Monthly Operating Rept for Aug 1990 for Jm Farley Nuclear Plant
ML20059J170
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1990
From: Dennis Morey
ALABAMA POWER CO.
To:
Shared Package
ML20059J168 List:
References
NUDOCS 9009190203
Download: ML20059J170 (4)


Text

. . .

.4 0FERATING ER'th REIGtT s

DOCERT No. 50-348 Dh2E September 7, 1990 OtBIPLE'!W BY D. N. Morey

'IELEFIEEE (205)899-5156 _

OPEBETING STR'tUS Notes

1. Unit Name: Joseph M. Farley - Unit 1 1) Cumulative data since
2. Reporting Period: August 1990 12-1-77, date of
3. Licensed Thermal Power (79ft): 2,652 commercial operation.
4. Nameplate Rating (Gross PWe): 860

~

5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 866.1
7. Maximum Dependable capacity (Net MWe): 823.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net MNe): N/A
10. Reasons For Restrictions, If Any: N/A

'this Month Yr-to-Date Cummalative

11. Hours In Reporting Period 744 5,831 111,767
12. Number Of Hours Reactor Was Critical 744.0 5,766.9 86,025.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0 l
14. Hours Generator On-Line 744.0 5,752.5 84,462.7 l
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MNH) 1,971,720 14,759,645 215,913,561
17. Gross Electrical Energy Generated (MWH) 632,610 4,781,388 69,546,538
18. Net Electrical Energy Generated (MWH) 600,572 4,530,584 65,525,550
19. Unit Service Factor 100.0 98.7 75.6
20. Unit Availability Factor 100.0 98.7 75.6
21. Unit Capacity Factor (Using MDC Net) 98.0 94.3 72.7
22. Unit Capacity Factor (Using DER Net) 97.4 93.7 70.8

' 23. Unit Forced Outage Rate 0.0 1.4- 7.7 l 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A  !

1.5. If Shut Down At End Of Report Period, Estimated Date of Startupt- N/A

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06M7 08/09M7 INITIAL ELICTRICITY 08/20M7 08/18M7 00lWirJCIAL OPERATICH 12/01M7 12/0147 _

i Form 2/34 l

fEOSSA $888[ ,

1 1

._.___.__.m__.-__._____________________a-+_ -

-e w er-_u ___--er

r .

( .: .,

n i

i DOCKET NO. 50-348  ;

s UNIT 1 IATE September 7, 1990 l COMPLETED BY D. N. Morey l TELEPHONE (205)899-5156 _

Malmi August ,

IAY AVERAGE EAILY POWER LEVEL IAY AVERAGE IAILY POWER LEVEL

(PMe-Net) (MWe-Net) l 1 811 17 805 t 2 810- 18 787 i

3 811 19 805

?

4 -810 20' 807 __

i 5 808 21 808- ,

6 806 22 808 7 809 23 807  !

8 809- ' 24 806 -l 9 810 25 806  ?

t 10 811 26 806 ,

4 11 812 27 806 l 12 811 28 803-v 13- 812 29 802 .

i 14 811 30 807 j 15 808 31- 808 16 807

.c INSTRUCTIONS on this format, list the average daily unit power level'in MWe-Net for each day 'n l the reporting month. Compute to the nearest whole megawatt.

L 3

Form 13/21 i

, . . , . , , - , u. , . , , . . , ,

-y;y;; . - - - ~

-b..

UNIT SEUTDOWBS AND POWER REDUCTI N DoCEEf NO. ~50-348 UNIT ESME J. P. FARLEY - UNIT 1 ;-* '

  • DfCE September 7, 1996 CONF 12TED ST D. N. MostEY REPORT MONTE AUGUST TELEFoost (2651899-5136 I I I l l 1 NETwoD or I z.IcEsSEE I I I cAUSE a commEcTITE I I I I I DURATION I I SNUTTIlOG I EVENT I SYSTER I CORPOWENT I ACTIOS To I 2 2 5 imo. I Dart i TTFE I (novas) I mEASon i Dows mEAcTom' I mEroar e I cons
  • I cooE I r,EvEwT mEcUnmEscE I.

lThere were no unit shutdowns or significant power reductions during the month of August. 'I~ l l I I I I I I I I I I-I I I I I I I I I I I I i i l i I I I I I I I I I i i i i i i i i i i l' I I I I I I I i l i I i i i i i l i i i i i i i I i I i I .I I I l' I i I l I I I I l~ l i I I I i 1 1 I .. I I I I I I I I I I I i -

1 I I I I I I I I  ! 'l i I I I I I i I l- I -l l I I I I I I I I i .1 1 I I I I I I i i i I

.I- 1 I I- 1 i i i 1 l i 1 1 I I I I l- !_ i i i "I 1 l i I l' 1 .l- 1 I .I I l' i 1 I I i i i i l~

l' .I i l i i 1 -. I I I i

_ 11- I l. -l i I I I I l :I I l- 1 I I I 'l- I-  ! I 1.

F: Farced menson: Method: ' Eshibit G-Instructions-3: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 5-Maintenance or Test 2-Manual Scram. ' Entry Sheets for Licensee C-Refueling 3-Automatt: Scram. Event Report (12R) . File (NUREG-D-Regulatory mostriction 4-Other (Explain 1 4161)-

..E-Operator Training a License Examinatio" F-Administrative Exhibit I -Sese Source G-Operational Error (Emplain)

E-Other.(Explain)

M Run M

o '. i j

i JOSEPH M. FARLEY NUCLEAR PLANT i 1

ADDENDUM CONCERNING REVISION TO THE j OFFSITE DOSE CALCULATION MANUAL; I

l Revision 10 to the Offsite Dose Calculation Manual (ODCM) was approved by C the PORC on August 24, 1990. The ODCM vas revised to addrass comments made '

by the NRC in the Techn3 cal Evaluation Report of Farley's ODCM Rev. 7 prepared by BG&G Idaho In August 1989. Alabama Power Co. committed to the NRC to revise the ODCM. Since Rev. 10 is a general revision which affacts a majority of the pages, the entire ODCM is attached.

-1 It was determined by the PORC that these changes do not reduce the accuracy I or reliability of dose calculations or setpoint determinations. j The ODCM applies to Parley Nuclear Plant Units 1 and 2.