Text
_ _____
LIUliNUbb EVENI liLPUH I
.I
.i -
CONTROL ULOCK:l l
l l
l l
(PLcAss en!NT f.LL REQUtnED IrJrOfL.1 AT;0N,'
},
1 U
'i!N'
'"v',"E
'?15!'
T terns. NuoCcn vi r i ci ni gl,l 10101-10101010101-1o101 14 I 11111111 1013]
7 09 14 in 25 26 30 31 32 "7p7 Sc';M T
DOCKET NUMOCR EVENT Daft RCPoRf DATC
..a.ttcCnv ECON r l !
LkJ Lt_1 lo is I ol-l o 1,1012 I lo la in I61717I InialvIa17 lv i 7 6 57 50 SU 60 61 68 69 74 75 UO i
EVENT OESCniPTION I
HE l Normal Mode I operation, inoperable position indicator for Rod 5. Group 8 ( ASPR's) con-7 09 60 !
l l HE I trary to Technical Specification 3.1.3.3.
No redundant systems available.
First occur-7 89 80 C4 l rence of this type.
Complied with Technical Specification Action Statement 3.1.3.3.A.2.B. l l 7 89 60 !
hl System restored operable on 8 April 1977.
I 7 U9 60 l gl (LER-77-33) l J 60 7 89 prtue CONE COMPCNENT CCCE y A vet.ATON CE O7 lI l Dl W l Il Nl Sl Tl Rl Ul W
l A l3 l 8l0 l lN l 7 89 10 11 12 17 43 44 47 48 CAUSE CESCRIPTION j8 5.
@l Inoperable absolute position indicator caused by amphenol connector faulty oin connection. I 7 89 00 3l l Connector was repaired and operability restored.
I 7 JL9 80 l
I STA
% POWER OTHER STATUS OtSCOVERY CfSCOVERY CISCR:PI;CN W
l 017l 4 l l N/A I
I Al I
N /.*
I 70 9
10 12 13 44 45 46 80
.N C
EASE AMCUNT OF ACTfVITY LOCATCN OF AELEASE A
IIE W
Wl N/A l
l N/A l
7 8 9
10 11 44 45 EO j
PERSONNEL EXPOSURES NUMtf(R TYP6 CESCRIPTON 13 l0l0l0l
[Zj l
N/A l
7 89 11 12 13 DO PERSONNEL IN.URIES NuuotR otScTupTON h l0l0l0l l
N/A l;
7 89 11 12 00 i
OFFSITE CONSEQUENCES 1
l N7A j
7 00 LO LOSS On OAMAGE TO FAC:LITY i
TYPE DECCTtiPTON
{
l N/A I
1i 7 u9 10 00 PUQUCITY l
l N/A 1
7 0D CU 8 0 02 260 ff(
O!TIONAL FACTORS See attached Supplementarv Information
.l.
> 00 u's aus 7 uU
{7 W
P. Stewart psONt; (813) AAA-alco NAMC:
j
_ cro.,,...,
~
SUPPLEMENTARY INFORMATION 1
1.
Report No.:
50-302/77-33 2.
Facility:
Crystal River Unit #3 3.
Report Date: 28 April 1977 4.
Occurrence:
6 April 1977 5.
Identification of occurrence:
In the process of moving Group 8, Axial Power Shaping Rods (APSR's),
the absolute position indicaor for Rod 5 failed causing a condition contrary to Technical Specification 3.1.3.3.
6.
Conditions Prior to Occurrence:
Normal Mode I operation.
7.
Description of Occurrence:
2 At 0812, while adjusting a power imbalance wit! Group 8 Rods, absolute pcsition indicator for Rod 5 failed. Rod posi*. ion was verified by the Rod Zone Limit Switch. Commenced logging position agreement between r
reference indicator and the operable position indication as per SP-300.
l
(
Position indicator for Rod 5 was restored operable during shutdown on 8 April 1977.
8.
Designation of Apparent Cause of Occurrence:
The amphenol connector to the position indicator was found to have a faulty pin connection.
9.
Analysis of Occurrence:
There were no safety implications as the Reactor could have been safely shut down at any time.
10.
Corrective Action:
The amphenol connector was repaired and absolute position indicator for Rod 5 of Group 8 was restored operable.
11.
Failure Data:
This occurrence wat non-repetitive for the APSR group.
-