PHILADELPHI A* ELECT'RIC COMPANY /
'"s i..,
Peach', Bottom Atomic Power Station
~~'
Delta, Pennsylvania i
17314 October 21, 1975 Mr. James P.
O'Reilly, Director Office of Inspectios and Enforcement-Region 1 United States nuclear Regulatory Commission hg d4uy2 631 Park Avenue King of Prussia, Pennsylvania 19k06
_3u b3 e c t :
Abnorcal Occurrence PL-Hour Notification, Confirming R. S.,F1eischsann's phone conversation with Mr. 'Jalt Saunack.
Re61on 1, United States Nuclear Regulatory Commission on October 21, 1975 Refe'rence:
License Number DPR Lk Technical Epecification
Reference:
Tables 3.1.1 and 3.2.0
' Report No.:
50-277-75-66 Report Date:
October 21, 1975 l occurrence Date:
October 20, 1975 Facility:
Peach Botton Atomic Power Station R.D.
1, Delta, Pennsylvania 1731h Identification of occurrence:
Y Upscale failure of the "B" logic APRM/RBM flow bias signal from yT-2-2-11CD.
Conditions Prior to occurrence:
)
About 555 power.
Description of Occurrence:
i One of the two inputs to the "B" logic recire flow converter failed
)
upscale.
This upscale failure raised the "B" logie ' APRM and RBM trip points'beyond those limits imposed by the Technical Specifications.
Designation of Apparent Cause of Occurrence:
Second ground on the.recire drive. flow transmitter' signal loop.
' Analysis of Occurrence:
s-This failure inhibited flow bias of the "3" APRM high flux scram, 3
however, scram would have occurred, although at a higher power level 4
I (not more than 120%) and therefore has minimal safety significance.
- Corrective Action:
A'"3" logic half sera = vas manually inserted until the flow signal could be repaired.
The flow signal was corrected by removing the installed 0
ground.
Loss.cf the remaining accidental ground vill not impare the flow signal to the neutron monitoring system.
Failure Data:
, j.,
'One previous reported as 50-277-75-30.
t
[7ery truly yours,
/fhf/
s
- '. T. Ullrich, Superintendent
=
Peach Bottom Ato=ie Power Station l
L
,(bic) 8401090724 7
{
-~ -