Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with
ML20195E534
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/31/1998
From: Johnston G, Kilgore D
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-10.001 NUDOCS 9811190014
Download: ML20195E534 (9)


Text

. _ _ _ _ _ _ m. . _.._ __ - . . . , _ ._ . _ _ . . _ _ . -_

)*-

Perch Bott m Atomic Power Stition i.

.g.

v PECO NUCLEAR Ucot";?d"*""

  • A Unit 6f PECO Energy - Delta. PA 17314-9032 717 456 7014 f

November 1,1998 U.S. Nuclear Regulatorv Comraission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1998 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, y

Gordon L. Johnston ,/

M' [ .

Director, Site Engirjeering y 1--

i Peach Bottom At@lc'r Station GLJ/O RAM /JC:dmk

? $ $6 Enclosures -

l cc: N.J. Sproul, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania  !

R.I. McLean, State of Maryland '

i H. J. Miller, Administrator, Region I, USNRC

A.C. McMurtray, USNRC, Senior Resident Inspector l

A.F. Kirby, Ill, Delmsrva Power & Light i INPO Records Center i

! J. Doeting, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station t

(e-mail) f

)f- n&d 1

ccn 98-14086 9811190014 98iO31E PDR ADOCK 05000277 R PD(

I

. Peach Bottom Atomic Power Station

.- Unit 2 October .1 through October 31,1998 a <g

1. Narrative Summary of Operatina Experiences ,

Unit 2 began the month of October shut down for the scheduled 2R12 refueling outage.

The unit was shut down for refueling during the entire month of October.

Unit 2 ended the month of October shut down for the scheduled 2R12 refueling outage.

l l

. _~_. _. . . ._ _ .. _ . _ _ _ .. _ _ _ _ _ _ _ _ _ _ ., _ _ _... . __. _

l Attachment to l Monthly Operating Report for October 1998 l ..

L l UNIT 2 REFUELING INFORMATION i.

1. Name of facility:  ;
j. Peach Bottom Unit 2 l-o

~ 2. - Scheduled date for next refueling shutdown:

( Reload 13 is scheduled for September 29,2000.

1 P

3. Scheduled date for restart following refueling:

l Restart following current refueling forecast for November 1,1998. I

- )

1

4. Will refueling or resumption of operation therefore require a technical specification change- I or otherlicense amendment?

l- Yes

- If answer is yes, what, in general, will these be?

1. Wide Range Neutron Monitoring Modification to be installed during 2R12.

p 2. Cycle 13 Safety Limit MC#

  • Technical Specification change.
3. , Recirculating Pump Trip Modification to be installed during 2R12.

4.1 Main Steam Relief Valve (MSRV) testing change.

l s

5. Scheduled date(s) for submitting proposed licensing action and supporting information:
1. Wide Range Neutron Monitoring has been submitted.

l 2. Cycle 13 MCPR has been submitted .

l F

~ 3. - Recirculating Pump Trip has been submitted.

i 4. MSRV T/S change has been submitted.

l.

! 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or

( . supplier, unreviewed design or performance analysis methods, significant changes in fuel design, l~ new operating procedures:

4

, a. - Reload will include 292 GE13 bundles.

4-

['

4

Docket No. 50-277 Attachment to Monthly Operating Report for October 1998 Page 2 UNIT 2 REFUELING INFORMATION (Continued)

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

'(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 3012 Fuel Assemblies,52 Fuel Rods

8. The present licensed spent fue; pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2002 without full core offload capability.

September 1998 with full core offload capability.

I

.m , .. _ _ _ . _ . _ _ _ _ _ _ _ _ _ . . . - _ _ _ . _ _ - _ _ _ _ _ - -

UNIT SHUTDOWNS -

DOCKET NO. 50-277 -

UNIT NAME PEACH BOTTOM UNIT 2 DATE NOVEMBER 4,1996 -

COMPLETED BY PECO ENERGY COMPANY D. M. KILGORE '

PLANT ENGINEERING ENGINEERING DMSION PEACH BOTTOM ATOMIC POWER STATION REPORT IL*ONTH OCTOBER,1998 TELEPHONE (717)456-3412 .

METHOD OF CAUSE AND CORRECTIVE TYPE DURATION hEASON SHUTTING DOWN ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) PREVENT RECURRENCE 2 9810 S 745.0 C 2 REFUEL OUTAGE TOTAL HOURS 745.0 (1) (2) (3)

F-FORCED REASON METHOD '

S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL B - MAINTENANCE OR TEST 2 - MANUAL SCRAM C - REFUELING 3- AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN)

E - OPERATOR TRAINtNG + LICENSE EXAMINATION F - ADMINISTRATIVE G- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

. . . . , . . .. - . . - . . . - . - . . . . - . - . - . . ~ . . . . ~ . - . . ~ ~ . . . . - . _ . . - . .

4 Peach Bottom Atomic Power Station Unit 3 October 1 through October 31,1998 i

1. Narrative Summary of Operatina Experiences

! Unit 3 began the month of October at 100% power.

J 4 The unit operated at 100% for the entire month of October.

. Unit 3 ended the month of October at 100% power.

A k

I i

l i

l i

i l

Docket No. 50-278 Attachment to Monthly Operating Report for October 1998 UNIT 3 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

Reload 12 scheduled for October 1,1999

3. Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1999
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

1. Recirculating Pump Trip Modification to be Installed during 3R12 l
5. Scheduled date(s) for submitting proposed licensing action and supporting information.
1. Recirculating Pump Tnp has been submitted.
6. 'mportant licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

(a) The 292 new 3R11 bundles are GE 13 design new to Unit 3

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2777 Fuel Assemblies,16 Fuel Rods (292 new 3R11 bundles)

( one of the 2777 is a skeleton which contains less than a full complement l of fuel rods) l I

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed 1 storage capacity that has been requested .or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

l l

. Docket No. 50-278 Att:chment to Monthly Operating Report for October 1998 Page 2 UNIT 3 REFUELING INFORMATION (Continued)

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability.

I, I

UNIT SHUTDOWNS .

DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 DATE NOVEMBER 4,1998 =

COMPLETED BY PECO ENERGY COMPANY D. M. KILGORE ,

PLANT ENGINEERING ENGINEERING DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH OCTOBER,1998 TELEPHONE (717)456-3412 -

METHOD OF CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) PREVENT RECURRENCE TOTAL HOURS 6

(1) (2) (3)

F-FORCED REASON METHOD S-SCHEDULED A- EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL B- MAINTENANCE OR TEST 2-MANUAL SCRAM C- REFUELING 3 - AUTOMATIC SCRAM D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN)

E - OPERATOR TRAINING + LICENSE EXAM! NATION F- ADMINISTRATlVE G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)