flow  !

0.6 -- j

- l 9:. l O 0.511 g 0.5 -- .

s 2 0.451,  !

f l

, 'O.418 0.4 --

0.388 j MAPLHGR(P)- MAPFAC(P)

MAPLHGRstd = Standard MAFLHGR Limits l l l l For 25% > P : No Thermal Limits Monitoring Required 0.3 ** > 60% Flow j l No Limits Specified

! For 25% s P< 30% : MAPFAC(P) = 0.511 + 0.012(P 30%)

l l For s 60% Core Flow 0.2 --  !  ! MAPFAC(P) = 0.418 + 0.006(P 30%)

l l For > 60% Core Flow l l l l For 30% s P < 85%: M AP F AC(P) - 0.954 + 0.00320(P -

0.1 . . j j 85%)

l l For 85% s P < 95%: M APFAC(P) - 1.00 + 0.00460(P - 95%)

{ j For 95% 5 P: MAPFAC(P) - 1.00 l l 0.0 O 10 20 30 40 50 60 '

70 80 90 100 Power (% Rated)

. = -- - .- , . . . . _ - .

. PEDO Enery Fueland Servloes DMelon PECO COLR-P2013 l l P2C13CoreOperatngumitsReport Page 14, Rev.1 FIGURE 8 l

FLOW-DEPENDENT MAPLHGR MULTIPLIER, MAPFAC(F)

THIS FIGURE IS REFERRED TO BY TECHNICAL SPECIFICATION 3.2.1 VALID FOR 2 LOOP RECIRC FLOW 1.0 --

0.9 --

0.8 --

0.7 --

0.6 --

C MAPLHGR(F)- MAPFAC(F)

  • MAPLHGR(std) 6 g0.5-- For Two Loop Operation, > 70% W T
n. MAPF4C(F)- The Minimum of EITHER 1.0 y OR {0.0268 x (Wr -70)/10 + 0.9732) 0.4 -- For Two Loop Operation, s 70% Wr MAPFAC(F)- {0.6682 x (Wr/100)+ 0.5055)

Wr- % Rated Core Flow 0.3 --

0.2 --

0.1 --

l 0.0 l l l l l l l l l l 10 20 30 40 50 60 70 80 90 100 110 CORE FLOW (% RATED)

- PECD EnergyFueland SeMoos DMelon

' PECO COLR-P2013 l P2C13CoreOpersingumitsReport Page 15, Rev.1 i

l ,

FIGURE 9 FLOW DEPENDENT MAPLHGR MULTIPLIER, MAPFAC(F) {

THIS FIGURE IS REFERRED TO BY TECHNICAL SPECIFICATION 3.2.1 AND 3.4.1 VALID FOR SINGLE LOOP RECIRC FLOW l

l 1.0 --

0.9 --

0.8 - I i

0.7 --

0.6 --

g0.5-I MAPLHGR(F) - MAPFAC(F)

where, 0.3 -- Wr - % Rated Core Flow Af - 0.6682, Bf 0.5055 0.2 --

0.1 --

t 0.0 ' '

l

! 10 20 30 40 50 60 70 80 90 100 110 CORE FLOW (% RATED)

- . Pedo Enugy Fueland Servloes DMelon PECO COLA P2C13 l P2C13CoreOperstngUmleReput Page 16, Rev.1 4

TABLE 1 OPERATING LIMIT MINIMUM CRITICAL POWER RATIO (OLMCPR)

Applicable to all fuel types Use in conjunction with Figures 10 and 11

< l l

Add 0.02 to the OLMCPR when in Single Loop Operation '

i These Tables are referred to by Technical Specification 3.2.2,3.4.1 and 3.7.6 l

l TBV in Service and TBV out of Service RPT Out of Service RPTin Service (3 or rnore TBVOOS)

OPT. B OPT. A OPT. B OPT. A OPT. B OPT. A (T=0) (T=1) (T-0) (T=f) (T-0) (T=1)

BOC to EOR - 2000 1.30 1.35 1.38 1.41 1.38 1.46 mwd /ST 1 EOR - 2000 mwd /ST to 1.33 1.36 1.38 1.41 1.38 1.46 i EOC 4

NOTES:

1) When Tau does not equal 0 or 1, use linear interpolation.

i i

1 i

_ . . _. ..~ . _ - . .. -_. . ~ . . . . - - , . . - . .

PEdoEnergyFueland SeM0es DMelon PECO.COLR-P2013 l P2013CoreOperadnDUmitsReport Page 17, Rev.1 FIGURE 10 POWER = DEPENDENT MCPR LIMIT, OLMCPR(P)

THIS FIGURE IS REFERRED TO BY TECHNICAL SPECIFICATION 3.2.2 VALID FOR ALL CONDITIONS 1

3.25 3.2 --  ;

OPER ATING LIMIT MCPR(P) = Kp

  • OPER ATING LIMIT MCPR(100) 3.0 l FOR P<25% : NO THERM AL LIMITS MONITORING REQUIRED

> 60% Flow NO LIMITS SPECIFIED 2*91 FOR 25% SP < P(Bypass): (P(Bypass)=30%)

2*8 -- l l K(Byp) = 2 26 + 0104(30% + P) FOR s 60% CORE FLOW 2.76 i

l K(Dyp) = 2 91 + 0 068(30% - P) FOR > 60% CORE FLOW '

TOR 30% s P < 65% : Kp = 1.130 + 0.00534(65% - P) ,

l  !

2.6 - -

! .l FOR 65% $ P c 65% : Kp = 1056 + 0.00370(85% . P)

, , l FOR 85% s P : Kp = 100 + 0 00307(100% . P)

!E  :  :

g . .

@ 2.4 --

3 s60% Flow /

a

  • O j 2.26 2.2 --  !  !

ABSOLUTE  !  !

2.0

  • M U LTIPLIE R j 1.8 -

l l

n. l l n

. ~ ,

.1 i i Ti  :  :

h 1.4 - -

j  !

2 * *

,337 i

g .

n.  :

o . .

3 I 1.2 --  !  !

] l l 1.130 I l 1.056

!  ! 1.046 1.00 1.0 0 10 20 30 40 50 60 70 80 90 100 l Power (% Rated)

. ped 0'Energ Fuel and Services DMelon PECO COLR-P2013 l P2013 Core Operating LJmits Report Page 18, Rev.1

, FIGURE 11 FLOW-DEPENDENT MCPR LIMITS, OLMCPR(F)

THIS FIGURE IS REFERRED TO BY TECHNICAL SPECIFICATION 3.2.2 AND 3.4.1 VALID FOR ALL CONDITIONS 1.56 For Two Loop Operation, SLMCPR s 1.12. a 40% WT MCPR(F) = The Maximum of EITHER 1.25 1.a 0 I OR { -0.5784 x (Wr/100)+ 1.7073)

For Two Loop Operation, SLMCPR s1.12, < 40% WT MCPR(F) = { 0.5784 x (Wr/100)+ 1.7073) x

{1 + 0.0032 x (40 Wr Wr= % Rated Core Flow 1.60 - 0 1.50 - 3 0 1.40 - 1.30 - 1.20 - 1.10 10 20 30 40 50 60 70 80 90 100 110 Core Flow (% Rated)

   - PECO Energy FW and W m PECO COLA P2013 l P2C13CoreOperatngUmbsRepet                                                                                  ggg, j TABLE 2 ROD BLOCK MONITOR ANALYTICAL LIMITS, ALLOWABLE VALUES, AND MCPR LIMITS                                                     ;

THIS TABLE IS REFERRED TO BY TECHNICAL SPECIFICATION 3.3.2.1 Applicability: BOC to EOC FUNCTION ANALYTICAL ALLOWABLE MCPR LIMIT (1) VALUE(1) LIMIT l l Low Power Range - Upscale s 120.0 % s 118.4 % < 1.70

  • Intermediate Power Range - Upscale s 115.2 % s 113.6 % < 1.70
  • i High Power Range - Upscale s 110.2 % s 108.6 % < 1.70 *
                                                                                                         < 1.40
  • Inop N/A N/A < 1.70 *
                                                                                                         < 1.40
  • Downscale 2 1.0% 2 2.5% < 1.70 *
                                                                                                         < 1.40
  • Bypass Time Delay * .... .... ....

(1) These Trip Level Settings (with RBM filter) are based on a cycle-specific rated RWE MCPR limit of 1.30 and are consistent with an RBM filter time constant between 0.1 and 0.55 seconds. (2) This is the MCPR limit (given THERMAL POWER 2 28.3% and < 90% RTP) below which the RBM is required to be OPERABLE (see COLR references 2 and 5 and TS Table 3.3.2.1-1). (3) This is the MCPR limit (given THERMAL POWER 2 90% RTP) below which the RBM is required to be OPERABLE (see COLR references 2 and 5 and TS Table 3.3.2.1-1). (4) This time delay option is currently not in use at Peach Bottom Unit 2 (see COLR reference 5).

   .   . PECO Energy Fuel and Services DMelon PECO-COLR-P2C13 l P2C13CoreOperetngUmitsReport                                                                                     Page 20, Rev.1 TABLE 3 I

l DESIGN LINEAR HEAT GENERATION RATE (LHGR) LIMITS' i l l FUEL TYPE LHGR LIMIT l l l l GE11 14.4 kW/ft l GE13 14.4 kW/ft l l ' The LHGR limits provided above are the beginning of life (maximum) values. The LHGR limits as a function of fuel exposure are provided in Reference (3). I i i e i 1 L

i 4 4

          . PECO Enstgy Fuel and Services DMalon PECO COUI-P2C13 l P2C13 Core Opersing Limits Report

] Page 21, Rev.1 . TABLE 4 i a { TURBINE BYPASS VALVE PARAMETERS i i i l TURBINE BYPASS SYSTEM RESPONSE TIMES 4 i . Maximum delay time before start of bypass valve opening following generation of the turbine bypass valve flow 0.10 sec signal 4 i j Maximum time after generation of a turbine bypass valve flow signal for bypass valve position to reach 80% of full 0.30 sec.

flow (includes the abo"? delay time) l 4

l l

Minimum required number of bypass valves to maintain
system operability 7 l

i 5 e 4 i l eMdbwolep2c13 coir _rev1. doc r

                                                                                                , . - - -}}