ML19317G189
| ML19317G189 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/05/1977 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19317G188 | List: |
| References | |
| NUDOCS 8002280830 | |
| Download: ML19317G189 (2) | |
Text
a
- LidilliSES'55/5IUT REPORT
-tf -- -
l it CUNTROL BLOCK:l l
l l
l l
l (PLEASE PRINT ALL REQUIRCD IfJFCRT.1AT*C;'y
-),.
1 s
'T!Au"l*
"E"!'
'#c"C uCENSE uuuoEa lFlL lCl Rl Pl 3l l 0 l 0*l-l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l
- l. 4l 1l 1l 1l 1l l0 l3 l 7 09 14 15 25 26 30 31 32 TN son CAftConY coCKET NUMOEA FVENT oATE REPoAT oATE OiCONT1-l-l it i It i 1015101-101310l21 l O l 7 l o is 17 17 l 1018101517 17 I 7 8 57 00 59 60 61 68 69 74 75 80 i
EVENT DESCRIPTICN 0e l On 13 July 1977, while reviewing the completed Quarterly Battery Check Surveillance l
l 7 09 80 l
gl Procedure SP-511, ic was discovered that Unit 3 was not notified of the failure of the t
l 7 80 80
@l Units 1 & 2 batteries to meet the SP requirements. Unit 3 failed to enter the Action l
7 89 60 O5 l Statement of Tech Spec 3.8.1.1.
Redundancy NA as batteries were operable.
First time l
7 09 60 oe [ occurrence. The Action Statement was entered immediately and the SP re-run.
Batteries 7 09 couTENT (See additional factors ik systiu CAusE couPoNENT CODE CODE COMPONENT CooE SUPPUER MANUFACTURER VOLATON
[017] l E l A l lBlAlTlTlRlYl
!L l l El 3 l5 l5 l W
-84) 7 09 10 11 12 17 43 44 47 48 1
CAU3E DESCRIPTION p
- ]
Oa l Units 1 & 2 personnel were not aware that. tests performed prior to required surveillance l
7 89 80 Ole l schedule which do not meet a:Ceptance criteria constitute inoperability. This has l
7 J.L 9 gO l
been correcte'd.
l FACAJTY METHoo op STATUS
% POWER oTHER STATUS o.SCoVERY oISCoVERY oESCAPTCN l El l 1l 0l 0l l NA l
lCl l
NA l
78 9
10 12 13 44 45 46 80 ACTMTY CoATENT RELEASEo oF RELEASE l AMOUNT oF ACTMTY LoCATCN OF AELEASE 12 l Zl
{
Ni l
l NA l
1 7 8 9
10 11 44 45 00 PERSONNEL EXPOSURES NUMOEA TYRE oESCRPTON Q l 0l 0l Jl Ul NA
.l 7 89 11 12 13 80-PERSONNEL INJUR:ES NUMDEA oESCF.PTtON lO!0l0l l
NA 14 l
7 89 11.1 2 60 OFFSrTE CONSEQUENCES gl NA l
7 00 00 LOSS OR DAMAGE TO FACILITY s
3 lj;_'Ej l
NA l
TYt CESCRPTON l
7 8D 10 LO PUBLICITY 8i NA I
7 89 gl0 CITIONAL FACTORS See attached Supolementarv Information 8002 280 M
j 7 00 "U
)
declared operable within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
bl l
7 u9 i,u NAME:
P.
Stewart k _\\ - -
PHONE: (813) 866-4159 ceo a n.
- r. 7
~
.,s SUPPLEMENTAPI INFORMATION g
Report No.:
50-302/77-84 2.
Facility:
Crystal River Unit #3 i-3.
Report Date:
5 August 1977 4.
Occurrence Date:
6 July 1977 5.
Identification of Occurrence:
Failure to enter Action Statement of Technical Specification 3.8.1.1 upon failure of Units 1 & 2 batteries to meet requirements of the Quarterly Battery Check SP-511.
6.
Conditions Prior to Occurrence:
Mode 1 power operation 7.
Description of Occurrence:
j On 13 July 1977, examination of Units 1 & 2 battery surveillance disclosed that, in anticipation of an upcoming surveillance test, a preliminary test had been performed on s'
i 6 July 1977. Several cells' specific gravity had dropped more than.01 from the pre-i vious quarter, but did meet acceptance criteria in other respects. Upon this dis-closure, Action. Statement was entered. The batteries in question meanwhile had been en charge and passed the surveillance and were declared operable within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
Designation of Apparent Cause:
Units 1 & 2 personnel were not aware that tests performed prior to required sur-ve111ance schedule which do not meet acceptance criteria constitute inoperability.
This has been corrected.
i 9.
Analysis of Occurrence:
There vera no safety implications in that the batteries were functioning in their intended service during the time in question.
10.
Corrective Action:
A meeting was held on 14 July 1977 by the Compliance Staff with all concerned personnel, to formally instruct them of correct actions to be taken with respect to Tech Spec requirements.
11.
Failure Data:
This was the first occurrence of this event.
s w
+w-v-
m y.-w-,
em.-
w
-4 a-Mv
-,----+w---------.ewwy
+y.e--ww-g-w w'w