ML20086G426

From kanterella
Jump to navigation Jump to search
Telecopy AOs 50-277-75-62 & 50-278-75-61:on 750920,main Stack Flow Transmitters Failed.Caused by Lightning Strike. Damaged Components Replaced
ML20086G426
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/22/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086G425 List:
References
AO-50-277-75-62, AO-50-278-75-61, NUDOCS 8401110395
Download: ML20086G426 (1)


Text

,

i I

(V)

~

.I j

PHILADELPHIA ELECTRIC COMPANY Peach Bottom Ato=ic Power Station Delta, Pennsylvania i??lk Mr. James P.. O'Reilly, Director

]

Office Of Inspection and Enforcenent 1.

Begion 1 United States suelear Regulatory Comnission, hg M4W}"%I.Cs(

631 Park Avenue King of Prussia, Pennsylvania 19kO6

Subject:

Abnornal Occurrence 2k-Hour Noti fi c ation Confirming V.

T. U11 rich's phone conversation with Mr. Robert McClintock, Region 1, United States 5uclear Regulatory Commission on September 21,1975

Reference:

License sunbers DPR kk and DPR-56 Technical Specification

Reference:

4.8.C.1 Report No.:

50-277-75-62 and 50-278-75-630 Report Date:

September 22, 1975 Occurrence Date:

September 20, 1975 Facility:

Peach Bottom Atomic Power Station R.D.

1, Delta, Pennsylvania 1731k

~

Identification of Occurrence:

d Failure of the main stack flow transmitters.

t j

. Conditions Prior to Occurrences i,

Unit 2 at about 555 power, Unit 3 shutdown.

Des'eription of Occurrence:

On the night of September 20, 1975, a lightning strike disabled both main' stack flow transmitters.

  • Designation of Apparent Cause of Occurrence:

Lightning strike.

l Analysis of Occurrence:

Flow rate prior to the strike was known and was being supplied by two i

dilution fans.

These fans rensined on during the short time that the f

transmitters were out of service, so total stack flow during this perioc is known.' This occurrence has minimal safety implications.

Corrective Action:

l The damaged conponents were replaced and the transmitters were returned to service.

I Failure Data:

i~

Previous failures of this type were reported as 50-277-75-51, 50-278-75-38, 50-277-75-5k, and 50-278-75 hk.

i I

v.

Very truly yours, j f & h g.e d f W.

T.

Ullrich, Superintendent Peach Botton Atomic Power Station 8401110395 750930 PDR ADOOK 05000277 PDR s