3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With
ML20199E385
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/31/1998
From: Dao T, Pardee C
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0199-05, 3F199-5, NUDOCS 9901200411
Download: ML20199E385 (5)


Text

- - . . . . .

~

Flrrida Power 2%"2I?,"

o"d."anYu#.i no. own

' January 13,1999 3F0199-05

. U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report

Dear Sir:

Attached is the Crystal River Unit 3 (CR-3) December 1998 Monthly Operating Report. This report is 'being submitted in accordance with the CR-3 Improved Technical Specifications 5.7.1.2. I If you have any questions regarding this submittal, please contact Mr. Sid Powell, Manager, Nuclear Licensing at (352) 563-4883. i Sincerely, ,

j rdee Director, Nuclear Plant Operations I

CGP/ff  ;

Attachment- l t

xc: Regional Administrator, Region II Senior Resident Inspector .h- q i NRR Project Manager p

. 9901200411 981231 l l FDR ADOCK 05000302 l T

M' R PDR ' , ,a s )

CRYSTAL RIVER ENERGY COMPLEX: 15780 W. Power Line Street

  • Crystal River, Florlds 34428-6708 + (352)7954486

.. A Florida Progress Company  ;

r. .

. OPERATIN3 DATA REPORT i

c DOCKET No. 50-302 f

UNIT FLCRP-3 DATE January 5,1999 . .

COMPLETED BY T V Dao M g TELEPHONE (352) 795-64M OPERATING STATUS

1. UNIT NAME:.. . . . . . . . . . . ... . . . CRYSTAL RIVER UNIT 3 '
2. REPORTING PERIOD:. . .. . . . . . . DECEMBER 1998
3. LICENSED THERMAL POWER (MWt):... 2544
4. NAMEPLATE RATING (GROSS MWe):. . . . . . . . . 890
5. ' DESIGN ELECTRICAL RATING (NET MWe):. . . . . . . . 825 6.- MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):. 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):. 818'
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWo): N/A

'10. REASONS FOR RESTRICTIONS,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 8,760.0 -191,136.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,908.4 125,324.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 ,1,280.6 I
14. HRS GENERATOR ON LINE 744.0 7.778.2 123.106.9
15. UNIT RESERVE SHUTDOWN HOURS 0.0- 0.0 0.0

' 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,889.665' 19.546.888 - 288.394.099

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 662.587 6.799.299 98,693.332 '
18. NET ELECTRICAL ENERGY GENERATED (MWH) 633.647 6,481,868 93,884,252
19. UNIT SERVICE FACTOR 100.0 % 88.8 % 64.4 %
20. UNIT AVAILABLE FACTOR 100.0 % 88.8 % 64.4 %

21 UNIT CAPACITY FACTOR (using MDC net) 104.1 % 90.5% 60.7 %

' 22. UNIT CAPACITY FACTOR (uSing DER net) .103.2 % 89.7 % 59.5 %

23. UNIT FORCED OUTAGE RATE 0.0% 10.9% 21.3 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP; N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA l

I l

l l l.. l l AVERAGE DAILY UNIT POWER LEVEL i 1

[ l l

DOCKET NO. 50-302 UNIT FLCRP-3 DATE January 5.1999 COMPLETED BY T V Dao l

[- TELEPHONE (352) 795-6486 l s-  !

l I

i l

MONTH DECEMBER 1998 1 I

i i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL I (MWe-Net) (MWe-Net) 1 853 17 853 2 853 18 852 3 853 19 853 l 4' 854 2') 852 l l 5 853 21 852  !

6 853 22 853 7 853 23 853 l

8 826 24 852  ;

9 852- 25 853 10 853- 26' 853 11 852- 27 852 ,

12 853 28 852 l 13 >853 29 853' 14 853 30 852

l. 15 853 31 852-16 853 l INSTRUCTIONS:

l On this format, list the daily average unit power level in MWe-Net for each day in the

. reporting month. Compute to the nearest whole megawatt.

l.

i i

UNIT SHUTDOWNS AND POWER REDUCTIONS - J DOCKET NO. = 50-302 UNIT FLCRP .

REPORT MONTH. DECEMBER 1996 DATE January S.1999 COMPLETED BY . T V Dao TELEPHONE (352)795-6486 NO. DATE TYPE (1) DURA 110N REASON (2) METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT DOWN REACTOR (3) REPORT # RECURRENCE 98-26 981208 S 0 B 5 N/A HA GENERA Reactor power was reduced to 92% to support modification functional testing -

of the Power System Stabilizer.

1 2 3 4 5 F: FORCED REASON: METHOO EXHIBIT G - INSTRUCTIONS EXHIBIT I- SAME SOURCE S: SCHEDULED A-EQUIPMENT FA! LURE 1-WANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C-REFUELING 3-AUTO SCRAM EVENT REPORT (LE7g FILE DMGULATORY FESTRICTION 4-CONTINUED (NUNG-0161)

E-OPEPATOR TRAINING & S-REDUCED LOAD LICENSE ADMINISTRATION 9.OTHER F-ADMINfSTRATION G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER

r

'4 MONTHLY OPERATIONAL

SUMMARY

STATEMENT  !

I i

DOCKET NO. 50-302 UNIT FLCRP-3 )

DATE January 5,1999 COMPLETED BY T V Dao 1

TELEPHONE (352) 795-6486 MONTH: DECEMBER 1998

SUMMARY

STATEMENT:

i l

Crystal River Unit #3 operated at full power for the month of December l with the exception of a power reduction on 12/08 to support modification functional testing of the Power System Stabilizer.  !

l l

i i

l