Peach Bottom Atomic Power Statio.1
,Jo -
sy-PECO NUCLEAR nco u 1848 Lay Road c-v
'g IUnit of PECO Energy Delta, PA 17314 9032 717 456 7o14 December 4,1998 U.S. Nuclear Regulatory Commission ,
- Document Control Desk l Washington, D.C. 20555 ;
1 Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of l November 1998 forwarded pursuant to Technical Specification 5.6.4 under the guidance of l Regulatory Guide 10.1, Revision 4. ;
Sincerely, levy Y, Gordoh L. Johnston 1 Director, Site Engin ering l Peach Bottom Ato 'c Power Station GLJ/PJD/ RAM /JC:dmk tt %
Enclosures cc: N.J. Sprout, Public Service Electric & Gas
- R. R. Janat', Commonwealth of Pennsylvania R.I. McLean, State of Maryland H. J. Miller, Administrator, Region I, USNRC A.C. McMurtray, USNRC, Senior Resident inspector A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center l J. Doering, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station I (e-mail) l ccn 98-14091 9812210180 981130 ~
PDR ADOCK 05000277
!, R PDR -
l ar -, ,
. . - - - , . . . - . ~ . . . ~ . ~ - . . . _ . . - . - - - - - . - .. . . ~ _ . - . - - . . _ = - . - ._
i-i ,
, .f
- s l
l l
bec:
Commitment Coordinator 62A 1 - Chesterbrook Correspondence Control Program 618 Chesterbrook C. Lewis 62C Chesterbrook (e-mail)
E. J. Cullen S23 Main Office M. E. Wamer A4-1S - Peach Bottom G. D. Edwards 62A Chesterbrook (e-mail)
J. G. Hufnagel 52A Chesterbrook S. P. Focht, P.E. ANI S. Mainji PA DER C. J. McDemiott S13 Main Office (e-mail)
! R. A. Kankus 62C Chesterbrook (e-mail)
- D. M. Kilgore SMB 2 Peach Bottom G. R. Rainey 63C Chesterbrook G. L. Johnston SMB3 Peach Bottom l
f i
f
- Peach Bott:m At:mic Power Stati:n Unit 2
'* Nov7.mber 1 through Nov:mber 30,1998
- 1. Narrative Summary of Operatino Experiences Unit 2 began the month of November shut down for the scheduled 2R12 refueling outage.
The unit went critical at 08:45 on November 1.
The generator was synchronized to the grid at 05:46 on November 2.
The unit reached 100% power at 13:00 on November 9.
Unit 2 ended the month of November at 100% power.
y
' ~ ' ~
l-t !
At'achment to L ,
Monthly Operating l
-
- Report for November 1998 1
l I
UNIT 2 REFUELING INFORMATION i
- 1. Name of facility:
l Peach Bottom Unit 2 I
- 2. Scheduled date for next refuelini shutdown:
Reload 13 'is scheduled for September 29,2000.-
J
- 3. Scheduled date for restart following refueling:
Restart following refueling forecast for October 27,2000. !
I a
- 4. . Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
N/A i i
If answer is yes, what, in general, will these be?
- 5. Scheduled date(s) for subn.itting proposed licensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analyms methods, significant changes in fuel design, new operating procedures: ;
- a. The reloaded included 292 GE-13 bundles which replaced an equal number of GE-11 bundles. This was the second reload of GE-13 fuel for the unit.
1 l
.- - - - . _ ... - .- - __ - -- . . . -. .~ ..
Docket No. 50-277 Attachment to Monthly Operating
~ -*
Report for November 1998 Page 2 l
UNIT 2 REFUELING INFORMATION (Continued)
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: .
I (a) Core - 764 Fuel Assemblies ,
l (b) Fuel Pool- 3012 Fuel Assemblies,52 Fuel Rods ]
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fusi assemblies: l The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2002 without full core offload capability.
I September 1998 with full core offload capability.
l h
l l . _ _ _ . _
.- - ~ . _ _ . _ - . _ _ . .--_ . . _ _ . _ _ . _
k OPERATING DATA REPORT DOCKET NO. 50 -277 DATE DECEMBER 7,1996 !
COMPLETED BY PECO ENERGY COMPANY D. M. KILGORE
- PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-3412 OPERATING STATUS
, PEACH B_OTTOM.UNlT 2
- 1. UNIT NAME: _. .;__. ._ .__ . _ _
, _ , . _ NOVEM8ER,1998
- 2. REPORTING PERIOD: . . __ , _ . . _ _.
1919
- 3. DESIGN ELECTRICAL RATING (NET MWE): ,_,_ ._ _ _._
- 4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): _. . . _
_ _1159 1093
- 5. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _ _ . . _ , . . .
THIS MONTH YR-TO-DATE CUMULATIVE
?!
711.3 7,981.1 147,568.2
' 6. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 00
- 7. REACTOR RESERVE SHUTDOWN HOURS 690 2 - 7,179 6 142,619.8
' 8. HOURS GENERATOR ON-LINE 0.0 0.0 00
- 9. UNIT RESERVE SHUTDOWN HOURS 692,810 6,832,962 - 136,869,760
- 10. NET ELECTRICAL ENERGY GENERATED (MWH)
G e
Q~
---..____m _ _ . . ~ _ . _ . .
UNIT SHUTDOWNS ,
DOCKET NO. 50-277 UNIT NAME PEACH BOTTOM UNIT 2 DATE DECEMBER 7,1998 .
COMPLETED BY PECO ENERGY COMPANY D. M. KILGORE PLANT ENGINEERING
' ENGINEERING DMSION PEACH BOTTOM ATOMIC POWER STATION NOVEMBER,1996 TELEPHONE (717)456-3412 REPORT MONTH .
METHOD OF CAUSE AND CORRECTIVE REASON SHUTTING DOWN ACTION TO
? TYPE DURATION -
~
REACTOR (3) . PREVENT RECURRENCE NO, 'DATE' (1) (HOURS) (2) 29.8 C 2 REFUELING OUTAGE
- p. 1 981101 'S TOTAL HOURS 29.8 l
1 I
4 (2) (3)
.. -(1)
REASON METHOD -
F-FORCED 1 - MANUAL S - SCHEDULED A- EQUIPMENT FAILURE (EXPLAIN)
B , MAINTENANCE OR TEST - 2 - MANUAL SCRAM -
C - REFUELING 3- AUTOMATIC SCRAM
+
'; 4 - OTHER (EXPLAIN) .
D - REGULATORY RESTRICTION .
- E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE '
G - OPERATIONAL ERROR (EXPLAIN)
. . .*s H. OTHER (EXPLAIN)
.r Peach Bottom Atomic Power Station Unit 3
. November 1 through November 30,1998
- 1. Narrative Summary of Operatino Experiences Unit 3 began the month of November at 100% power.
The unit reduced power to 70% starting at 23:00 on November 20 to perform reactor feedpump turbine testing, control rod sequence exchange, and control rod scram time testing.
The unit returned to 100% power at 16:00 en November 23.
The unit was shut down, using a manual scram, at 12:35 on November 27 to repair an instrument nitrogen supply line.
The unit went critical at 13:00 on November 28. ,
The generator was synchronized to the grid at 00:24 on November 29.
Unit 3 ended the month of November at 69% power.
b f
i
+
4 i
e y
. - . ~ . . -. , _ _ . .- - -.-.~ . . .-... - - - .~ . _ _ . - - . - . . - ~ -. ~ . ,
L
- .. .Dockst No. 50-278 L ,
Attachmeni to j Monthly Operating j Report for November 1998 ;
~
' UNIT 3 REFUELING INFORMATION -
l j
- 1. Name of facility:
l Peach Bottom Unit 3 l -t i 2. . Scheduled date for next refueling shutdown: . ,
Reload 12 scheduled for October 1,1999 l
)
l 3. Scheduled date for restart following refueling .
Restart following refueling scheduled for November 1,1999 )
l I
- 4. Will refueling or resumption of operation thereafter require a technical specification change or !
other license amendment? -J
.l Yes i
i If answer is yes, what, in general, will these be?
i
(- 1. Recirculating Pump Trip Modification to be installed during 3R12.
- 2. Power Range Monitor Modification to be implemented during 3R12. -;
(' 5. ' Scheduled date(s) for submitting proposed licensing action and supporting information. -j
, 1. : Recirculating Pump Trip has been submitted. l
- 2. Power Range Monitor is scheduled to be submitt;d in March,1999.
L 6.~ Important licensing considerations associated with refueling, e.g., new or different fuel design or l supplier, unreviewed design or performance analysis methods, significant changes in fuel design,
- new operating procedures
p (a) Preliminary reload will include 276 GE-13 bundles.
l )
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool
l i: -
(a) Core - 764 Fuel Assemblies b
b (b) Fuel Pool- 2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)
!- ( one of the 2777 is a skeleton which contains less than a full complement of fuel rods)
(-
L _ 8.' The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
I The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies, r a i
., .g g ..ia m. --
.-- Docket No. 50-278 Attachm:nt to M:nthly Op; rating Report for November 1998 Page 2 UNIT 3 REFUELING INFORMATION (Continued)
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity.
f September 2003 without full core offload capability.
September 1999 with full core offload capability.
l.
L l
l l
.r-,
. I OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE DECEMBER 10,1998 COMPLETED BY PECO ENERGY COMPANY D. M. K". GORE PLANT ENGINEERING ENGINEEPNG DMSION PEACH B0 i~OM ATOMIC POWER STATION TELEPHONE (717) 456-3412
' OPERATING STATUS -
. . . . _.P EACH BOTTOM UNIT 3
- 1. UNIT NAME: _.
NOVEMBER,1998
- 3. REPORTING PERIOD: _. ._._
, 1119
- 3. DESIGN ELECTRICAL RATING (NET MWE):
1159
- 4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1093
- 5. MAXIMUM DEPENDABLE CAPACITY (NET MWE): .._ .
THIS MONTH YR-TO-DATE CUMULATIVE 695.6 7.611.1 '145,564.9
- 6. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 0.0
- 7. REACTOR RESERVE SHUTDOWN HOURS 7,546.1 141,890.3 682.1
- 8. HOURS GENERATOR ON-LINE 0.0 0.0 0.0
- 9 UNIT RESERVE SHUTDOWN HOURS 706,851 l 8.146,859 135,151.981
- 10. NET ELECTRICAL ENERGY GENERATED (MWH)
O
^S e
9 ^
k . _ _ . . _ - _ _ _ . _ _ _.. . _ _ _ _ _ ...m_ _ _ _ ..Z. _ __ _. ___ -m_ . . _ _ . _ . _ . _ _ . . _ _ _ _ . . . - . vm .._.__mi__.____ _ _ _ _ _ _ ___
UNIT SHUTDOWNS DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 DATE DECEMBER 7,1998 COMPLETED BY PECO ENERGY COMPANY D. M. KILGORE PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH NOVEMBER,1998 TELEPHONE (717)456-3412
~
METHOD OF CAUSE AND CORRECTIVE REASON SHUTTING DOWN ACTION TO TYPE DURATION REACTOR (3) PREVENT RECURRENCE NO. DATE (1) (H-OURS) (2)
S 37.9 A 2 REACTOR POWERWAS REDUCED TO 0% TO ALLOW 1 981127 INSTRUMENT NITROGEN SUPPLY LINE REPAIR TOTAL HOURS 37.9 (2) (3)
,, (1)
REASON METHOD F-FORCED 1 -MANUAL -
S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)
B - MAINTENANCE OR TEST 2- MANUAL SCRAM C - REFUELING 3- AUTOMA. TIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) .
H - OTHER (EXPLAIN) ~