1998 PBAPS Annual 10CFR72.48 Rept. with
ML20206D359
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/31/1998
From: Doering J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9905040065
Download: ML20206D359 (2)


Text

c .,

  • John Doering, Jr.

Vice President Peach Bonom Atomic Power Station y

p, . PECO NUCLEAR esco ceerov comoeev 1848 Lay Road A Unit of PECO Energy Delta, PA 17314-9032 717 456 4000 Fax 717 456 4243 E-mai rdoenngepeco energyeom April 20,1999 Docket Nos. 50-277 ,

50-278 License Nos. DPR-44 DPR-56 H. J. Miller, Administrator, Region I US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415

SUBJECT:

Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3 Annual 10 CFR 72.48 Report For The Period January 1,1998 through December 31,1998 Gentleman:

Enclosed is the 1998 Annual 10 CFR 72.48 Report as required by 10 CFR 72.48(b)(2). If you have any questions or require additionalinformation, please contact A. A. Winter at (717) 456-3598.

j/j Sincebrel ,

t w

y'n '

s/

' Jdhn Doering Jr. _

Vice President, '

~ Peach Bottom Atomic Power Station JD/ MEW /AAW/

l 7,gy A w l Attachment cc: R. R. Janati, Commonwealth of Pennsylvania C. J. Pepriello, Director, NMSS, NRC, Washington, DC R. l. McLean, State of Maryland A. C. McMurtray, US NRC, Senior Resident inspector A. F. Kirby ill, DelMarVa Power N. J. Sproul, Public Service Electric and Gas NRC Document Control Desk, Washington, DC CCN 99-14040 I .

9905040065 t81231 r PDR ADOCK 05000277 R PDR ,

. 1 1

T ' _. Docket Nos. 50-277 ,

50-278 '

l- j 1998 PEACH BOTTOM ATOMIC POWER STATION '

ANNUAL 10 CFR 72.48 REPORT j This report is issued pursuant to reporting requirements for Peach Bottom Atornic Power Station Units 2 and 3 (Facility License 1 Numbers DPR-44 and DPR-56 respectively). This report addresses changes, tests and experiments to the Interim Spont Fuel Storage  ;

installation facility and procedures as they are described in the i Peach Bottom Final Safety Analysis Report. This report consists of those changes, tests and experiments were implemented between January 1,1998 and December 31,1998.

i i

in response to this requirement, there were no changes, tests, 1 or experiments to ISFSI facility and procedures in 1998.

j 1

4 l

1 i

i i

>