Telecopy AO 75-69:on 751023,O-ring Gasket Leak Found on Drywell Purge Supply Valve AO-3505.Cause Under Investigation.Corrective Action to Be Determined After Investigation
ML20086H074
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/24/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
AO-75-69, NUDOCS 8401130389
Download: ML20086H074 (1)


Text

'~

[

_ i_..

~~O

(

l CE)

()

~

PHILADELPHIA ELECTRIC CO.MPANY i

Peach Bottom Atemic Power Station l

Delta, Pennsylvania October 29, 1975 (r. James P. O'Reilly, Director n

Office of Inspection and Enforcement w

i Region 1 Jnited States Nuclear Regulatory Commission i

531 Park Avenue

-t

'ing of Prussia, Pennsylvania 19406

Subject:

Abnormal Occurrence 24-Hour Notiftention

]

s Confirming.R. S. Fleischmann's phone conversation with Mr. Walt Baunack, i

Region 1, United States Nuclear Regulatory Commission on October 24, 1975 J

8eference:

License Number DPR-56 I

Technical Specification -

Reference:

4.7.A.2.f g

aeport no.:

50-278-75-69

}

3eport Date:

October 2#, 1975 Occurrence Date:

October 23, 1975 Facility:

Peach Botton Atomic Power Station R.D. 1, Delta, Pennsylvania 1731'4 j

i Identification cf Occurrence 0-ring gasket leak on Drywell Purge Supply Valve AO-3505 I

i Conditions Prior to Occurrence:

Reactor power 575.

Description of Occurrence:

I:

s While preparing for a local leak rate test on the inboard flange of the Drywell Purge Supply Outer Isolation Valve, containment atmosphere was found to leak out.

The inner 0-ring leaks.

Designation of Apparent Cause of Occurrence:

Under investigation.

l Analysis of Occurrence:

The other isolation valves associated with this penetration were closed i

at the time of the occurrence.

A local leak test of all those.

isolation valves and the outer 0-ring done on 10/15/75 showed them to be leak tight.

Safety

  • implications are therefore minimal.
  • ~

Corrective Action:

To be determined after investigation.

Failure Data:

Abnormal Occurrence Report Numbers 50-277-75-68 and 50-277-75-69 Ver truly yours,

4. T. UE rich, Superintendent i

Peach Bottom Atomic Power Station

.9 1

d J

B401130309 751024 I

j PDR ADOCK 05000278 i