ML19308D471
| ML19308D471 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 11/07/1977 |
| From: | FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19308D446 | List: |
| References | |
| NUDOCS 8002280781 | |
| Download: ML19308D471 (1) | |
Text
,
ENilRONMENTAL LICENSEE EVENT REPORT 77-133E cility:
Crystal River Unit #3 2.
Report Date:
I November 1977 3.
Cccurrence Date:
30 September through 7 October 1977 4.
ConfiHiation Date: 28 October 1977 5.
Identification of occurrence:
Air inhalation sample station C41 showed gross S activity in excess of ten times the control station activity.
6.
Conditions Prior to Occurrences Crystal River Unit #3 was operating in Mode 1, power operation.
7.
Description of occurrence:
The weekly ai; umple at station C41 for 30 September - 7 October 197'~ was analyzed for I-131 activity. The activity was 0.13 pCi/m3 This is greater s.
than 10 times the control station value which is the smaller of 0.004 pC1/m3 (upper 95% percentile value from the preoperational program) or 0.13 pC1/m3 (upper 95 percentile from operational stations outside of the plant's influence).
8.
Designation of Apparent Cause:
The apparent cauac of this occurrence is the fallout resulting from the nuclear weapons tent by the Peoples Republic of China on 19 September 1977.
A sittilar increase in airborne activity levels was reported throughout the State of Florida.
[9. Analysis of Occurrence:
Crystal River Unit #3 did not cause the radiological environmental monitoring reporting level to be exceeded.
O.
Previous Occurrenecs:
This is the accond occurrence of this particular t.ype subseque_nt to the issuance of the Crystal River Unic #3 Facility Operating License, humorous similar occurrences were detected during the preoperational program.
@]D D
J w JU rm D '9'T
~
J
.3.S.1.
a 8002280 N
.