Telecopy AO 75-68:on 751021,torus Makeup Sys Isolation Valve AO-3523 Found to Leak in Excess of 2,000 Cc/Minute.Cause Under Investigation.Corrective Action to Be Determined After Investigation
ML20086H081
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/21/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H079 List:
References
AO-75-68, NUDOCS 8401130408
Download: ML20086H081 (1)


Text

..

-~

!c y

i o,,

,o....

1

j c-1-----

-- ;,t )

n.;.---..

1.

.m.

i PHILADELPHIA ELECTRIC COMPANY Peach Botton Atonic Power Station l'.

Delta,. Pennsylvania 1731k October 21 1975 MF. James P.

O'Reilly, Director Office of Inspecticn and Enforcenent' Region 1

. p g h dih77 United States Nuclear Regulatory Connission 631 Park Avenue

~

King of Prussia, Pennsylvania 19h06

Subject:

Abnormal Occurrence 2k-Hour Eotif1 cation.

Confirming R.

S. Fleischmann's phone conversation with Mr. Walt Baunack, Region 1, United States Nuclear Regulatory Conmission,or October 21.1975

Reference:

License Number DPR-56 Technical Specification

Reference:

Table 3.7.h i.

deport so.:

Du-zyc-f>-co I. ',

Report Date:

October 21 19T5 Occurrence Date:

October 21, 1975 J

Facility:

Peach Botton Atomic Power Station R.D.

1. Delta, Pennsylvania 17314

{ ; -+'

l Identification of Occurrencer Excessive leakage thru the nitrogen inerting systen dryvell purge supply isolation valve AO-3523 - penetration N-25 Conditions Prior to Occurrence:

Reactor at 555 power.

3

.' Description of Occurrence:

During local leak rate testing, the torus makeup supply isolation valve A0-3523 was found to leak in excess of 2000 cc/ min.

1 Designation of. Apparent Cause of Occurrence:

Under investigation.

i Analysis of Occurrence:

The safety implications of,this occurrence are minimal because manual isolation valve was closed when the leakage was detected.

.t f." Corrective Action:

To be determined after investigation.

The manual isolation valve

}-.

was verified to be leak tight in the closed condition.

This valve vill be maintained.in the closed condition until repairs are I g('

completed.

I 1

Failure Data:

i

- I, Not applicable..

J g

Very truly yours,

,qpp %T d

l j

W.

T. Ullrich, Superintendent j

l Peach Botton Atomic Power Station t~

t (Jvs) 8 j

I I

l

.E..

8401130408 751031 1,.

~r' I..

PDR ADOCK 05000278 i'

i

+

s PDR 6

e p

e.g. an ora.e -

m.

p g

,.m.

~_-. _ _. __..--,._ _ _ _