ML20059J170
| ML20059J170 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/31/1990 |
| From: | Dennis Morey ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20059J168 | List: |
| References | |
| NUDOCS 9009190203 | |
| Download: ML20059J170 (4) | |
Text
..
. 4 0FERATING ER'th REIGtT s
DOCERT No. 50-348 Dh2E September 7, 1990 OtBIPLE'!W BY D. N. Morey
'IELEFIEEE (205)899-5156 OPEBETING STR'tUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 1
- 1) Cumulative data since
- 2. Reporting Period:
August 1990 12-1-77, date of
- 3. Licensed Thermal Power (79ft):
2,652 commercial operation.
- 4. Nameplate Rating (Gross PWe):
860
~
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
866.1
- 7. Maximum Dependable capacity (Net MWe):
823.7
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net MNe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A
'this Month Yr-to-Date Cummalative
- 11. Hours In Reporting Period 744 5,831 111,767
- 12. Number Of Hours Reactor Was Critical 744.0 5,766.9 86,025.3
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0 l
- 14. Hours Generator On-Line 744.0 5,752.5 84,462.7 l
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MNH) 1,971,720 14,759,645 215,913,561
- 17. Gross Electrical Energy Generated (MWH) 632,610 4,781,388 69,546,538
- 18. Net Electrical Energy Generated (MWH) 600,572 4,530,584 65,525,550
- 19. Unit Service Factor 100.0 98.7 75.6
- 20. Unit Availability Factor 100.0 98.7 75.6
- 21. Unit Capacity Factor (Using MDC Net) 98.0 94.3 72.7
- 22. Unit Capacity Factor (Using DER Net) 97.4 93.7 70.8
- 23. Unit Forced Outage Rate 0.0 1.4-7.7 l
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 1.5. If Shut Down At End Of Report Period, Estimated Date of Startupt-N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08/06M7 08/09M7 INITIAL ELICTRICITY 08/20M7 08/18M7 00lWirJCIAL OPERATICH 12/01M7 12/0147 i
Form 2/34 l
fEOSSA $888[,
1 1
.m a-+
-e w
er-u m
--er
r
(.:
n i
i DOCKET NO.
50-348 s
UNIT 1
IATE September 7, 1990 l
COMPLETED BY D. N. Morey l
TELEPHONE (205)899-5156 Malmi August IAY AVERAGE EAILY POWER LEVEL IAY AVERAGE IAILY POWER LEVEL (PMe-Net)
(MWe-Net) l 1
811 17 805 t
2 810-18 787 i
3 811 19 805
?
4
-810 20' 807 i
5 808 21 808-6 806 22 808 7
809 23 807 8
809-
' 24 806
-l 9
810 25 806
?
t 10 811 26 806 4
11 812 27 806 l
12 811 28 803-v 13-812 29 802 i
14 811 30 807 j
15 808 31-808 16 807
.c INSTRUCTIONS on this format, list the average daily unit power level'in MWe-Net for each day 'n l
the reporting month. Compute to the nearest whole megawatt.
L 3
Form 13/21 i
u.
-y;y;;.
- - - ~
-b..
UNIT SEUTDOWBS AND POWER REDUCTI N DoCEEf NO.
~50-348 UNIT ESME J. P. FARLEY - UNIT 1 ;-* '
DfCE September 7, 1996 CONF 12TED ST D. N.
MostEY REPORT MONTE AUGUST TELEFoost (2651899-5136 I
I I
l l
1 NETwoD or I z.IcEsSEE I I
I cAUSE a commEcTITE I
I I
I I DURATION I I SNUTTIlOG I EVENT I SYSTER I CORPOWENT I
ACTIOS To I
2 2
5 imo.
I Dart i TTFE I (novas)
I mEASon i Dows mEAcTom' I mEroar e I cons
- I cooE I
r,EvEwT mEcUnmEscE I.
lThere were no unit shutdowns or significant power reductions during the month of August.
'I~
l l
I I
I I
I I
I I
I I-I I
I I
I I
I I
I I
I I
i i
l i
I I
I I
I I
I I
I i
i i
i i
i i
i i
i l'
I I
I I
I I
I i
l i
I i
i i
i i
l i
i i
i i
i i
I i
I i
I
.I I
I l'
I i
I l
I I
I I
l~
l i
I I
I i
1 1
I
.. I I
I I
I I
I I
I I
I i
1 I
I I
I I
I I
I
'l i
I I
I I
I i
I l-I
-l l
I I
I I
I I
I I
i
.1 1
I I
I I
I I
i i
i I
.I-1 I
I-1 i
i i
1 l
i 1
1 I
I I
I l-i i
i "I
1 l
i I
l' 1
.l-1 I
.I I
l' i
1 I
I i
i i
i l~
l'
.I i
l i
i 1
-. I I
I i
_ 11-I l.
-l i
I I
I I
l
- I I
l-1 I
I I
'l-I-
I 1.
F: Farced menson:
Method:
' Eshibit G-Instructions-3: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data 5-Maintenance or Test 2-Manual Scram.
' Entry Sheets for Licensee C-Refueling 3-Automatt: Scram.
Event Report (12R). File (NUREG-D-Regulatory mostriction 4-Other (Explain 1 4161)-
..E-Operator Training a License Examinatio" F-Administrative Exhibit I -Sese Source G-Operational Error (Emplain)
E-Other.(Explain)
M Run M
i o
j i
JOSEPH M. FARLEY NUCLEAR PLANT i
ADDENDUM CONCERNING REVISION TO THE 1
OFFSITE DOSE CALCULATION MANUAL; j
I l
Revision 10 to the Offsite Dose Calculation Manual (ODCM) was approved by C
the PORC on August 24, 1990. The ODCM vas revised to addrass comments made by the NRC in the Techn3 cal Evaluation Report of Farley's ODCM Rev. 7 prepared by BG&G Idaho In August 1989. Alabama Power Co. committed to the NRC to revise the ODCM.
Since Rev. 10 is a general revision which affacts a majority of the pages, the entire ODCM is attached.
It was determined by the PORC that these changes do not reduce the accuracy
-1 or reliability of dose calculations or setpoint determinations.
j The ODCM applies to Parley Nuclear Plant Units 1 and 2.
i i
j i
i h
l l
l l-1 i
l-j.
,,_-.. _ _