RO-77-83:on 770712,level a Channel Removed from Svc Due to Disagreement Between a & B Level Channels.Caused by Level Indication Transmitter Calibr Shift.Instrument Calibr & Channel Operability Restored
ML19317G186
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/05/1977
From: Stewart W
FLORIDA POWER CORP.
To:
Shared Package
ML19317G181 List:
References
NUDOCS 8002280824
Download: ML19317G186 (2)


Text

_

~

LICENSEE EVENT REPC'T

..s i{

(,)~ C$NTROL BLOCK.l l

l l

l l

l

[PLEASE PRINT ALL REQUIRED inFORT.1AT*CtJ) 1 1

6 Ifaut LcENSE NUMDER E

TYFC lF lL l Cl Rl Pl 3l l 0 l 0-l-l 0l 0l 0l 0l 0l-l 0l 0l l 4l 1l 1l 1l1l l0l3l 7 89 14 15 25 2G 30 31 32 lN son cATEcoAY T

DOCKET NUMBER EVENT DATE REPOAT oATE 0 1 CcN T l - l _ l Ll lL l l0l5l0l-l0l3l0l2l l 0 [ 7 l1 l2 l7 l7 l

[0 l8 l0 l5 l7 l7 [

7 8 57 00 09 60 61 68 69 74 75 80 EVENT DESCRIPTION Ql Due to a disagreement in the level indication of the "A" and "B" level channels of the l

7 09 60 0

l BWST, the "A" channed. was removed from service. This action resulted in having less than l 7 o9 go gl the minimum required level indication channels as defined by Table 3.3-10 of Tech Spec l

3.3.3.6.

Redundancy was maintained with the

','B" level indication channel.

First time e

05 7 o9 occurrence.

"B" level channel restored operable on 13 July 1977.

(LER 77-83) 60 g[

7 89 paMe 80 DE CODE COMPONENT CCCE A

V N TON b lSlFl lIlN lS lT l RlUI lN l l Bl 0 l4 l5 l l Nl

(

7 89 10 11 12 17 43 44 47 48 CAUSE DESCRIPTION

)

E

@ l This. event was due to a calibration shift of level indication transmitter. Instru=ent was j

7 89 SO O9 l calibrated and channel restored operable.

l 7 09 80 V

l FACIUTY METHOD OF STATUS

% POWER oTHER STATUS CGCQVERY DSCOVERY DESCRPT'.CN l El l 1l 0l 0l l

NA l W l

NA l

1 7-G 9

10 12 13 44 45 46 60 ACTMTY CONTENT RELEASED OF AELEASE l AMOUNT OF ACTMTV.

LOCATON OF DELEASE 1

l Zl

]

NA l

l NA l

7 8 9

10 11 44 45 80 PERSONNEL EXPOSURES NUMOEA TYPE CESCRIPTCN 3 l Ol 0l 0l Wl NA l

7 89 11 12 13 60 -

PERSONNEL INJURIES NUMOEA DESCRiPTON 8 I ni ni 7

89'

' nl l

NA l

~11 12 60 OFFSITE CONSEQUENCES 15 l NA l

7 00 00 LOSS OR DAMAGE TO FACIUTY TYPE CECCR:PTCN I

7 89 10 60 PUBLICITY 8I I

7 80 00

^ 'OITIONAL FACTORS gQQg g8Q 11 See attached Sucolerentary Information

,j f

uo Ohl 1 C

I

/ UD g

Hu NAME:

N.

P.

9 vart Ib PHONE: (813) 866-4159 7

/

e,. o. u.. o

SUPPLEMENTARY INFORMATION Report No.:

50-302/77-83 2.

Facility:

Crystal River Unit #3_

3.

Report Date:

~ 5 August 1977 4.

Occurrence Date; 12 July 1977 5.

Identification of Occurrence:

Failure to have two chancels of Borated Water Storage Tank level indication operable as required by Table 3.3-10 of Technical Specifications 3.3.3.5.

6.

Conditions Prior to Occurrence:

Mode 1 power operation 7.

Description of Occurrence:

At 1500 the "A" Borated Water Storage Tank level channel was taken out of service to i

perform maintenance, as there had been a disagreement between the indications of the "A" and "B" channels. A determination was made that the "A" channel was in error.

The action statement of Tech Spec 3.3.3.6 was entered and maintenance restored the "A" channel operability'of 13 July 1977.

% Designation of Apparent Cause:

This event was due to a calibration shift of the "A" level transmitter.

s 9.

Analysis of Occurrence:

There was no safety hazard to the plant or public, as the redundant "B" channel of level indication was operable and in service.

10.

Corrective Action:

None required as normal maintenance restored operability.

J 11.

Failure Data:

This 'fas the first occurrence of this event.