ML20198B859

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with
ML20198B859
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/30/1998
From: Johnston G, Kilgore D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9812210180
Download: ML20198B859 (12)


Text

Peach Bottom Atomic Power Statio.1

,Jo -

sy-PECO NUCLEAR nco u 1848 Lay Road c-v

'g IUnit of PECO Energy Delta, PA 17314 9032 717 456 7o14 December 4,1998 U.S. Nuclear Regulatory Commission ,

- Document Control Desk l Washington, D.C. 20555  ;

1 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of l November 1998 forwarded pursuant to Technical Specification 5.6.4 under the guidance of l Regulatory Guide 10.1, Revision 4.  ;

Sincerely, levy Y, Gordoh L. Johnston 1 Director, Site Engin ering l Peach Bottom Ato 'c Power Station GLJ/PJD/ RAM /JC:dmk tt %

Enclosures cc: N.J. Sprout, Public Service Electric & Gas

R. R. Janat', Commonwealth of Pennsylvania R.I. McLean, State of Maryland H. J. Miller, Administrator, Region I, USNRC A.C. McMurtray, USNRC, Senior Resident inspector A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center l J. Doering, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station I (e-mail) l ccn 98-14091 9812210180 981130 ~

PDR ADOCK 05000277

!, R PDR -

l ar -, ,

. . - - - , . . . - . ~ . . . ~ . ~ - . . . _ . . - . - - - - - . - .. . . ~ _ . - . - - . . _ = - . - ._

i-i ,

, .f

  • s l

l l

bec:

Commitment Coordinator 62A 1 - Chesterbrook Correspondence Control Program 618 Chesterbrook C. Lewis 62C Chesterbrook (e-mail)

E. J. Cullen S23 Main Office M. E. Wamer A4-1S - Peach Bottom G. D. Edwards 62A Chesterbrook (e-mail)

J. G. Hufnagel 52A Chesterbrook S. P. Focht, P.E. ANI S. Mainji PA DER C. J. McDemiott S13 Main Office (e-mail)

! R. A. Kankus 62C Chesterbrook (e-mail)

D. M. Kilgore SMB 2 Peach Bottom G. R. Rainey 63C Chesterbrook G. L. Johnston SMB3 Peach Bottom l

f i

f

- Peach Bott:m At:mic Power Stati:n Unit 2

'* Nov7.mber 1 through Nov:mber 30,1998

1. Narrative Summary of Operatino Experiences Unit 2 began the month of November shut down for the scheduled 2R12 refueling outage.

The unit went critical at 08:45 on November 1.

The generator was synchronized to the grid at 05:46 on November 2.

The unit reached 100% power at 13:00 on November 9.

Unit 2 ended the month of November at 100% power.

y

' ~ ' ~

l-t  !

At'achment to L ,

Monthly Operating l

-

  • Report for November 1998 1

l I

UNIT 2 REFUELING INFORMATION i

1. Name of facility:

l Peach Bottom Unit 2 I

2. Scheduled date for next refuelini shutdown:

Reload 13 'is scheduled for September 29,2000.-

J

3. Scheduled date for restart following refueling:

Restart following refueling forecast for October 27,2000.  !

I a

4. . Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A i i

If answer is yes, what, in general, will these be?

5. Scheduled date(s) for subn.itting proposed licensing action and supporting information:

N/A

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analyms methods, significant changes in fuel design, new operating procedures:  ;
a. The reloaded included 292 GE-13 bundles which replaced an equal number of GE-11 bundles. This was the second reload of GE-13 fuel for the unit.

1 l

.- - - - . _ ... - .- - __ - -- . . . -. .~ ..

Docket No. 50-277 Attachment to Monthly Operating

~ -*

Report for November 1998 Page 2 l

UNIT 2 REFUELING INFORMATION (Continued)

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: .

I (a) Core - 764 Fuel Assemblies ,

l (b) Fuel Pool- 3012 Fuel Assemblies,52 Fuel Rods ]

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fusi assemblies: l The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2002 without full core offload capability.

I September 1998 with full core offload capability.

l h

l l . _ _ _ . _

.- - ~ . _ _ . _ - . _ _ . .--_ . . _ _ . _ _ . _

k OPERATING DATA REPORT DOCKET NO. 50 -277 DATE DECEMBER 7,1996  !

COMPLETED BY PECO ENERGY COMPANY D. M. KILGORE

- PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-3412 OPERATING STATUS

, PEACH B_OTTOM.UNlT 2

1. UNIT NAME: _. .;__. ._ .__ . _ _

, _ , . _ NOVEM8ER,1998

2. REPORTING PERIOD: . . __ , _ . . _ _.

1919

3. DESIGN ELECTRICAL RATING (NET MWE): ,_,_ ._ _ _._
4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): _. . . _

_ _1159 1093

5. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _ _ . . _ , . . .

THIS MONTH YR-TO-DATE CUMULATIVE

?!

711.3 7,981.1 147,568.2

' 6. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 00

7. REACTOR RESERVE SHUTDOWN HOURS 690 2 - 7,179 6 142,619.8

' 8. HOURS GENERATOR ON-LINE 0.0 0.0 00

9. UNIT RESERVE SHUTDOWN HOURS 692,810 6,832,962 - 136,869,760
10. NET ELECTRICAL ENERGY GENERATED (MWH)

G e

Q~

---..____m _ _ . . ~ _ . _ . .

UNIT SHUTDOWNS ,

DOCKET NO. 50-277 UNIT NAME PEACH BOTTOM UNIT 2 DATE DECEMBER 7,1998 .

COMPLETED BY PECO ENERGY COMPANY D. M. KILGORE PLANT ENGINEERING

' ENGINEERING DMSION PEACH BOTTOM ATOMIC POWER STATION NOVEMBER,1996 TELEPHONE (717)456-3412 REPORT MONTH .

METHOD OF CAUSE AND CORRECTIVE REASON SHUTTING DOWN ACTION TO

? TYPE DURATION -

~

REACTOR (3) . PREVENT RECURRENCE NO, 'DATE' (1) (HOURS) (2) 29.8 C 2 REFUELING OUTAGE

p. 1 981101 'S TOTAL HOURS 29.8 l

1 I

4 (2) (3)

.. -(1)

REASON METHOD -

F-FORCED 1 - MANUAL S - SCHEDULED A- EQUIPMENT FAILURE (EXPLAIN)

B , MAINTENANCE OR TEST - 2 - MANUAL SCRAM -

C - REFUELING 3- AUTOMATIC SCRAM

+

'; 4 - OTHER (EXPLAIN) .

D - REGULATORY RESTRICTION .

- E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE '

G - OPERATIONAL ERROR (EXPLAIN)

. . .*s H. OTHER (EXPLAIN)

.r Peach Bottom Atomic Power Station Unit 3

. November 1 through November 30,1998

1. Narrative Summary of Operatino Experiences Unit 3 began the month of November at 100% power.

The unit reduced power to 70% starting at 23:00 on November 20 to perform reactor feedpump turbine testing, control rod sequence exchange, and control rod scram time testing.

The unit returned to 100% power at 16:00 en November 23.

The unit was shut down, using a manual scram, at 12:35 on November 27 to repair an instrument nitrogen supply line.

The unit went critical at 13:00 on November 28. ,

The generator was synchronized to the grid at 00:24 on November 29.

Unit 3 ended the month of November at 69% power.

b f

i

+

4 i

e y

. - . ~ . . -. , _ _ . .- - -.-.~ . . .-... - - - .~ . _ _ . - - . - . . - ~ -. ~ . ,

L

.. .Dockst No. 50-278 L ,

Attachmeni to j Monthly Operating j Report for November 1998  ;

~

' UNIT 3 REFUELING INFORMATION -

l j

1. Name of facility:

l Peach Bottom Unit 3 l -t i 2. . Scheduled date for next refueling shutdown: . ,

Reload 12 scheduled for October 1,1999 l

)

l 3. Scheduled date for restart following refueling .

Restart following refueling scheduled for November 1,1999 )

l I

4. Will refueling or resumption of operation thereafter require a technical specification change or  !

other license amendment? -J

.l Yes i

i If answer is yes, what, in general, will these be?

i

(- 1. Recirculating Pump Trip Modification to be installed during 3R12.

2. Power Range Monitor Modification to be implemented during 3R12. -;

(' 5. ' Scheduled date(s) for submitting proposed licensing action and supporting information. -j

, 1. : Recirculating Pump Trip has been submitted. l

2. Power Range Monitor is scheduled to be submitt;d in March,1999.

L 6.~ Important licensing considerations associated with refueling, e.g., new or different fuel design or l supplier, unreviewed design or performance analysis methods, significant changes in fuel design,

new operating procedures

p (a) Preliminary reload will include 276 GE-13 bundles.

l )

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool

l i: -

(a) Core - 764 Fuel Assemblies b

b (b) Fuel Pool- 2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)

!- ( one of the 2777 is a skeleton which contains less than a full complement of fuel rods)

(-

L _ 8.' The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

I The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies, r a i

., .g g ..ia m. --

.-- Docket No. 50-278 Attachm:nt to M:nthly Op; rating Report for November 1998 Page 2 UNIT 3 REFUELING INFORMATION (Continued)

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity.

f September 2003 without full core offload capability.

September 1999 with full core offload capability.

l.

L l

l l

.r-,

. I OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE DECEMBER 10,1998 COMPLETED BY PECO ENERGY COMPANY D. M. K". GORE PLANT ENGINEERING ENGINEEPNG DMSION PEACH B0 i~OM ATOMIC POWER STATION TELEPHONE (717) 456-3412

' OPERATING STATUS -

. . . . _.P EACH BOTTOM UNIT 3

1. UNIT NAME: _.

NOVEMBER,1998

3. REPORTING PERIOD: _. ._._

, 1119

3. DESIGN ELECTRICAL RATING (NET MWE):

1159

4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):

1093

5. MAXIMUM DEPENDABLE CAPACITY (NET MWE): .._ .

THIS MONTH YR-TO-DATE CUMULATIVE 695.6 7.611.1 '145,564.9

- 6. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 0.0

- 7. REACTOR RESERVE SHUTDOWN HOURS 7,546.1 141,890.3 682.1

8. HOURS GENERATOR ON-LINE 0.0 0.0 0.0

- 9 UNIT RESERVE SHUTDOWN HOURS 706,851 l 8.146,859 135,151.981

10. NET ELECTRICAL ENERGY GENERATED (MWH)

O

^S e

9 ^

k . _ _ . . _ - _ _ _ . _ _ _.. . _ _ _ _ _ ...m_ _ _ _ ..Z. _ __ _. ___ -m_ . . _ _ . _ . _ . _ _ . . _ _ _ _ . . . - . vm .._.__mi__.____ _ _ _ _ _ _ ___

UNIT SHUTDOWNS DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 DATE DECEMBER 7,1998 COMPLETED BY PECO ENERGY COMPANY D. M. KILGORE PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH NOVEMBER,1998 TELEPHONE (717)456-3412

~

METHOD OF CAUSE AND CORRECTIVE REASON SHUTTING DOWN ACTION TO TYPE DURATION REACTOR (3) PREVENT RECURRENCE NO. DATE (1) (H-OURS) (2)

S 37.9 A 2 REACTOR POWERWAS REDUCED TO 0% TO ALLOW 1 981127 INSTRUMENT NITROGEN SUPPLY LINE REPAIR TOTAL HOURS 37.9 (2) (3)

,, (1)

REASON METHOD F-FORCED 1 -MANUAL -

S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN)

B - MAINTENANCE OR TEST 2- MANUAL SCRAM C - REFUELING 3- AUTOMA. TIC SCRAM D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) .

H - OTHER (EXPLAIN) ~

_ --. - - _ _