Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With
ML20207G997
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/28/1999
From: Johnston G, Kilgore D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-10.001 NUDOCS 9903120216
Download: ML20207G997 (11)


Text

... _-. ._ _. . -- . .. . . . ~. -. . _ _

Peach Bottom Atomic Power Station u  :. .

A <

V PECO NUCLEAR e,co ,m ,,,ccm ,,,,

A Uhit of PECO Energy y,y,V g4 9032 1

717 456 7014 4

J March 2,1999 1

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen Enclosed is the monthly operating repon for Peach Bottom Units 2 anc 3 for the month of February 1999 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, l

Gordon L Johnston Director, Site Engineering Peach Bottom Atomic Power Station l frJ GLJ/WJ/DEK/JC:dmk pc Enclosures cc: N.J. Sproul, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania R.I. McLean, State of Maryland H. J. Miller, Administrator, Region I, USNRC i A.C. McMurtray, USNRC, Senior Resident inspector k' A.F. Kirby,111, Delmarva Power & Light

" AO Records Center r

cor 99-14022 0[ f 9903126216 ADOCK ONXXM,177 6

PDet R

  • J

. Peach Bottom Atomm Power Station Unit 2 ,

, February 1 through February 28,1999  !

J

1. Narrative Summarv of Operatina Experiences Unit 2 began the month of February at 100% power.

The unit reduced power to 61% starting at 22:00 on February 19 for control rod scram time l

- testing, reactor feedpump turbine testing, a control rod sequence exchange, and repair of a l moisture separator drain tank drain valve.

The unit retumed to 100% st 16:00 on February 20.

Unit 2 ended the month of February at 100% power.

1

[*.

4 Attachment to l I

Monthly Operating Report for February 1999 I Paje 1 ,

1

, l 4

UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2

2. - Scheduled date for next refueling shutdown:

! Reload 13 is scheduled for September 29,2000.

5

3. Scheduled date for restart following refueling

Restart following refueling forecast for October 27,2000.

. 1

4. Will refueling or resumption of operation therefore require a technical epecification change l or otherlicense amendment?

N/A I 1

) If answer is yes, what, in general, wi;l these be? J

5. Scheduled date(s) for submitting proposed licensing action and Jupporting information:

l N/A j

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or ,

supplier, unreviewed design or performance analysis methods, significant changes in fuel design, j new operating procedures: j a, The reload included 292 GE-13 bundles which replaced an equal number of GE-11 bundles, )

This was the second reload of GE-13 fuel for the unit.

m - ..-

-- .. . . . - - -~ -- - - . . - . . . . . - - .. - _ ~

d Dockit No. 50-277  !

Attachment to Monthly Operating  ;

Report for February 1999 l Page 2 )

UNIT 2 REFUELING INFORMATION (Continued) l

7. The numbec of fuel assemblies (a) in the core and (b) in the spent fuel storage pool: d (a) Core - 764 Fuel Assemblies (b) Fuel Pool- 3012 Fuel Asse.nblies,52 Fuel Rods
8. The present licensed spent fuel pool storage capacity aN the size of any increase in licensed storage capacity that has been requer,ted or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the tast refueling that can be discharged to the spent fuel pool assuming the present capacity 1

September 2002 without full core offload capability.  ;

i September 1998 with full core offload capability. I i

l l

4 OPERATING DATA REPORT t

DOCKET NO. 50 -277 DATE MARCH 2,1999 COWUETED BY PECO ENERGY COMPANY D. M KILGORF.

PtANT ENGINEERING a

ENGINEERING DMS40N I

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-3412 OPERATING STATUS PEACH BOTTOM UNIT 2

1. UNIT NAME: FEBRUARY,1999
2. REPORTING PERIOD: 1119 l
3. DESIGN ELECTRICAL RATING (NET MWE): 1159
4. MAXIMUM CEPENDABLE CAPACITY (OROSS MWE): 1093 5 MAX! MUM DEPENDABLE CAPACITY (NET MWE):

YR-TO-DATE CUMULATNE THIS MONTH 146,963 2 1 1,416.0 672 0 j 6. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 0.0

7. REACTOR RESERVE SHUTDOWN HOURS 144,779.8 672.0 1.416.0
8. HOURS GENERATOR Om 0.0 0.0 0.0
9. UNIT RESErNE SHUTDOWN HOURS 1,578.019 130.270.291 ,

747,123

10. NET ELE'CTRICAL ENERGY GENERATED (MWH)

~%

e' s

  • * ' s , _ . ,

~'

UNIT SHUTDCM/NS .

UNITNARE PEACHBOTTOMUNIT2

  • DATE MARCH 2.1999 COhPLETEDBY PECOENERGYCC9FANY D. M. IGLGORE PUWT ENGINEERING ENGINEERING DMSDON PEACH BOTTOM ATOMIC POWER STATION FEBRUARY.1999 TELEPHONE (717)4563412 REPORT MONTH NETHOD OF CAUSE AND CORRECTNE REASON SHUTTING DOWN ACTIONTO '

TYPE 00 RATION PREVENT RECURRENCE DATE . HOURS) (2) REACTOR (3)

NO. (1)

TOTAL HOURS (3)

(2)

(1)

REASON METHOD F-FORCED 1 -IMNUAL A-EQUIPMENT FAILURE (EXPLAIN)

S -SCHEDULED 2 -MANUAL SCRAM B-MAINTENANCE CR TEST 3- AUTOMATIC SCRAM C- REFUELING D-REGULATORY RESTRICTION 4 -OTHER (EXPLAIN)

E- OPERATOR TRAINING + LICENSE EXAMINATION F- ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

-_--_ _ _ _ _ _ _ _ - _-. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ - - - - - _ _ _ _ - - _ - . _ _ _ - - _ - _ _ _ _ _ _ - - _ _ - _ _ _ _ _ - . _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - _ - _ _ _ . -- . _ _ . _ - . - _ _ _. ~ _ - . -

J

. Peach Bottom Atomic Power Station Unit 3 1

, , February 1 through February 28,1999  !

l

1. Narrative Summary of Operatina Experiences 1

i Unit 3 began the month of February at 100% power.

The unit operated at 100% for the entire month of Februaiy.

Unit 3 ended the month of February at 100% power.

l 4

l l

l l

i j

i i

w

Dockpt No. 50-278 )

( Attachm:nt to Monthly Operating Report for February 1999 1 1

UNIT 3 REFUELING INFORMATION j

1. Name of facility:

Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

Reload 12 scheduled for October 1,1999 )

3. Scheduled date for restart following refueling Rectart following refueling scheduled for November 1,1999
4. Will refueling or resumption cf operation thereafter require a technir.al specification change or other license amendment?

Yes if answer is yes, what, in general, will these be?

1. Recirculating Pump Trip Modification to be installed during 3R12.
2. Power Range Monitor Modification to be implemented during 3R12.
5. Scheduled c' ate (s) for submitting proposed licensing action and supporting information.
1. Recirculating Pump Trip has been submitted, and was approved for implementation
2. Power Range Monitor is scheduled to be submitted in March,1999.
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

(a) Preliminary reload willinclude 276 GE-13 bundles.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)

( one of the 2777 is a skeleton which contains less than a full complement of fuel rods)

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

i

9

' ' Dock;t No.60-278 Att:chmInt to Monthly Operating Iteport for February 1999 Page 2 UNIT 3 REFUELING INFORMATION (Contmuod)

9. ' The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity: ,

September 2003 without full core offload capability.

J September 1999 with full core officad capability.

1 I

1 l

I

1 OPERATING DATA REPORT I t DOCKET NO. 50-278 DATE MARCH 2,1999 i COMPLETED BY PECO ENERGY COWANY D. M.10LGORE PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOIAC POWER STATION -

TELEPHONE (717)456-3412 OPERATING STATUS PEACH BOTTOMUNIT 3

1. UNIT NAhEi: FEPRUARY,1999
2. REPORTING PERIOD: 1119 ,

3 DESIGN ELECTRICAL RATING (NET MWE): 1159

4. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE). 1093
5. MAXIMUM DEPENDABLE CAPACITY (NET MWs):

YR-TO-DATE CUMULATNE THIS MONTH 1,416.0 147,724 9 j 672.0

6. NUMBER OF HOURS f :EACTOR WAS CRITICAL 00 00 00 .
7. REACTOR RESERVE SHUTDOWN HOURS 1,416.0 143,933.0 l 672.0
8. HOURS GENERATOR ON-UNE 0.0 00  !

0.0  !

9. UNIT RESERVE SHUTDOWN HOURS 137,408.331 i 749.586 1.579.582 i
10. NET ELECTRICAL ENERGY GENERATED (MWH)

I h

I


m-- -- - - - - - - - - __ --- w_- - _ _ - . _ _ - - - - . - - - - - - . - - _ - - - - - - - - - _ - _ _ - - - _ _ _

-- y UNIT SHUTDOWNS ...

5 DOCrETNO. 50-278 't UNITNiWE! PEACHBOTTOMUNIT3

(

DATE WRCH2.1999 COM'LETEDBY PECOENERGYCOMPANY D. M. KILGORE PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOntC POWER STATION' FEBRUARY,1999 TELEPHONE (717)4564412 REPORT MONTH METHOD OF CAUSE AND CORRECTNE +

SHUTTING DOWN ACTION TO TYPE DURATION REASON REACTOR (3) PREWNT RECURRENCE NO. DATE (1) (HOURS) (2) . . _ - . - . -

TOTAL HOURS i

E i

(3)

(2)

(1) hETHOD REASON 1 - MANUAL F-FORCED A-EQUIPnENT FAILURE (EXPLAIN)

S-SCEDULED 2-MANUAL SCR ... . i B- MAINTENANCE OR TEST 3- AUTOMATIC SCRAM C- REFUELING 4-OTHER (EXPLAIN) .

D-REGULATORY RESTRICTION  !

E - OPERATOR TRAINING + UCENSE EXAMINATION F- ADMINISTRATNE G-OPERAllONALERROR (EXPtAIN)

H-OTHER (EXPUMN)

.. - _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . - __- ____--______ _ __ _ ._ .. -_ - , - __ ,_ _ - _ - __: