Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217G01915 October 1999Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair
3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated13 October 1999Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated
ML20217B0936 October 1999Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue
ML20212L0884 October 1999SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3Coatings
Nondestructive Examination
VT-2
ML20212J8631 October 1999Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i)Incorporated by reference
ML20212E90330 September 1999FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999Emergency Lighting
Loss of condenser vacuum
3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With30 September 1999Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With
ML20212E69121 September 1999Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50Safe Shutdown
Reactor Vessel Water Level
ML20211L13231 August 1999EAL Basis DocumentSafe Shutdown
Health Physics Network
High winds
Shutdown Margin
Ultimate heat sink
Internal Flooding
Earthquake
Pressure Boundary Leakage
Unidentified leakage
3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With31 August 1999Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With
ML20212C15031 August 1999Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239Boric Acid
Ultimate heat sink
Safe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
Earthquake
Control of Heavy Loads
Fuel cladding
ML20211B72916 August 1999Rev 2 to Cycle 11 ColrShutdown Margin
ML20210P1115 August 1999SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3Boric Acid
Hydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Dissimilar Metal Weld
Scaffolding
ML20210U53431 July 1999Monthly Operating Rept for July 1999 for Crystal River,Unit 3
ML20209F56031 July 1999EAL Basis Document, for Jul 1999Safe Shutdown
Health Physics Network
High winds
Shutdown Margin
Ultimate heat sink
Time to boil
Internal Flooding
Operating Basis Earthquake
Earthquake
Pressure Boundary Leakage
Unidentified leakage
3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With30 June 1999Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With
ML20210U54130 June 1999Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3
3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With31 May 1999Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With
ML20210U56031 May 1999Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3
ML20195C62728 May 1999Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates
ML20196L20319 May 1999Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through SgsLoop seal
Non-Destructive Examination
Weld Overlay
Hydrostatic
Probabilistic Risk Assessment
Finite Element Analysis
Large early release frequency
Stress corrosion cracking
Power change
Flow Induced Vibration
Exclusive Use
Operational leakage
3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With30 April 1999Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With
ML20210U56330 April 1999Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3
3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With31 March 1999Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With
ML20204D96631 March 1999Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept
3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease10 March 1999Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease
3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With28 February 1999Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With
ML20203A4383 February 1999Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50Safe Shutdown
ML20206E98931 December 1998Kissimmee Utility Authority 1998 Annual Rept
ML20206E90231 December 1998Florida Progress Corp 1998 Annual Rept
ML20206E97031 December 1998Ouc 1998 Annual Rept. with Financial Statements from Seminole Electric Cooperative,Inc
3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With31 December 1998Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With
ML20206E92631 December 1998Gainesville Regional Utilities 1998 Annual Rept
3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With30 November 1998Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With
3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With31 October 1998Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With
ML20155F40731 October 1998Rev 2 to Pressure/Temp Limits ReptHydrostatic
ML20155J27028 October 1998Second Ten-Year Insp Interval Closeout Summary ReptHydrostatic
3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With30 September 1998Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With
ML20206E94630 September 1998Utilities Commission City of New Smyrna Beach,Fl Comprehensive Annual Financial Rept Sept 30,1998 & 1997Exclusive Use
ML20206E95630 September 1998City of Ocala Comprehensive Annual Financial Rept for Yr Ended 980930
ML20206E91030 September 1998City of Bushnell Fl Comprehensive Annual Financial Rept for Fiscal Yr Ended 980930
ML20206E98130 September 1998City of Tallahassee,Fl Comprehensive Annual Financial Rept for Yr Ended 980930Exclusive Use
ML20195E31230 September 1998Comprehensive Annual Financial Rept for City of Leesburg,Fl Fiscal Yr Ended 980930
3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With31 August 1998Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With
ML20236W65031 July 1998Emergency Action Level Basis DocumentSafe Shutdown
Health Physics Network
High winds
Shutdown Margin
Ultimate heat sink
Internal Flooding
Earthquake
Pressure Boundary Leakage
Unidentified leakage
3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 131 July 1998Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1
ML20236V88030 July 1998Control Room Habitability ReptLoop seal
Power Uprate
3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 330 June 1998Monthly Operating Rept for June 1998 for Crystal River Unit 3
ML20236Q46130 June 1998SER for Crystal River Power Station,Unit 3,individual Plant Exam (Ipe).Concludes That Plant IPE Complete Re Info Requested by GL 88-20 & IPE Results Reasonable Given Plant Design,Operation & HistoryMission time
3F0698-02, Monthly Operating Rept for May 1998 for Crystal River Unit 331 May 1998Monthly Operating Rept for May 1998 for Crystal River Unit 3