August 21, 1980 Director Deputy Director
-- a Ass't to Director Admin. Of ficer RONS Chief RCES Chief Mr. C. ?. O'Reilly, Director pygg g C. S. Nuclear Regulator / Co r:rission Sfgde Chief Of fice of Inspectier.
I, Inforcenent P A Officer 131 l',triet. a St., Suite 3100 Atlanta, CA 303C3 h'
- b'\\ 05Ci'.
P.E Docket asc-302 Licerse CPR-72
.deASMS This will confir:s a report to Bob Martin of you: office at C950 on Thursday, August 21, 1990.
During. surveillance of cireciating water discharge terparature, it was discovered that the texperature at the coint of discharge ex-ceeded 103*P.
Circulsting water flow was increased by starting Decay Hea. Seawater Pusps RWP-3A and 3Dr Units 1 and 2 load was reduced by 100 m,.
Tenperature ceraained greater than IC3*r f rc.v.
16CO until 2100 on August 21, 198C.
This created an ever.t cor.-
trary to Enviro:nsntal Technical Specification 2.1.2 and reportable under Environt ental Technical Specification 5.2.2(A).
A detailed report of this event will follow within fifteen (15) days.
P D. C. Poole Tills 00UMEl!T Col!Tm:iS
~ ***' ' """ "*"*'*"
bOOlQUS.lTlP2GE3 Crystal River tJnit 43
' N--
_....[.,,_f rys ta1 R1Ye:, FL 32629 vwJth
//\\ 001 S
//D 8011110030 CRYSTAL RIVER. UCLE AR PLANT P.O. BOX 12a0, CRYSTAL RIVER, FLA.32629
.