RO-77-33:on 770406,absolute Position Indicator for Rod 5, Group 8 Failed.Caused by Amphenol Connector Faulty Pin Connection.Connector Repaired & Indicator Restored to Operation
ML19308D528
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/28/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19308D524 List:
References
NUDOCS 8002280966
Download: ML19308D528 (2)


Text

_ _____ _ ____ _ _ ______

LIUliNUbb EVENI liLPUH I

.I ..

.

.i - CONTROL ULOCK:l , l l l l l (PLcAss en!NT f.LL REQUtnED IrJrOfL.1 AT;0N,'

}, 1 U

'?15!' terns. NuoCcn

- -

'i!N' '"v',"E T

'

!

vi r i ci ni gl ,l 10101-10101010101-1o101 14 I 11111111 1013]

7 09 14 in 25 26 30 31 32

. .a.ttcCnv "7p7 Sc';M T

"

DOCKET NUMOCR EVENT Daft RCPoRf DATC ECON r l ! LkJ Lt_1 lo is I ol-l o 1,1012 I lo la in I61717I InialvIa17 lv i 7 6 57 50 SU 60 61 68 69 74 75 UO i EVENT OESCniPTION HE l Normal Mode I operation, inoperable position indicator for Rod 5. Group 8 ( ASPR's) con- I 7 09 60 !

HE I trary to Technical Specification 3.1.3.3. No redundant systems available. First occur- ll '

7 89 80 C4 l 7 89 rence of this type. Complied with Technical Specification Action Statement 3.1.3.3.A.2.B.

60 !

ll hl System restored operable on 8 April 1977.

'

I 7 U9 60 l gl (LER-77-33) lJ 7 89 prtue 60 CE CONE COMPCNENT CCCE y A vet.ATON O7 lI l Dl W 7 89 10 11 l Il Nl Sl Tl Rl Ul 12 17 W 43 44 l A l3 l 8l0 l 47 lN l 48

.

CAUSE CESCRIPTION j8 5.

@l Inoperable absolute position indicator caused by amphenol connector faulty oin connection. I

'

7 89 00 3l l Connector was repaired and operability restored.

80 I

7 JL9 l I

'

STA  % POWER OTHER STATUS OtSCOVERY CfSCOVERY CISCR:PI;CN

@

70 9 W l 017l 4 l l 10 12 13 N/A I 44 I Al 45 I

46 N /.*

80 I

'

A .N C EASE AMCUNT OF ACTfVITY LOCATCN OF AELEASE IIE 7 8 9 W Wl 10 11 N/A l 44 l

45 N/A EO l

j PERSONNEL EXPOSURES  ;

NUMtf(R TYP6 CESCRIPTON 13 l0l0l0l [Zj l N/A l 7 89 11 12 13 DO PERSONNEL IN.URIES NuuotR otScTupTON h l0l0l0l 7 89 11 12 l N/A 00 l;

i OFFSITE CONSEQUENCES 1 l N7A

  • j '

7 00 LO ,

LOSS On OAMAGE TO FAC:LITY i TYPE DECCTtiPTON .

1i 7 u9

{ 10 l N/A -

00 I

PUQUCITY 1

l N/A  ! l 7 0D CU l O!TIONAL FACTORS See attached Supplementarv Information 8 0 02 260 ff( . .l .

> 00 u's

." ' ' . .

7 uU aus W P. Stewart

.

{7 psONt; (813) AAA-alco NAMC:

j . _ cro .,,...,

. _ _

.

~

.

'

, , SUPPLEMENTARY INFORMATION 1

>

1. Report No.: 50-302/77-33
2. Facility: Crystal River Unit #3
3. Report Date: 28 April 1977

.

4. Occurrence: 6 April 1977
5. Identification of occurrence:

In the process of moving Group 8, Axial Power Shaping Rods (APSR's),

the absolute position indicaor for Rod 5 failed causing a condition contrary to Technical Specification 3.1.3.3.

6. Conditions Prior to Occurrence:

Normal Mode I operation. -

7. Description of Occurrence: 2 At 0812, while adjusting a power imbalance wit! Group 8 Rods, absolute pcsition indicator for Rod 5 failed. Rod posi*. ion was verified by the Rod Zone Limit Switch. Commenced logging position agreement between r reference indicator and the operable position indication as per SP-300.

l ( Position indicator for Rod 5 was restored operable during shutdown on 8 April 1977.

8. Designation of Apparent Cause of Occurrence:

The amphenol connector to the position indicator was found to have a faulty pin connection.

-

9. Analysis of Occurrence:

There were no safety implications as the Reactor could have been safely shut down at any time.

10. Corrective Action:

The amphenol connector was repaired and absolute position indicator for Rod 5 of Group 8 was restored operable.

11. Failure Data: