RO 77-103E:on 770903,unplanned Radioactive Gas Release to Auxiliary Bldg Occurred.Caused by Concentrated Waste Storage Tanks Loop Seals Being Blown.Loop Seals re-established & Sys Mods Initiated to Prevent Future Occurrences
ML19340A459
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/09/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19340A456 List:
References
NUDOCS 8003260798
Download: ML19340A459 (2)


Text

4 0

[PLEAbt PHINI ALL HLUUlHLU trJFQH.'.1 AT*CN e

e r

e t

6 1

LEENSE EVENT

'N tCENSEE LCENSE NUMBER TYPE TYPE

] (f l L l Cl R l P l 3 ]

l 0 l 0 l-l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l l411l1l1l1l l0l1l NAME 25 26 30 31 32 89' 14 15 DOCKET NUMBER EVENT DATE REPCRT CATE

] CONT l -l -l W

l0 l5 l0 l-l0 l3 l0 l2 l l0 l9 l0 l3 l 7l 7l l 0 l 9 l0']9 l7 l7 CATEGORY T PE u

u 57 58 59 60 61 68 69 74 75 EVENT DESCRIPTON 3 l In mode 1 operation, an unplanned radioactive g... release to the Auxiliary Building -

o Redundancy N/A.

}loccurredcontrarytoEnvironmentalTechnicalSpecification5.6.2.A.

C9 E

The sixth occurrence of this event.

R9 j l The guxiliary Building was evacuated immediately.

B9 (LER 77-103E)

)l E.

U9

}I

-E a9 VOLATCN C DE ODE COMPONENT CODE l l'M] Bl Q lZ l Zl Zl Zl ZI Zl

[Z,j lZ l 9l 9l 9l lN l 39 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION

')

l [ This occurrence was due to the concentrated waste storage tanks loop seals being blown.

E: l l l The loop seals were re-established. Proposed. system modifications should preclude j

19 6;

,g 1l recurrence.

e; I I9 METHOO OF STATUS

% POWER OTHER STATUS DISCOVERY DISCOVERY DESCRIPTON FACILrry L

9 10 12 13 44.

lAj l High radiation on RMA-2g & 3G shutting y

l0l9]9] l NA l

SC I 45 46.(See additional factors 18)

~

gAMjF LOCATCN OF RELEASE AMOUNT OF AcTMTV

'OF RELEASE l 57 curies noble gas l

l Release to Aux. Bldg. vent to atmosphere RELEASED W

y BC j 9

10 11 44 45 j

PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTON Ininini Iz_l l

NA 9

11 12 13 PERSONNEL INJURIES

  • NUMBER DESCRIPTON I

l0l0l0l'l NA 6C 9

11 12 OFFSITE CONSEQUENCES 9

yl LOSS OR OAMAGE TO FACIUTY TYPE DESCRPTON d (l NA 9

10 PUBUCITY NA l

8003260'7 ADDITIONAL FACTORS l

off Auxiliary Bld;; ventilation fans.

/

9 SEE ATTACHED SUPPLEMENTARY INFORMATION l

/

v.

P'. Stewart - ( \\T 813/866-41s9 PsONE:

no -

t x.)

2,

m:L m-

-m SUPPLEMENTARY INFORMATION Report No.:

50-302 /77-103E Facility:

Crystal River Unit #3 Report Date:

9 September 1977

~

Occurrence Date:

3 September 1977 Identification of Occurrence:

Unplanned gu release reported in accordance eith ETS 5.6.2.(A).

Conditions Prior to Occurrence:

Normal power operation. Prepering to vent Makeup Tank via low pressure Waste Gas Header..

Description of Occurrence:

At 0716 upon venting the Makeup Tank to the low pressure Waste Gas Eeader, airborne radiation monitors RMA & RNA-3 alarmed ' actuating appropriate ventilation trips.

Subsequent investigation revealed that the source of the release was the loop seal on the miscellaneous Waste Evaporator. Loop seal was re-established upon discovery.

The maximum release' rate at the peak of the discharge profile was 0.53% of the most restrictive limit set forth in Environmental Technical Specification 2.4.2.A(1).

System modifications to prevent occurrences of this nature have been initiated and -

submitted to Production Engineering.

Designation of Apparent Cause:

Pressure in the low pressure Waste Gas Header exceeded loop seal capability.

Analysis of Occurrence:

There was no consequence to the health or safety of the plant or public because of the very small release rate.

Corrective Action:

Proposed modifications noted in the Description of Occurrence should preclude recur-rence of this nature.

[

Pailure Data:

This has been a repetitive problem.

/

/

//

_