Text

_ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS JULY, 1980 There were three unit chutdowns (one continued from 6/30/80) and two power reductions in the month of July.

The following safety-related maintenance was performed in July:

1. Replaced bearings and seals on 'B' Waste Gas compressor.
2. Replaced bottom bowl assembly, all shaft couplings and two shaft sections on No. 10 River Water Pump.
3. Replaced '1B' Charging Pump inboard seal due to excessive leakage.
4. Performed PCR/PCN 80-679, delete "Close on Safety Injection Actuation Signal (SIAS) Auto Close" on four centrifugal charging pump mini-flow valves.

i

.8008ISOypf

t OPERATLNG DATA REPORT -

. ' DOCKETNO. 50-348 DATE8 80 COMPLETED BY W. G. Hairs to:1, III; TELEPHOqg (20n s99-5156 Notes

1. Unit Name. Joseph M. Farley - Unit i 1/Ct=ulative ddata'since *
2. Reporting Period: Julv. 1980 12/1/77, date of connercial
3. Licensed Thermal Power (MWt): 2652 . Operation.

, 4. Nameplate Rating (Gross MWe): 860 -

5. Design Electrical Rating (Net MWe): 829 _

e 6. Maaimum Dependable Capacity (Gross MWe): 844.6 - *

7. Maximurn Dependable Capacity (Net SIWE): 803.6
_
8. If Changes Occur in Capacity Ratings (Items Nwnber 3 Throug : 7) Since Last Report.Give Raasons: '7 NA

..g .

9. Power Level To Which Restricted. lf Any (Net MWe): NA ,
10. Reasons For Restrictions. If Any: NA l

l This batit Yr.rto Data. Camalatise.

I~ 11. Hours In Reporting Period . .

744 5,111' - ~

' 23,375

12. Number Of Hours Reactor Was Critical 481.0 4,006.1 14,941.6
  • 13. Reactor Reserve Shutdown Hours '62.3 904.2 2,309.5
14. Hours Generstor Oh -468.9 3,930.1 14.520.6 .
15. Unit Reserve Shutdown Hours -
16. Gross Thermsl Energy Generated (MWH) -

1.201.138.6 9,982.482.,9_ 36.580.497.3 .-

17. Gross Electrical Energy Generated (MWH) 373,R4R_ 3J19'6A g_ ~11.7%g -

IL Net Electrical EnerEy Generated (MWH) 348;078- 3,012,002 11.016.010

. 19. Unit Service Factor 61.0 76,,9

.. , 62.1

20. Unit Availability Factor 63.0 76.9 62.1
21. Unit Capacity Factor (Using MDC Net) -

58.2 -

73.3 58.6

, 22. Unit Capacity Factor (Using DER Net) 56.4 71.1 56.6 -

23. Unit Forced Outate Rate 11 7 4.9 6.7
24. Shutdowns Scheduled Over Next 6 Mondu (Type. Date.,and Duration of Each n

, Refueling Outage: Late September. 1980: aooroximatelv 8 weeks .

25. IfShut Down At End Of Report Period. Estimated Date of Startup: August 1. 1980 .
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiewd INITTAL CRITICALITY 8/6/77 -

..' .8/9/77

, INITIAL ELECTRICITY 8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 ,. 12/1/77

  • ~

M77 l -

_ , , _ . - - - - - - - . - - - . . _ - , - - - . - - - - - - - - - ~ - - .

. i AVERAGE DAILY UNIT POWER LEVEL  ? I

l

. DOCKETNO. 50-348 UNIT I

. . DATE 8/1/80 COMPLETEDB'l W. G. h irston, III

/ TELEPHONE (205) 899-515_6 MONTH Julv DAY AVERAGE DAILY POWER LEVEL ~

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 37 ,

789 2 .

33 788 3 g, 786 4 20 790 5 21' 788 6 784 22 7 788 23 ,

3 790 24 9 25 789 10 382 26 780 11 653 782-27 12 775 788 23 13 783 2, 344 14 783 30 15 784 33 16 .

786 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

. (9(77) 4 .

e

%e-- H  % --as=-a K- n , _.. A s% ,, * *

? --

IlNil SlHJIIHlWNS AND POWER RtlRJCllONS IMICKEl NO. 50-348

  • IJNil'NAME J.M.Farlev - Unit .1 DATE 8/1/80 COMPLEIEll BY W. G. ifairston, III REPOR I' MON g gg July TEl.EPflONE (205) 899-5156

= c

, ,$g 'h -* E5 1. (ensee [g t Cauw & Coirettive No . Date R 3@ f; j g5- 1: vent gy {3 gO Atisina to M yI $ 3 ;f3 c Reputtu vi O o Pievens Recussence e ) u c5 047 800701 S 200.7 B 1 N/A CC llTEXCll Continuation of Unit Outage froin 6/30/8 0' to repair "B" Steam Generator tube leakage.

~

048 800709 F 13.4 C 3 N/A CC llTEXCll Unit tripped due to S/G 1A low-low levo 1.

Operator lost level while in manual feedwater control during plant startup.

049 800710 F N/A A N/A N/A 1111 M030RX Unit held at 700 MWe due to only two condensate pumps operable. Motor replaced on IB condensate pump.

0%0 800726 S N/A B N/A N/A IIA VALVEX Unit w.is reduced to and held at 770 MWe for Main Turbine Governor Valve Testing .

I 2 .I 4 Il 1:osteil Re.ason : Meilnul: thinbit G - Insisistis wis S. Stheduleil A l'ipupnient I ailuie (I splain) 1 -Manual foi Picpasation of Data 11 M.iintenance or Tes 2-Manu.il Sciani. 1: iss) Sheets foi lxensee .

O. Refueling .l- Autonoise St sam. Event Repois I,I l'H) 17s te iNilRI G-D Regniatory Hesisi.:iion 4 Olhes (Expl.iin) 0101)

I Opesaios liaining & license i umination

~

12.Adnuni:isative 5 G Ope ational 1 nus linplain) 1.sinbit i . S.une Somce l'J/ 7 / ) 11 Othe s llapt.un) 4

s b

DOCKET NO. 50-348 ."

  • UNIT SiltTIIK)WNS AND POWER REI)UCilONS UNIT NAME J.M. Farley - Unit 1 DATE 8/1/80 July COMPLETED BY W. G. Ilairston. III REPORT MONTil TELEPHONE (205) 899-5156

- B E

, .$ E 3j $ EE Licensee ,E e, D, Caine & Corrective No. Dale g 3g jg5 Event 3'g gi Action to H j= 5 e

~yc

~ Report

  • mO o' u Prevent Recurrence 051 800729 F 61.0 A 3 N/A IIA PIPEXX Unit tripped due to an electrohydrauli  :

fluid line break to #4 (bvernor Valve on the high pressure main turbine which caused IB SGFP to trip on low Ell fluid pressure. This resulted in a steam /feedwater flow mismatch coincident with S/G low level Reactor Trip.

I 2 1 4 17: Forced Reason: Method: Exhibit G. instsuctions S: Stheduled A Equipment Fadure(fixplain) 1 Manual for Piepaiation of Data ll Maintenance oi Test 2-Manual Sciam. Entry Sheets for Liecusee -

C-Refueling .1- Autunntic Scram. Event Repost (LER) File (NURLG-D Regulatory Resisiction 4-Ot her (Explain) 0161)

E-Operator Tsaining& thenw lixamination F Administrative 5 G-Operational 1 non (Esplain) Exinbit I Saur.' Source lis/77) ll Other ( Explain)