Ro:On 800821,during Surveillance of Circulating Water Discharge Temp,Temp at Point of Discharge Exceeded 103 F, Contrary to EIS 2.1.2.Cause Not Stated.Detailed Rept to Follow
ML20049A330
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/21/1980
From: Poole D
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8011140030
Download: ML20049A330 (1)


Text

  • l p

.T j,i'f[ifM, USNR0 RE

[

ATLANTAg.2[,3 t4*',',,.3gy

~...,

'iti).O.l Ffg

'<i.

~&

4

, r oc 9? AB. 35

.g.gg

' l " *' t :

p So. w..er 2

August 21, 1980 Director Deputy Director

-- a Ass't to Director Admin. Of ficer RONS Chief RCES Chief Mr. C. ?. O'Reilly, Director pygg g C. S. Nuclear Regulator / Co r:rission Sfgde Chief Of fice of Inspectier.

I, Inforcenent P A Officer 131 l',triet. a St., Suite 3100 Atlanta, CA 303C3 h'

- b'\\ 05Ci'.

P.E Docket asc-302 Licerse CPR-72

.deASMS This will confir:s a report to Bob Martin of you: office at C950 on Thursday, August 21, 1990.

During. surveillance of cireciating water discharge terparature, it was discovered that the texperature at the coint of discharge ex-ceeded 103*P.

Circulsting water flow was increased by starting Decay Hea. Seawater Pusps RWP-3A and 3Dr Units 1 and 2 load was reduced by 100 m,.

Tenperature ceraained greater than IC3*r f rc.v.

16CO until 2100 on August 21, 198C.

This created an ever.t cor.-

trary to Enviro:nsntal Technical Specification 2.1.2 and reportable under Environt ental Technical Specification 5.2.2(A).

A detailed report of this event will follow within fifteen (15) days.

P D. C. Poole Tills 00UMEl!T Col!Tm:iS

~ ***' ' """ "*"*'*"

bOOlQUS.lTlP2GE3 Crystal River tJnit 43

' N--

_....[.,,_f rys ta1 R1Ye:, FL 32629 vwJth

//\\ 001 S

//D 8011110030 CRYSTAL RIVER. UCLE AR PLANT P.O. BOX 12a0, CRYSTAL RIVER, FLA.32629

.