Second Interim Deficiency Rept Re Shop Welds on Heat Exchanger Vessels Supplied by Joseph Oates,Initially Reported 820324.Investigation & Evaluation Will Be Completed by 820611.Also Reported Per Part 21
ML20053E196
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/26/1982
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, CQAD-82-940, NUDOCS 8206070687
Download: ML20053E196 (2)


Text

<p .

~

Carolina Power & Light Company A ' Cg'?.

WO LO .

4 '4 May 26, 1982 9 39 FILE: SH N-2/18 CQAD 82-940 ITEM 75 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NOS. 50-400, 50-401 SHOP WELD DEFICIENCY ON JOSEPH OATES SUPPLIED HEAT EXCHANGERS SECOND INTERIM REPORT

Dear Mr. O'Reilly:

On March 24, 1982, the NRC (Mr. C. Julian) was informed that the subject item was considered potentially reportable per the provisions of 10CFR50.55(e) and 10CFR21. The intent of this letter is to inform you that due to difficulties in gaining access for engineering examinations and other pressing priorities, we have not been able to complete our reportability evaluation.

To date, three (3) of the ten (10) (Note: Initial notification incorrectly indicated there were nine (9) vessels) heat exchanger vessels have been examined. CP&L welding engineering personnel will continue to examine the remaining welds to determine the extent of the deficiencies. CP&L plant

engineering personnel will determine whether or not these. deficiencies are reportable under the provisions of 10CFR50.55(e) and 10CFR21. It is anticipated that the investigation and evaluation of this problem will be completed by June 11, 1982, at which time the NRC will be informed 'of the results of our evaluation.

Completion of corrective action will depend on the results of the evaluation and extent of rework required. If this item is deemed reportable, the NRC will be so notified and the projected date of completion of corrective action

!- provided through submittal of an interim letter.

Oyg1C W

.. ... .. . ~ , . , , . , ,

411 Fayettevole Street

  • P. O. Box 1551 e Raleigh N. C. 27602 b y 8206070687 820'd6 EI5FFNEI.fE WIT ~df1TG PDR ADOCK OV/0400 PDR dl0 S - . , _ _ . - , . . _ .

m Mr. James P. O'Reilly M2y 26, 1982

< g.

Thank you for your - consideration in this matter.

Yours very truly, N. angi - ager Engineering &. Construction Quality Assurance / Quality Control i