ML20195F497
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/31/1998
From: Dao T, Pardee C
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F1198-05, 3F1198-5, NUDOCS 9811200012
Download: ML20195F497 (5)


Text

- _ . , . . . . -.- --. . .

i '

~

Ficrido

!, Power 1

? .".TSJ.L." l C

  • M;O.'*!.u om n '

I l

1 l

1 November 13, 1998 i

3F1198-05 '

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Monthly Operating Report i

Dear Sir.

l Attached is the Crystal River Unit 3 (CR-3) October 1998 Monthly Operating Report. This l report is being submitted in accordance with the CR-3 Improved Technical Specifications 5.7.1.2.

If you have any questions regarding this submittal, please contact Mr. Sid Powell, Manager, Nuclear Licensing at (352) 563-4883. l Sincerel C. G. Pardce

' Director, Nuclear Plant Operations i

CGP/ff Attachment xc: Regional Administrator, Region II ,

Senior Resident Inspector NRR Project Manager gg l

l 9811200012 9810s1 1 PDR ADOCK 05000302 R PDR -; t n

CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power Line Street a Crystal RNor, Florida 344284708 + (352) 7954488 A Florida Progress Company

..-. OPERATING DATA REPORT DOCKET NO, 50-302 UNIT FLCRP-3 DATE November 2,1998 COMPLETED BY T V Dao M - t -e TELEPHONE (352) 795-6486 OPERATING STATUS

1. : U NIT N AM E: . .. . ... .... . . .. . . . .. . .. . ... . . . . . . . ..... ... .. . . . . . .. .. . . . CRYSTAL' RIVER UNIT 3 :

' 2 REPORTING PERIOD:= .. ..... .. .. ...... .. ........ OCTOBER 1998 6

3. LICENSED THERMAL POWER (MWt):........ ........... .. .. 2544-4.! NAMEPLATE RATING (GROSS MWe):....... .1890=

5.' DESIGN ELECTRICAL RATING (NET MWe):.... ....... ... 825 6;- MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):. 860 -

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):.. . ... 818 ::

. 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER S THROUGH 7) SINCE LA8T REPORT. GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): N/A
10. REASONS FOR RESTRICTIONS,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE

-p 2

11. HOURS IN REPORTING PERIOD -745.0 1 7,236.0 - '189.672.0 i
12. ' NUMBER OF HOURS REACTOR WAS CRITICAL ' 745.0 e  : 6.444.4 -

':123.860.6 :

13. REACTOR RESERVE SHUTDOWN HOURS /0.0i 0.0 : 1.280.6 E
14. HRS GENERATOR ON LINE '745.0 : ?6.314.2' 121,642.9 '
15. UNIT RESERVE SHUTDOWN HOURS s 0.0 -0.01 ' O.0

' 16. GROSS THERM AL ENERGY GENERATED (MWH) : '1,890.317 ! 115,837.108 - 284.684,318 J

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 661.718 : 5.498.501 97,392.534 '

- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 631,973-- 5,237,733 = 92,640,117i

19. UNIT SERVICE FACTOR -.100.0% 86.5 % 64.1% -

. 20. UNIT AVAILABLE FACTOR 100.0 % 86.5 % 64.1 %

21. UNIT CAPACITY FACTOR (using MDC not) -103.7 % < 87.8% > 60.4%
22. UNIT CAPACITY FACTOR (using DER net) 102.8 % ' 87.0% 59.2 % j
23. UNIT FORCED OUTAGE RATE 0.0% 13.1 %, 21.5 %
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):

None

25. - IF SHUTDOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP: N/A *m
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

THIS ITEM 18 NOT APPLICABLE TO CR-3 FORECAST ACHIEVED l INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA

. COMMERCfAL OPERATION NA NA i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE November 2,1998 COMPLETED BY T V Dao TELEPHONE (352)795-6486 MONTH OCTOBER 1998 m

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) l i

1 848 17 841- )

2 -848 18 '850~

3 847 19 850-4 846- 20 850 l 5 845: 21 850: )

6 845: 22 850--

7 844 23 852 8 844' 24 854 -

9 -845: 25 ;851 10 ~848- 26 851 11 '847: 27 852-12 847' 28 853-13 847 29 852' , ,

14 847- 30 852 15 848 31 852.

16 '846-INSTRUCTIONS:

On this format, list the daily average unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-302 UNIT - FLCRP-3 REPORT MON 1R. OCTOBER 1998 DATE November 2.1998 COMPLETED BY T V Dao TELEPHONE (352)795-6486 ,

NO. DATE TYPE (1) DURATION REASON (2) METHOD OF UCENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE HOURS SHUTTING EVENT CODE (4) CODE (5) ACTION TO PREVENT ,

DOWN REACTOR (3) REPORT # RECURRENCE 98-23 981017 S 0 B 5 N/A HA VALVEX Reactor power was reduced to 89% to perform main turbine valve testing.

[

i 1 2 3 4 5 F: FORCED REASOft METHOO EXHIBIT G -INSTRUCTIONS EXHtBIT I- SAME SOURCE S: SCHEDULED A-EQUIPMENT FAILURE 1-MANUAL FOR PREPARATION OF DATA B-MAINTENANCE OR TEST 2 MANUAL SCRAM ENTRY SHEETS FOR UCENSEE C-fEFUEUNG 3-AUTO SCRAM EVENT REPORT (LER) FILE D-fEGULATORY RESTRICTION 4-CONTINUED (PfdFE44161)

E-OPERATOR TRAINING & 6-FEDUCED LOAD UCENSE ADMINtSTRATION 9-OTHER ,

F-ADMINISTRATION >

G-OPERATBONAL ERROR (EXPT.AH)

H-OTHER L

. MONTHLY OPERATIONAL

SUMMARY

STATEMENT i

DOCKET NO. 50-302 UNIT FLCRP-3 DATE November 2,1998 I COMPLETED BY T\'Jao l TELEPHONE (352) 795-6486 I.

MONTH: OCTOBER 1998 l

SUMMARY

STATEMENT: -

Crs/stal River Unit #3 operated at full power for the month of October with the exception of a power reduction to 89% on 10/17 to perform main turbine valve testing.