|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20198L3331997-12-18018 December 1997 Safety Evaluation Supporting Approval of Proposed Merger of Atlantic Energy,Inc,& Delmarva Power & Light Co ML20212G8301997-10-24024 October 1997 Safety Evaluation Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively ML20198S2161997-10-24024 October 1997 Safety Evaluation Accepting Proposed Change to Provisions Identified in Rev 14 of PBAPS QAP Description Re Nuclear Review Board Meeting Frequency ML20217J5631997-10-0909 October 1997 Safety Evaluation Supporting Amend 225 to License DPR-56 ML20217J6161997-10-0707 October 1997 Safety Evaluation Re Alternative to Reactor Pressure Vessel Circumferential Weld Insps for Plant,Unit 3 ML20211L6241997-10-0303 October 1997 Safety Evaluation Authorizing Licensee Proposed Use of Code Case N-516-1 to Weld Modified Suction Strainer in Suppression Chamber at Plant ML20217D8161997-09-30030 September 1997 Safety Evaluation Supporting Amend 224 to License DPR-56 ML20211D6201997-09-17017 September 1997 SER Accepting VT-2 Examiner Qualification Request for PECO Energy Company,Peach Bottom Atomic Power Station,Units 2 & 3 ML20216G5601997-09-0404 September 1997 Safety Evaluation Supporting Amends 220 & 223 to Licenses DPR-44 & DPR-56,respectively ML20217M8001997-08-19019 August 1997 Safety Evaluation Supporting Amends 219 & 222 to Licenses DPR-44 & DPR-56,respectively ML20149L2841997-07-23023 July 1997 Safety Evaluation Accepting Licensee Relief Request RR-22 for Plant,Units 2 & 3 ISI Program ML20140B0371997-05-30030 May 1997 Safety Evaluation Accepting QAP Description Change ML20135B4111997-02-19019 February 1997 Safety Evaluation Supporting Amends 218 & 221 to Licenses DPR-44 & DPR-56,respectively ML20149L8681996-11-15015 November 1996 SER Accepting Core Spray Piping Insp & Flaw Evaluation for Plant,Unit 2 ML20149L2441996-01-29029 January 1996 Safety Evaluation Accepting Insp & Evaluation Methodology for Operation of Unit 3 Core Shroud for Duration of Current Operating Cycle,Performed in Response to GL 94-03 ML20058F5641993-11-19019 November 1993 SE Accepting Util 930305 Response to NRC Bulletin 90-01, Suppl 1, Loss of Fill-Oil in Transmitters Mfg by Rosemount ML20057B6441993-09-16016 September 1993 SER Concluding That Safe Shutdown Capability at Plant, Satisfies Requirements of Section Iii.G & Iii.L of App R to 10CFR50 ML20126H9031992-12-23023 December 1992 Safety Evaluation Granting Relief from Inservice Insp Requirements for Facilities ML20127N4941992-11-17017 November 1992 Safety Evaluation Accepting Util 120-day Response to Suppl 1 to GL 87-02 ML20062C7501990-10-26026 October 1990 Safety Evaluation Re Evaluation of Response to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow ML20246E0331989-08-21021 August 1989 SER Supporting Util Response to Generic Ltr 83-28,Item 2,1 (Parts 1 & 2).Programs Exist for Identifying safety-related Components Required for Reactor Trip Function & Vendor Interface W/Nmss Vendor for Required Components ML20205A8801988-10-31031 October 1988 Safety Evaluation of Util Plan for Restart of Peach Bottom Atomic Power Station ML20148P3351988-04-0101 April 1988 SER Accepting Util Responses to Generic Ltr 83-28,Item 2.2.1 Re Equipment Classification Program for All safety-related Components ML20148E6301988-01-15015 January 1988 SER Accepting Util 840116,0927 & 850805 Responses to Generic Ltr 82-33,Item 6 Re Compliance w/post-accident Monitoring Instrumentation Guidelines of Reg Guide 1.97 Concerning Emergency Response Facilities ML20236D0541987-10-22022 October 1987 Safety Evaluation Supporting Util Repts on Computer Program Analyses Methods Intended for Use in Part of Plant Core Reload Analyses ML20235D2431987-09-22022 September 1987 Safety Evaluation Re Proposed Onsite Storage of Liquid Oxygen & Hydrogen for Implementation of Hydrogen Water Chemistry.Permanent Hydrogen Water Installation Acceptable ML20209H0201987-04-24024 April 1987 Safety Evaluation Supporting Util Re Torus Attached Piping Mods - Mark I Program ML20204C1001986-07-24024 July 1986 Safety Evaluation Supporting Listed Util Responses & Actions Reviewed During Insp on 840913-19 Re Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 ML20141F6071986-04-0808 April 1986 Safety Evaluation Granting Util Requests for Relief from Inservice Insp Requirements of ASME Code,Section XI ML20209C3141986-03-20020 March 1986 Safety Evaluation Supporting Shroud Head Connection Replacement at Facility,Per Util 860107 Submittal 1999-09-24
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9931999-10-14014 October 1999 Safety Evaluation Supporting Amend 234 to License DPR-56 ML20217B4331999-10-0505 October 1999 Safety Evaluation Supporting Amend 233 to License DPR-56 ML20217G3541999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with ML20216H7091999-09-24024 September 1999 Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively ML20212D1281999-09-17017 September 1999 Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 ML20212A5871999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With ML20211D5501999-08-23023 August 1999 Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively ML20212H6311999-08-19019 August 1999 Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 ML20210N7641999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with ML20209H1121999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with ML20195H8841999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with ML20206N1661999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with ML20206A2921999-04-20020 April 1999 Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20205K7411999-04-0707 April 1999 Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively ML20205P5851999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With ML20207G9971999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With ML20199E3471998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With ML20205K0381998-12-31031 December 1998 PECO Energy 1998 Annual Rept. with ML20206P1651998-12-31031 December 1998 Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection ML20206D3651998-12-31031 December 1998 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with ML20206D3591998-12-31031 December 1998 1998 PBAPS Annual 10CFR72.48 Rept. with ML20196G7021998-12-0202 December 1998 SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles ML20196E8261998-11-30030 November 1998 Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 ML20198B8591998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with ML20206R2571998-11-17017 November 1998 PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 ML20198C6751998-11-0505 November 1998 Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 ML20195E5341998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with ML20155C6071998-10-26026 October 1998 Safety Evaluation Supporting Amend 226 to License DPR-44 ML20155C1681998-10-22022 October 1998 Safety Evaluation Accepting Proposed Alternative Plan for Exam of Reactor Pressure Vessel Shell Longitudinal Welds ML20155H7721998-10-12012 October 1998 Rev 1 to COLR for Peach Bottom Atomic Power Station Unit 2, Reload 12,Cycle 13 ML20154J2401998-10-0505 October 1998 Safety Evaluation Supporting Amends 224 & 228 to Licenses DPR-44 & DPR-56,respectively ML20154H4771998-10-0505 October 1998 Safety Evaluation Supporting Amends 225 & 229 to Licenses DPR-44 & DPR-56,respectively ML20154G6821998-10-0101 October 1998 SER Related to Request for Relief 01A-VRR-1 Re Inservice Testing of Automatic Depressurization Sys Safety Relief Valves at Peach Bottom Atomic Power Station,Units 2 & 3 ML20154G6631998-10-0101 October 1998 Safety Evaluation Supporting Amends 223 & 227 to Licenses DPR-44 & DPR-56,respectively ML20154H5541998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Pbaps,Units 2 & 3. with ML20153B9651998-09-14014 September 1998 Safety Evaluation Supporting Amend 9 to License DPR-12 ML20151Y2901998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbaps,Units 2 & 3. with ML20238F2661998-08-24024 August 1998 Safety Evaluation Supporting Amend 222 to License DPR-44 ML20237B9531998-08-10010 August 1998 Specification for ISI Program Third Interval,Not Including Class Mc,Primary Containment for Bpaps Units 2 & 3 ML20237A7761998-08-10010 August 1998 SER Accepting Licensee Response to NRC Bulleting 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode ML20237A5351998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Pbaps,Units 2 & 3 ML20236R8281998-07-15015 July 1998 Safety Evaluation Approving Proposed Alternative (one-time Temporary non-Code Repair) Pursuant to 10CFR50.55a(a)(3) (II) ML20236M3471998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbaps,Units 2 & 3 ML20249C4791998-06-0202 June 1998 Rev 6 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20248F4781998-06-0101 June 1998 Corrected Page 1 to SE Supporting Amends 221 & 226 to Licenses DPR-44 & DPR-56,respectively.Original Page 1 of SE Had Three Typos ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML20248M3001998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Pbaps,Units 2 & 3 ML20247N5351998-05-11011 May 1998 SER Accepting Third 10-year Interval Inservice Program for Pump & Valves for Plant,Units 2 & 3 ML20249C4751998-05-0707 May 1998 Rev 5 to COLR for PBAPS Unit 2 Reload 11,Cycle 12 ML20247G0721998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Pbaps,Units 2 & 3 1999-09-30
[Table view] |
Text
4
}C NUCLEAR REGULATORY COMMISSION
{q WASHINGTON, D.C. 205%4>001
,o SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 233 TO FACILITY OPERATING LICENSE NO. DPR-56 PECO ENERGY COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY j ATLANTIC CITY ELECTRIC COMPANY l
PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 DOCKET NO. 50-278 i
1.0 INTRODUCTION
By letter dated July 12,1999, as supplemented by a letter dated August 30,1999, PECO Energy Company (licensee) proposed changes to the technical specifications (TS) for the Peach Bottom Atomic Power Station (PBAPS), Unit No. 3 Cycle 13 operation. The proposed TS changes include the safety limit minimum critical power ratio (SLMCPR) and references to the approved methodologies in the core operating limits report (COLR). The PBAPS Unit No. 3 Cycle 13 core has 764 fuel assemblies, of which there are 276 fresh GE13 bundles,292 once-burned GE13 bundles, and 196 twice-burned GE11 bundles. The August 30,1999, letter provided additional information but did not change the initial proposed no significant hazards consideration determination or expand the amendment beyond the scope of the initial Federal Feaister notice published August 11,1999.
2.0 BACKGROUND
Criterion 10 of Appendix A of 10 CFR Part 50, " Reactor Design," (GDC-10) requires, and safety limits ensure, that specified acceptable fuel design limits are not exceeded during steady state operation, normal operational transients, and anticipated operational occurrences. Safety limits are required to be included in the technical specifications by 10 CFR 50.36. Safety limits are established to protect the integrity of the fuel cladding, reactor pressure vessel, and primary system piping during normal plant operations and anticipated transients. The fuel cladding integrity safety limit is the SLMCPR. The basis for the SLMCPR is to ensure that greater than
, 99.9 percent of all fuel rods in the core avoid transition boiling. The margin between calculated I boiling transition and the SLMCPR is based on a detailed statistical methodology. Every refueling cycle the SLMCPR is recalculated due to fuel replacement.
9910120252 991005 l
PDR ADOCK 05000278 P PDR L.
V x
3 7..
L f1 '3.0 EVALUATION L .
The licensee requested a change to the PBAPS Unit No. 3 TS in accordance with 10 CFR
! : 50.90. The' licensee proposed the following revisions:
Revise TS 2.1.1.2 to reflect changes in SLMCPR due to use of fuel-cycle specific l analysis. .. , .
La' _ Delete the cycle-specific footnote associated with TS 5.6.5.b.1.
- Update the reference contained in TS 5.6.5.b.2 which documents the analytical method used to determine core operating limits.
TS 2.1.1.2 With' the Reactor Steam Dome Pressure i 785 osia and Core Flow > 10 Percent Rated Core Flow -
The proposed change to TS 2.1.1.2 includes the following: (1) changing the SLMCPR values from 1.11 to 1.09 for two recirculation loop operation and from 1.12 to 1.11 for single recirculation loop operation; and (2) deleting the cycle-specific footnote "MCPR values in TS
. 2.1.1.2 are' applicable only for Cycle 12 operation."
In their submittal, the licensee described the methodology used to calculate the cycle-specific SLMCPR value for PBAPS Unit No. 3 Cycle 13 operation. The Cycle 13 SLMCPR analysis was performed by GE Nuclear Energy (GENE) using the plant- and cycle-specific fuel and core parameters and NRC approved methodologies described in GESTAR-II (NEDE-24011-P-A-13),
and the Amendment 25 to GESTAR-II, NEDE-24011. The analysis includes the impact of the I differences in the core and bundle designs between Cycle 12 and Cycle 13. ,
The's't aff has reviewed the justification for the SLMCPR value of 1.09 for two recirculation loop
. operation and 1.11 for single loop operation for Cycle 13 using the approach stated in the 4 ' Amendment 25 to GESTAR-II, NEDE-24011.
~
Based on our review of the submittal and the detailed' summary results of the analysis for the I Cycle 12 and 13 operation, the staff has concluded that the Cycle 13 SLMCPR analysis for PBAPS, Unit No. 3 using the plant- and cycle-specific calculation in conjunction with the approved method is acceptable for PBAPS, Unit No. 3. The Cycle 13 SLMCPR will ensure that 99.9 percent of the fuel rods in the core will not experience boiling transition which satisfies the requirements of General Design Criterion 10 of Appendix A to 10 CFR Part 50 regarding acceptable fuel design limits. The staff has concluded that the justification for the
.SLMCPR value of 1.09 for two loop and 1.11 for single loop for PBAPS, Unit No.3 Cycle 13 operation is acceptable since approved methodologies were used.
The proposed removal of cycle-specific footnote is also acceptab!e since it is applicable to Cycle 12 only.:
j' TS 5.6.5 Core Operatino Limits Report The' proposed change'to TS 5.6.5 includes the following: (1) removing the cycle-specific l
l footnote, "For Cycle 12, specific documents were approved in the safety evaluation dated (10/9/97) to support License Amendment No. (225)," which is associated with TS 5.6.5.b.1; and (2) updating a reference contained in TS 5.6.5.b.2 which documents an analytical method used to determine the core operating limits. The update will reflect changes that were previously approved by the Nuclear Regulatory Commission (NRC) in safety evaluation (SE) report dated August 10,1994 (Amendment No.192 for PBAPS Unit No. 2). Specifically, the licensee will update to " Maximum Extended Load Line Limit and Arts improvement Program Analysis for Peach Bottom Atomic Power Station Units 2 and 3," Revision 2 March 1995 (ARTS /MELLA),
which documents an analytical method used to determine the core operating limits.
The staff has reviewed the proposed changes and found them acceptable since (1) the analysis was in accordance with the approaches stated in Amendment 25 to GESTAR-II, NEDE-24011-P-A, and the cycle-specific footnote in TS 5.6.5.b.1 is no longer applicable; (2) the approved topical report was updated to Revision 2 and the revision is administrative and will ensure that the TSs are accurate and consistent with other licensing documents.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Pennsylvania State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The l Commission has previously issued a proposed finding that the amendment involves no i significant hazards consideration, and there has been no public comment on such finding j (64 FR 43777). The amendment also relates to changes in recordkeeping, reporting, or l administrative procedures or requirements. Accordingly, the amendment meets the eligibility j criteria for categorical exclusion set forth in 10 GR bl.22(c)(9) and (10). Pursuant to 10 CFR ;
51.22(b) no environmental impact statement or environmental assessment need be prepared in l connection with the issuance of the amendment. !
6.0 CONCLUSION
i l
The Commissim has concluded, based on the considerations discussed above, that: (1) there I I
'E v 3 sri.c m,surance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the !
Commission's regulations, and (3) the issuance of the amendment will not be in;mical to the common defense and security or to the health and safety of the public.
Principal Contributor: T. Huang Date: October 5, 1999 1