Georgia Power Company Post Office Box 4545 bA
(
Atlanta, Georgia 3o3o2 Vogtle Proj,ect Tefephone 404 522-606o Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6o11 January 10, 1980 United States Nuclear Regulatory Commission File: X7BG31 Of fice of Inspection and Enforcement Log: GM-546 Region II - Suite 3100 101 Marietta Street Atlanta, GA 30303 Attn:' Mr. James P. O'Reilly
Reference:
RII:FSC; 50-424; 50-425 Confirmation of Concurrence letter from NRC dated November 29, 1979 Gentlemen:
Further to our letters of November 15, 1979 (GPc526); November 21, 1979 (GM-528); November 29, 1979 (GM-530); December 6, 1979 (GM-531);
December 12, 1979 (GM-534); December 13, 1979 (GM-535); and January 8,
(
1980 (GM-544); and, in accordance with a meeting yesterday with bota NRC I & E (Region II and Headquarters) and NRR personnel in NRR's Washington offices, we are submitting the following information:
1.
An individual from Bechtel's Geotechnical/ Soils area will be assigned to the Vogtle jobsite on a full-time basis to perform the surveillance activities outlined in section III-A-9 of Attachment #1 to our January 8, 1980 transmittal. This individual will also oversee the monitoring activities associated with the operation of our supplemental groundwater dewatering system and..ill be on te when its operation is initiated.
Until a lons -term assignment has been effected, we will utilize the services of an individual from Bechtel's geotechnical group already at the Vogtle site who is available immediately to perform the activities in question.
When, in our judgment, it is no longer required to have this type expertise at the site on a full-time basis we will notify the Region II I & E principal inspector for Vogtle.
With respect to the monitoring program associated with operation of our supplemental groundwater system (Attachment #3, part III-B), the following additional procedures will be implemented:
(
1950 180 8002120 55 Cm
f1r. James P. O'Reilly Page 2 January 10, 1980 2.
Approximately one (1) gallon water samples shall be taken fron the system at the 1st, 4th, 8th, 16th, and 24th hours following initial onaration; thereafter, daily samples will be taken.
.ne fi, st five samples and, thereafter, one in each succeeding series of five samples shall be retained
, until reviewed by the fikC at the Vogtle site.
3.
If we obtain a visual show of fines in any sample after 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />' operation, we will run a test with test results reviewed within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
If test results reveal greater than 5 ppm, the system will be shut down, the flRC Region II office notified, and the results e'.aluated prior j
to resumption of operation.
This response contains no proprietary information and may be placed in the flRC Public Document Rooms upon receipt.
Yours very truly, I
d m
A m -.
Doug Dut on
(
Project General llanager DED:db cc: Mr. J. H. Mill er, Jr.
Mr. W. E. Ehrensperger Mr. R. E. Conway
.Mr. K. fl. Gillespie Mr. E. D. Groover fir. R. Staffa Mr. J. A. Bailey Dr. M. Z. Jeric Director of fluclear Reactor Regulation Attn:
L. Rubenstein Division of Project Manageraent U. S. flRC Washington, D.C.
20555 (Ref:
flRC Docket flumber 50-424/50-425 Construction Permit l lumber CPPR-108 & CPPR-109 1950 181
<