Confirms & Updates 800109 Discussions on Actions Being Taken Re Foundation Const & Water Control Measures.Requests Expiditious Review of 800108 Submittal Seeking Concurrence W/Erosion Preventive Actions
ML19260D877
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/06/1980
From: Ehrensperger W
GEORGIA POWER CO.
To: Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML19260D878 List:
References
NUDOCS 8002120546
Download: ML19260D877 (3)


Text

- . 3 _

~<

W. E Ehreru::erger Februa; v 6,1989 Mr. L. S. Rubenstein, Acting Chief Light Water Reactors Branch No. 4 Division of Project Management U.S. fluclear Regulatory Conmission Washington, D.C. 20555 NRC DOCKET flV"BERS 50-424 AtlD 50-425 CONSTRUCTION PERMIT NU'iBERS CPPR-108 AND CPPR-109 ALVIN W. V0GTLE NUCLEAR PLAf!T - FOUNDATION CONSTRUCTION Afl0 MATER CONTROL "EASURES

Dear f1r. Rubenstein:

In accordance with Mr. Carl Stahle's recent reouest to Mr. J. A. Bailey, Southern Company Services' Vogtle Project Licensing flanager, we are confirm-ing our January 9,1980 discussions in your Bethesda offices and we are providing a general update on the matters discussed.

At this meeting, representatives from Southern Company Services, Georgia Power Company and the NRC discussed the actions being taken concerning the foundation construction and water control measures at the Vogtle site. A list of the attendees and an outline of the presentation are enclosed.

A presentation describing the conditions at the site was given and letter number GM-544 dated January 8,1980, containing eight (8) attachments, des-cribing actions to be taken on the above subject was distributed. We requested an early review and concurrence on the foundation work and control measures outlined in the attachments noting that proceeding with these activities was considered to be the best preventative to further erosion.

In accordance with agreements reached at the meeting we confirmed various procedures and commitments relative to the surveillance and monitoring acti-vities associated with the foundation construction and water control measures in our January 10, 1980 letter (Gft-546) to J. P. O'Reilly, a copy of which you earlier received and is attached for your reference.

On January 11, 1980 we received verbal notification from the Office of Inspection and Enforcement in Atlanta to operate our suppleraental ground-water dewatering system contingent upon certain modifications to our piezo-meter plan inside the powerblock. This was verified in writing in P1r. J. P.

O'Reilly's January 14, 1930 letter (attached).

1950 174 Y

%\

[ 8002180 5W

Mr. L. S. Rubenstein February 6,1980 Page 2 On January 18, 1980 we received verbal concurrence from the Office of Inspection and Enforcement in Atlanta to resume work in a limited number of areas as verified in writing by Mr. J. P. O'Reilly's January 22, 1980 letter (attached.)

Operation of the supplemental groundwater dewatering system was begun on January 22, 1980 after an appropriate baseline survey was made in conjunction with the supplemental settlement monitoring program. Operation of the system is still in process. Since January 22, 1980 we have received approximately 2.3 inches of rainfall at the Vogtle site.

Your arranging of the meeting and your participation and that of key staff personnel is very much appreciated. We solicit your continued cooperation in achieving a full and expeditious review of our January 8,1980 submittal so that we can move forward with the necessary foundation work and associated ground and surface water control measures to minimize any further erosion.

Yours very truly, O C( ,

6 - .'d . &,c/: w a ./: '.) ~~ -

W. E. Ehrensperger WEE /tp cc: J. P. O'Reilly R. A. Thomas D. E. Dutton J. A. Bailey K. M. Gillespie B. L. Lex G. F. Trowbridge, Esq.

1950 175

JANUARY 9, 1980 MEETING - V0GTLE PROJECT Attendees List Robert Jackson NRC/GSB/ DSS Dominic Vassallo MRC/DP!1 Carl Stahle NRC/DPkt James Knight NRC/ DSS Bob Shewmaker NRC/I & E Headquarters Les Rubenstein NRC/DP!1 Joe Kane NRC/GSB/ DSS Ted Johnson NRC/HPS/ DSS Owen Thompson NRC/GSB/ DSS Floyd Cantrel NRC/I & E Jack Harris NRC/I & E .

D. L. McCrary SCS - Executive Vice President R. A. Thomas SCS - Vice President J. A. Bailey SCS - Vogtle Project Licensing Manager W. E. Ehrensperger GPC- Seni r Vice President Doug Dutton GPC/SCS - General Manager, Vogtle Project H. H. Gregory GPC - Assistant Construction flanager, Vogtle B. L. Lex Bechtel - Project Manager, Vogtle it. R. Thaker Bechtel - Assistant Project Engineer W. R. Ferris Bechtel - Chief Soils Engincar D. E. Armstrong Bechtel - Field Civil Engineer R. Y. Bush Fugro, Inc. - Principal Engineer (Dewatering Consultant to Bechtel/GPC) 1950 l76