SUPPLEMENTARY INF0Pf1ATION 1.
Rep' ort -No. :
50-302/80-014/04L-0
.2.
Facility:
Crystal River. Unit No. 3 3.-
Report Date:
March 21, 1980
- 4.
.0ccurrence Date:
4th quarter 1979 (discavered:' 21 February 1980)
'(conf"i rmed : 13 March 1980)
.(detemined at plant: 18 March 1980) 5.
Identification of Occurrence:
A single measured value of radioactivity concentration in a critical pathway envircnmental medium samples exceeds ten (10) times the con-trol station value as defined in Appendix 3, Section 3.2.
6.
Conditions ' Prior to Occurrence:
-N/A 7.
Description of Occurrence:
The air c,oncentration for Thorium-232 of 0.2 pCi/m3 was greater than ten -(10) times the pre-operational level -of 0.008 pCi/m3 at sampling station-C-41.
3.
. Designation of Apparent -Cause:
. The apparent cause of the occurrence was a coal slag pile, located six
,(6). meters south of. the air samoler at station C-41.
The concentra-tion of. Thorium-232 was approximately.'1230 pCi/Kg in the soil sample at the coal slag pile.
Soil concentration during the previous ' two years has been 49 pCi/Kg or less.
Therefore, the increased air con-centration is attributed to the increased concentration from the coal siag pile.
9.-
Analysis of Occurrence:
The ~. occurrence was not a result of the operation of Crystal River
~ Unit 3.
- 10. - Corrective Action:
Remedy of this situation by relocation of the coal slag pile or re-location of sampling '~ station -C-41 outside the influence of the coal slag pile is under = study.
11.
Fail ure' Date:
.This is the first. report' for this type occurrence.
(Hill *(LER)0N62 8003240 h 7
.