Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G019 | 15 October 1999 | Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair | |
3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated | 13 October 1999 | Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated | |
ML20217B093 | 6 October 1999 | Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue | |
ML20212L088 | 4 October 1999 | SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 | Coatings Nondestructive Examination VT-2 |
ML20212J863 | 1 October 1999 | Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) | Incorporated by reference |
ML20212E903 | 30 September 1999 | FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 | Emergency Lighting Loss of condenser vacuum |
3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With | |
ML20212E691 | 21 September 1999 | Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 | Safe Shutdown Reactor Vessel Water Level |
ML20211L132 | 31 August 1999 | EAL Basis Document | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Internal Flooding Earthquake Pressure Boundary Leakage Unidentified leakage |
3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With | |
ML20212C150 | 31 August 1999 | Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 | Boric Acid Ultimate heat sink Safe Shutdown Earthquake Operating Basis Earthquake Finite Element Analysis Earthquake Control of Heavy Loads Fuel cladding |
ML20211B729 | 16 August 1999 | Rev 2 to Cycle 11 Colr | Shutdown Margin |
ML20210P111 | 5 August 1999 | SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld Scaffolding |
ML20210U534 | 31 July 1999 | Monthly Operating Rept for July 1999 for Crystal River,Unit 3 | |
ML20209F560 | 31 July 1999 | EAL Basis Document, for Jul 1999 | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Time to boil Internal Flooding Operating Basis Earthquake Earthquake Pressure Boundary Leakage Unidentified leakage |
3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With | 30 June 1999 | Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With | |
ML20210U541 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 | |
3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With | 31 May 1999 | Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With | |
ML20210U560 | 31 May 1999 | Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 | |
ML20195C627 | 28 May 1999 | Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates | |
ML20196L203 | 19 May 1999 | Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs | Loop seal Non-Destructive Examination Weld Overlay Hydrostatic Probabilistic Risk Assessment Finite Element Analysis Large early release frequency Stress corrosion cracking Power change Flow Induced Vibration Exclusive Use Operational leakage |
3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With | |
ML20210U563 | 30 April 1999 | Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 | |
3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With | |
ML20204D966 | 31 March 1999 | Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept | |
3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease | 10 March 1999 | Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease | |
3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With | |
ML20203A438 | 3 February 1999 | Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50 | Safe Shutdown |
ML20206E989 | 31 December 1998 | Kissimmee Utility Authority 1998 Annual Rept | |
ML20206E902 | 31 December 1998 | Florida Progress Corp 1998 Annual Rept | |
ML20206E970 | 31 December 1998 | Ouc 1998 Annual Rept. with Financial Statements from Seminole Electric Cooperative,Inc | |
3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With | |
ML20206E926 | 31 December 1998 | Gainesville Regional Utilities 1998 Annual Rept | |
3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With | |
3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With | |
ML20155F407 | 31 October 1998 | Rev 2 to Pressure/Temp Limits Rept | Hydrostatic |
ML20155J270 | 28 October 1998 | Second Ten-Year Insp Interval Closeout Summary Rept | Hydrostatic |
3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With | |
ML20206E946 | 30 September 1998 | Utilities Commission City of New Smyrna Beach,Fl Comprehensive Annual Financial Rept Sept 30,1998 & 1997 | Exclusive Use |
ML20206E956 | 30 September 1998 | City of Ocala Comprehensive Annual Financial Rept for Yr Ended 980930 | |
ML20206E910 | 30 September 1998 | City of Bushnell Fl Comprehensive Annual Financial Rept for Fiscal Yr Ended 980930 | |
ML20206E981 | 30 September 1998 | City of Tallahassee,Fl Comprehensive Annual Financial Rept for Yr Ended 980930 | Exclusive Use |
ML20195E312 | 30 September 1998 | Comprehensive Annual Financial Rept for City of Leesburg,Fl Fiscal Yr Ended 980930 | |
3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With | |
ML20236W650 | 31 July 1998 | Emergency Action Level Basis Document | Safe Shutdown Health Physics Network High winds Shutdown Margin Ultimate heat sink Internal Flooding Earthquake Pressure Boundary Leakage Unidentified leakage |
3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 | 31 July 1998 | Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 | |
ML20236V880 | 30 July 1998 | Control Room Habitability Rept | Loop seal Power Uprate |
3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 3 | 30 June 1998 | Monthly Operating Rept for June 1998 for Crystal River Unit 3 | |
ML20236Q461 | 30 June 1998 | SER for Crystal River Power Station,Unit 3,individual Plant Exam (Ipe).Concludes That Plant IPE Complete Re Info Requested by GL 88-20 & IPE Results Reasonable Given Plant Design,Operation & History | Mission time |
3F0698-02, Monthly Operating Rept for May 1998 for Crystal River Unit 3 | 31 May 1998 | Monthly Operating Rept for May 1998 for Crystal River Unit 3 |