.. . . . . . - . - _ - . ~ . -. - . _ . _ - . _ . _ . . . . . -

THIS DOCUMENT CONTAINS POOR QUALITY PAGES 79080-01P

[

8 4

USNRC RE -'

! ATtANTA.ar **"-

1 -

} 17 August 1979 i I9 AUC20 A 8: 39

i. -

' Mr. J. F. O'Reilly, Director

}

  • U53RC Region 11 Office of Inspection and Inforcement 101 Marietta St., Suite 3100 Atlants, Georgia 30303 RE: Docket 50-302 Licensee DPR-72

, This will confirm a report to Mr. G. R. Jenkins of vour office at 1627 on 17 August 1979, that at 0600 17 August 1979, an unplanned release of radioactive liquid occurred vben the Turbine Building sump was pu: sped to the settling pond. This is contrary to ETS 2.4.1.A and is reported under the provi-siens of E75 5.6.2.A(2).

The esiculated activity for the 82,500 sailon composite sample

' was 1.22 MPC's with a total activity of 525 uc.

The hesich and saf ety of the plant and genersi public were not endangered as a result of this event.

A detailed report of this event will follow within fourteen (14) days.

Guy F. Beatty, Jr.

Nuclear F1snt Manager Crystal River Unit #3 Florida Power Corporation

/pkt Ifo 790gg8osy -

.