ML20086H046
| ML20086H046 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/26/1975 |
| From: | Ullrich W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20086H045 | List: |
| References | |
| AO-75-72, NUDOCS 8401130370 | |
| Download: ML20086H046 (1) | |
Text
'
s.
v f
i-w.
q AT i
f V,
i j
. v.,,
.. _.. -. _ ~
_g-
~~ y.,,.s.
s
.s.
L
- i
- y. "-
a.. a.,...
r.
.u..
a uw e n.n 3
. g.
PHILADELPHIA ELECTRIC COMPANY jg/
Peach Bottor. Ato=ic. Power Station j
Delta. Pennsylvanin 1731h November 26, 1975 l
Mr. Jame s P.
O'Reilly, Director L
Office of Inspection and.Inforcement
' Region 1
,' jUnited Statec Suelear Regulatory Co=cission 1,,631 Park Avenue
~
,,,, Ki~ng of Prussia. Pennsylvania 19406 S. bJer.t r.
Abner =al Occuaranee PL-Hour E ot i fi _c at i on
=
s e s s, 4 r. h s
_.ynyww r as;,1 ar y; ar-n.a.
' i,ua: =
r
-~w e -< r a
- Ehiled."I,"WniWFUdiid?M1eW X5TistNTileT--ie sien ~Ii/20/ 3'-
C ,Beferencem Jicense 3 d=T; c r = rr ; d
'. *d
"'echnical Specification
Reference:
1.5.A.1 c JReport 53.:
50-273-75-72
~
~
.l i P.ep ort Date:
November 26, 1975
't 10ccurrence Date:
Nove=ber 26, 1975
~~
L' Facility:
Peach Botto= Ato=ic Power Station i
^
R.3.
1, Delt a,. Pennsylvania 1731.
,[
Jdent.!fication of Occurrecee:
F l
MO-3-1t-26A, Core Spray yull Flow Test Valve failed to close-Oonditions Prior to Occurrence:
1 i, :
Unit 3 operatir.; at ST' Power.
Description of Occurrencer
.I During the perfor=ance of surveillance testing, MC-3-1L-26A failed tr j
'{
close fully with the
'A' and
'C' core spray pu=ps running at rated flev.
.. + -
Designation of Apparent Cause of Occurretec:
Broken wire on the closing torque'svitch in the valve op e rat.6r -
i P
Analysis of Occurrence:
The subject. valve is only used during perro: =ance of the Core Opray surveillance test.
It is nor= ally closed when the cyste= is in standby.
This failure is only significant during surveillance testi; and was identified during the surveillanr e test.
I==ediate-repair of the deficiency =ini=ises the cafety si6nificance of this event.
"8 Corrective Actio:i:
r, } :,
The broken wire was repaired and proper valve operation verifJc:1.
L
'. 1 Failure Data:
}
A previous failure of this type was reported as Abnor=al Occurrence
),.
l '
Beport Su=ber 50-278-75-51.
'.l ;
{
Very truly yours, l+
- Af*f $8. M
's
-)
W. T.
Ullrich, Superintendent
~l Peach Botto: Atc=ic Power Station
.{
3
. M F.
.:,yp g, arm, y rp t q V
39 fri ~. e g.:pp y
[
8401130370 751205 PDR ADOCK 05000278 S
PDR 1
.