ML19331B840

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Jul 1980
ML19331B840
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/08/1980
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19331B841 List:
References
NUDOCS 8008130406
Download: ML19331B840 (1)


Text

. _ _ . _ _ _ _ _ _ _ _ _ _

Alabama Power Company eOO Nortn 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 250-1000 F. L CLAYTON, JR.

m Senior Vice President Alabama Power the sournem electrc system August 8, 1980 l

Docket No. 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthlv Operating Data Report Attached are two (2) copies of the July,1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very,truly, ,

f.9 M-

' J [ lpl V C (,'.~j g 4 F. L. Clayton, Jr.

FLCJr/JRC:bhj [

Attachments  :

cc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) 0%

s

//

THIS DOCUMENT CONTAINS 8008I3o$06 POOR QUAUTY PAGES

(