ML20210U560

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3
ML20210U560
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/31/1999
From: Barbieri L
FLORIDA POWER CORP.
To:
Shared Package
ML20210U530 List:
References
NUDOCS 9908200162
Download: ML20210U560 (1)


Text

,

,s *

  • e APPENDIX A OPERATING DATA REPORT DOCKET NO. 50-302 UNIT NAME FLCRP-3 DATE June 4,1999 COMPLETED BY L.J. Barbieri TELEPHONE (352) 795-6486 x3761 REPORTING PERIOD (Month / Year): May 1999 MONTH YEAR TO DATE CUMULATIVE 1 DESIGN ELECTRICAL RATING (MWe-Net) 825 2 MAXIMUM DEPENDABLE CAPACITY (Mwe-Net) 818 3 NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3,623.0 128,948 4 NUMBER OF HOURS THE GENERATOR WAS ON 744.0 3,623.0 126,730 5 UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0 6 NET ELECTRICAL ENERGY GENERATED (MWH) 626,418 3,(M2,697  %,926,949 l 9908200162 990813 l PDR ADOCK 05000302 l R PDR

______