Telecopy AO 75-66:on 751020,logic Aprm/Rbm B Flow Bias Signal from FT-2-2-110D Failed Upscale.Caused by Failure of Second Ground on Recirculation Drive Flow Transmitter Signal Loop.Flow Signal Corrected
ML20086F958
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/21/1975
From: Ullrich W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086F955 List:
References
AO-75-66, NUDOCS 8401090724
Download: ML20086F958 (1)


Text

.. - -

o

!,3 0,:

_ D.

' z.

la

=

PHILADELPHI A* ELECT'RIC COMPANY /

'"s i..,

Peach', Bottom Atomic Power Station

~~'

Delta, Pennsylvania i

17314 October 21, 1975 Mr. James P.

O'Reilly, Director Office of Inspectios and Enforcement-Region 1 United States nuclear Regulatory Commission hg d4uy2 631 Park Avenue King of Prussia, Pennsylvania 19k06

_3u b3 e c t :

Abnorcal Occurrence PL-Hour Notification, Confirming R. S.,F1eischsann's phone conversation with Mr. 'Jalt Saunack.

Re61on 1, United States Nuclear Regulatory Commission on October 21, 1975 Refe'rence:

License Number DPR Lk Technical Epecification

Reference:

Tables 3.1.1 and 3.2.0

' Report No.:

50-277-75-66 Report Date:

October 21, 1975 l occurrence Date:

October 20, 1975 Facility:

Peach Botton Atomic Power Station R.D.

1, Delta, Pennsylvania 1731h Identification of occurrence:

Y Upscale failure of the "B" logic APRM/RBM flow bias signal from yT-2-2-11CD.

Conditions Prior to occurrence:

)

About 555 power.

Description of Occurrence:

i One of the two inputs to the "B" logic recire flow converter failed

)

upscale.

This upscale failure raised the "B" logie ' APRM and RBM trip points'beyond those limits imposed by the Technical Specifications.

Designation of Apparent Cause of Occurrence:

Second ground on the.recire drive. flow transmitter' signal loop.

' Analysis of Occurrence:

s-This failure inhibited flow bias of the "3" APRM high flux scram, 3

however, scram would have occurred, although at a higher power level 4

I (not more than 120%) and therefore has minimal safety significance.

  • Corrective Action:

A'"3" logic half sera = vas manually inserted until the flow signal could be repaired.

The flow signal was corrected by removing the installed 0

ground.

Loss.cf the remaining accidental ground vill not impare the flow signal to the neutron monitoring system.

Failure Data:

, j.,

'One previous reported as 50-277-75-30.

t

[7ery truly yours,